User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:06, 22 October 2015 diff hist +4 m Category:101 Standard Forms →Bridge: Per BR, corrected error in Floodplain Development Permit Application
- 07:16, 22 October 2015 diff hist -332 m Main Page
- 07:15, 22 October 2015 diff hist -28 m Main Page EPG 238.2.18.6
- 07:12, 22 October 2015 diff hist +343 m 238.2 Land Surveying →238.2.18.6 Recording the Location Survey Plan: Per CM & DE, revised process to complete location survey plan. A reminder mechanism created to help avoid delays to recording location survey plans
- 13:03, 21 October 2015 diff hist 0 N File:Main Page Oct 21, 2015.jpg current
- 13:02, 21 October 2015 diff hist -40 m Main Page
- 10:57, 21 October 2015 diff hist -316 m LPA:136.13 LPA Policy Changes Per LPA, Oct version of Fig 136.4.1 was deemed premature.
- 10:57, 21 October 2015 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Premature version of Fig. 136.4.1 removed and replaced with June version
- 10:56, 21 October 2015 diff hist +7 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, reverted to June 2015 version of Fig. 136.4.1.
- 07:58, 21 October 2015 diff hist -1 m LPA:136.13 LPA Policy Changes
- 07:57, 21 October 2015 diff hist +317 m LPA:136.13 LPA Policy Changes Fig. 136.4.1
- 07:55, 21 October 2015 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1
- 07:54, 21 October 2015 diff hist 0 N File:Fig. 136.4.1 Oct 2015.docx
- 07:53, 21 October 2015 diff hist -7 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Article V, Period of Service, modified so that Construction Phase, including close-out documentation, shall be completed 60 days after final acceptance of project.
- 07:17, 21 October 2015 diff hist +245 m LPA:136.13 LPA Policy Changes EPG 136.11.19
- 07:12, 21 October 2015 diff hist +115 m LPA:136.11 Local Public Agency Construction →136.11.19 Final Acceptance: Per LPA, clarification, particularly to the terms "corrections" vs. "exceptions", for LPAs performing Final Acceptance of an LPA project
- 14:46, 20 October 2015 diff hist +253 m LPA:136.13 LPA Policy Changes EPG 136.11.18
- 14:43, 20 October 2015 diff hist +23 m LPA:136.11 Local Public Agency Construction →136.11.18 Final Plans: Per LPA, add a reference to EPG 136.11.19 and removed reference to Engineer on Record (EOR) to clarify bridge plan Final Plans requirements.
- 13:48, 20 October 2015 diff hist 0 N File:Main Page Oct 20, 2015.jpg current
- 13:48, 20 October 2015 diff hist +5 m Main Page
- 12:21, 20 October 2015 diff hist +1,351 m 751.5 Structural Detailing Guidelines →751.5.8.1 Bridge Approach Slab: Per BR, for convenience, added links to Bridge Standard Drawings
- 09:10, 20 October 2015 diff hist +253 m LPA:136.13 LPA Policy Changes CUF Form
- 09:08, 20 October 2015 diff hist +111 m LPA:136.12 Figures, Glossary and Other Useful Links for convenience, added CUF Form to figure box
- 09:05, 20 October 2015 diff hist +93 m LPA:136.11 Local Public Agency Construction Per LPA, for convenience, added CUF Form to figure box.
- 08:42, 20 October 2015 diff hist 0 N File:409 Seal Coat Traffic Control 3.pdf
- 08:42, 20 October 2015 diff hist 0 N File:409 Seal Coat Traffic Control 2.pdf
- 08:42, 20 October 2015 diff hist 0 N File:409 Seal Coat Traffic Control 1.pdf
- 08:42, 20 October 2015 diff hist 0 N File:409 Seal Coat Quantities.pdf
- 08:42, 20 October 2015 diff hist 0 N File:409 Seal Coat Typical.pdf
- 08:41, 20 October 2015 diff hist 0 N File:409 Seal Coat Title.pdf
- 08:41, 20 October 2015 diff hist +576 m Category:409 Seal Coat Per DE, for convenience, added pdf files of the seed files
- 08:33, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 2 MoDOT Striping.pdf
- 08:33, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 1 MoDOT Striping.pdf
- 08:33, 20 October 2015 diff hist 0 N File:402 CLC Transitions MoDOT Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Quantities MoDOT Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Typical MoDOT Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Title MoDOT Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 3 Contractor Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 2 Contractor Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 1 Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Transitions Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Quantities Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Typical Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Title Contractor Striping.pdf
- 08:30, 20 October 2015 diff hist +1,207 m Category:402 Bituminous Surface Leveling Per DE, for convenience, added pdf files of the seed files
- 07:27, 20 October 2015 diff hist +70 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance by adding a reference to the LPA RW Acquisition brochure
- 14:50, 19 October 2015 diff hist 0 m Main Page
- 14:03, 16 October 2015 diff hist -49 m Main Page EPG 236.4.6.3
- 13:49, 16 October 2015 diff hist -48 m 236.4 Description Writing and Titles →236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions: Per RW, minor change allowing conveyance of utility easements to the utility prior to completion of the project
- 12:46, 16 October 2015 diff hist 0 N File:616.23.1 daytime.jpg current