User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:28, 22 December 2015 diff hist +15 m LPA:136.11 Local Public Agency Construction Per LPA, various clarifications to Figure 136.11.4
- 14:36, 21 December 2015 diff hist +1 m Main Page
- 14:10, 21 December 2015 diff hist 0 m Category:135 The Section 106 Process →135.1 The Section 106 Process for Local Public Agencies: updated links
- 14:06, 21 December 2015 diff hist +120 m Category:135 The Section 106 Process →135.1 The Section 106 Process for Local Public Agencies: Per Historic Preservation, updated links
- 13:13, 18 December 2015 diff hist 0 N File:101 Precon letter, state Dec 2015.dotx current
- 13:13, 18 December 2015 diff hist 0 N File:101 Precon letter, federal Dec 2015.dotx current
- 13:13, 18 December 2015 diff hist -93 m Category:101 Standard Forms →Construction and Materials: Per CM, updated two pre-construction conference letters; removed Federal No Trainees precon conf letter
- 09:05, 18 December 2015 diff hist +123 m 147.3 Job Order Contracting (JOC) Per Bidding and Est, latest version of guardrail JOC JSP added
- 08:51, 18 December 2015 diff hist -106 m 910.4 ITS Architecture Per TS, updated ITS links and removed "Equipment Packages of St. Louis Regional ITS Architecture"
- 14:55, 17 December 2015 diff hist +283 m Main Page EPG 131.2
- 13:52, 17 December 2015 diff hist +1,109 m 131.2 Proprietary Items and Public Interest Findings Per EPG, revised guidance aligns with new MoDOT/FHWA oversight and partnering agreements. Revision ensures submitted items receive appropriate approvals.
- 12:12, 17 December 2015 diff hist 0 m LPA:136.13 LPA Policy Changes updated links
- 12:08, 17 December 2015 diff hist 0 m LPA:136 Local Public Agency (LPA) Policy updated link
- 12:08, 17 December 2015 diff hist -3,386 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3 Helpful Information and Links: Per LPA, removed old Local Programs info
- 15:39, 15 December 2015 diff hist 0 N File:Main Page 2 Dec 15, 2015.jpg current
- 15:38, 15 December 2015 diff hist 0 N File:Main Page Dec 15, 2015.jpg current
- 15:38, 15 December 2015 diff hist +49 m Main Page
- 14:44, 11 December 2015 diff hist +255 m Category:505 Bridge Deck Concrete Wearing Surface Per CM, added PowerPoint version of the Latex Modified Concrete Best Practices Tutorial
- 12:19, 11 December 2015 diff hist +30 m Category:409 Seal Coat updated link to new JSP Packages database in SharePoint
- 12:18, 11 December 2015 diff hist +25 m Category:402 Bituminous Surface Leveling updated link to new JSP Packages database in SharePoint
- 11:51, 11 December 2015 diff hist +97 m 147.3 Job Order Contracting (JOC) updated JOC links
- 11:16, 11 December 2015 diff hist +1 m Category:1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components →1052.2.3.6 Compressive Strength Test: reverted to old test method AASHTO T141 to coordinate with specs for the revision to AASHTO R 60)
- 11:14, 11 December 2015 diff hist -278 m Main Page removed EPG 1052 revision
- 11:08, 11 December 2015 diff hist -78 m Main Page EPG 110.2, EPG 1052
- 10:19, 11 December 2015 diff hist 0 N File:110.2 Unemployment Benefits sp 2015.pdf
- 10:18, 11 December 2015 diff hist 0 N File:110.2 Unemployment Benefits 2015.pdf
- 10:18, 11 December 2015 diff hist 0 N File:110.2 Workers Compensation sp.pdf
- 10:18, 11 December 2015 diff hist 0 N File:110.2 Your Rights sp 2015.pdf
- 10:18, 11 December 2015 diff hist 0 N File:110.2 OSHA 3167 sp 2015.pdf
- 10:17, 11 December 2015 diff hist 0 N File:110.2 OSHA 3165 2015.pdf
- 10:17, 11 December 2015 diff hist 0 N File:110.2 Notice FHWA 1022 2015.pdf
- 10:16, 11 December 2015 diff hist 0 N File:110.2 checklist Dec 2015.pdf
- 10:16, 11 December 2015 diff hist +15 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, updated several required posters
- 08:22, 11 December 2015 diff hist -3 m Category:1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components →1052.2.3.6 Compressive Strength Test: Per Phys. Lab, AASHTO test method name changed from the now-defunct AASHTO T141 to AASHTO R 60
- 14:03, 10 December 2015 diff hist +1 m Main Page
- 14:03, 10 December 2015 diff hist -211 m 147.3 Job Order Contracting (JOC) Per Bidding and Est, guardrail JOC JSP temporarily removed prior to being updated; the Combined Guardrail and Guard Cable JOC JSP will no longer be utilized
- 11:10, 10 December 2015 diff hist +66 m Main Page EPG 147.3
- 10:42, 10 December 2015 diff hist 0 N File:147 asphalt pavement repair 2015.doc current
- 10:42, 10 December 2015 diff hist 0 N File:147 bridge 2015.doc current
- 10:42, 10 December 2015 diff hist 0 N File:147 concrete pavement repair 2015.doc current
- 10:42, 10 December 2015 diff hist 0 N File:147 fence 2015.doc current
- 10:41, 10 December 2015 diff hist 0 N File:147 guard cable 2015.doc current
- 10:41, 10 December 2015 diff hist 0 N File:147 guardrail 2015.doc current
- 10:41, 10 December 2015 diff hist -30 m 147.3 Job Order Contracting (JOC) Per Est and Review, updated 6 Job Order Contracting JSPs for 2016 to fix unit costs and add stormwater compliance and new guardrail requirements.
- 11:40, 9 December 2015 diff hist +5 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, minor clarifications
- 08:36, 9 December 2015 diff hist 0 N File:101 Precon letter, state Dec 2015.docx
- 08:35, 9 December 2015 diff hist +4 m Category:101 Standard Forms →Construction and Materials: Per CM, updated the state pre-construction conference letter
- 15:39, 8 December 2015 diff hist -149 m Main Page
- 13:59, 8 December 2015 diff hist 0 N File:Main Page Dec 8, 2015.jpg current
- 13:58, 8 December 2015 diff hist +415 m Main Page EPG 104.7, EPG 128