User contributions for Smithk
Jump to navigation
Jump to search
30 December 2016
- 11:2611:26, 30 December 2016 diff hist +100 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: updated PODI links
- 11:1511:15, 30 December 2016 diff hist +28 m Category:101 Standard Forms →Contracts: updated district award link
- 10:5010:50, 30 December 2016 diff hist +3 m 643.2 Utilities in Program Delivery →643.2.13.4 Betterment: updated DE11 link
- 10:4910:49, 30 December 2016 diff hist +12 m Category:235 Preliminary Plans updated DE11 link
- 10:4610:46, 30 December 2016 diff hist +37 m Category:101 Standard Forms updated link
- 10:3810:38, 30 December 2016 diff hist +47 m Category:101 Standard Forms updated link
- 10:3710:37, 30 December 2016 diff hist +47 m 643.2 Utilities in Program Delivery updated link
- 10:3610:36, 30 December 2016 diff hist +106 m 103.1 Bid Opening and Award Process updated link
- 09:4109:41, 30 December 2016 diff hist +20 m Main Page No edit summary
- 09:2209:22, 30 December 2016 diff hist 0 N File:Main Page December 31, 2016.jpg No edit summary current
- 09:2109:21, 30 December 2016 diff hist +115 m Main Page No edit summary
29 December 2016
- 16:0616:06, 29 December 2016 diff hist 0 m Main Page No edit summary
27 December 2016
- 13:3213:32, 27 December 2016 diff hist 0 N File:616.8.31 MT 2016.pdf No edit summary current
- 13:3213:32, 27 December 2016 diff hist +5 m 616.16 Typical Applications (MUTCD Chapter 6P) Per TS, corrected MT TA-31. Changed the CENTER LANE CLOSED sign to a RIGHT LANE CLOSED sign.
- 13:2213:22, 27 December 2016 diff hist +112 m LPA:136.13 LPA Policy Changes Fig. 136.3.1
- 13:2113:21, 27 December 2016 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3.1
- 13:2013:20, 27 December 2016 diff hist 0 N File:136.3.1 2016.doc No edit summary current
- 13:2013:20, 27 December 2016 diff hist 0 m LPA:136.3 Federal Aid Basics Per LPA, updated Fig. 136.3.1 to include additional information
22 December 2016
- 14:2514:25, 22 December 2016 diff hist 0 m Main Page No edit summary
20 December 2016
- 16:0416:04, 20 December 2016 diff hist +1 m Main Page No edit summary
19 December 2016
- 15:4115:41, 19 December 2016 diff hist −7 m 751.36 Driven Piles →751.36.2 Steel Pile: Per BR, corrections previously inadvertently undone in Sept. Clarified the cast in place pipe pile wall thicknesses commonly available.
- 09:4909:49, 19 December 2016 diff hist +20 m 751.5 Structural Detailing Guidelines →751.5.1.3.1 Abbreviations: Per BR, added "opt." to the list of abbreviations
14 December 2016
- 15:5815:58, 14 December 2016 diff hist +23 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, clarified “minimum” to mean not using less than 45 even if the Ø angle allows using a lower value.
- 15:3415:34, 14 December 2016 diff hist 0 m Main Page No edit summary
13 December 2016
- 12:1412:14, 13 December 2016 diff hist −56 m Category:150 Quality Management Per CM, updated links
- 09:1409:14, 13 December 2016 diff hist −1 m Category:101 Standard Forms →Materials Related: Per CM, updated link
12 December 2016
- 16:2216:22, 12 December 2016 diff hist −2 m Main Page No edit summary
9 December 2016
- 14:0414:04, 9 December 2016 diff hist 0 N File:Main Page December 0, 2016.jpg No edit summary current
- 14:0414:04, 9 December 2016 diff hist −391 m Main Page new photo
- 13:4213:42, 9 December 2016 diff hist 0 m Main Page No edit summary
- 10:3910:39, 9 December 2016 diff hist +8 m Category:153 Agreements and Contracts →153.1.4 Step 3, Chief Counsel’s Office (CCO) Review
8 December 2016
- 16:2216:22, 8 December 2016 diff hist +54 m Category:100 GENERAL →100.2 Division of Construction and Materials
- 16:2016:20, 8 December 2016 diff hist −68 m Category:100 GENERAL →100.1 Construction Inspection Guidelines for MoDOT Organization and Committees
- 15:5915:59, 8 December 2016 diff hist 0 m Main Page No edit summary
7 December 2016
- 16:0716:07, 7 December 2016 diff hist +223 m 104.7 Scoping Estimates Per TP, updated Engineering Factors Report for FY 14-16
- 14:5414:54, 7 December 2016 diff hist −544 m Category:231 Typical Section Elements for Roadways updated D-sheet links current
- 14:4514:45, 7 December 2016 diff hist +57 m Category:747 Bridge Reports and Layouts updated D-sheet links
- 13:3613:36, 7 December 2016 diff hist +46 m 903.17 Delineation and Object Markers updated D sheet link
- 13:3613:36, 7 December 2016 diff hist +41 m 903.4 Guide Signs—Conventional Roads (MUTCD Chapter 2D) updated D sheet link
- 13:3413:34, 7 December 2016 diff hist +276 m 903.17 Overhead Sign Mounting updated D sheet links
- 13:3313:33, 7 December 2016 diff hist +138 m 903.3 Ground-Mounted Sign Supports updated D sheet links
- 13:3113:31, 7 December 2016 diff hist +549 m 903.2 Extent of Signing updated D sheet links
- 13:2713:27, 7 December 2016 diff hist +416 m 902.21 Designing a MoDOT Traffic Signal updated links to D-sheets
- 13:2313:23, 7 December 2016 diff hist −1,303 m Category:101 Standard Forms →Design: updated D sheet links
- 11:2711:27, 7 December 2016 diff hist +89 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Stormwater Coord, updated Storm Water Database Entry and Close Out Procedures Checklist
- 11:2311:23, 7 December 2016 diff hist +211 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per Stormwater Coord, replaced Land Disturb. Initial Setup and Inspections with Consent Decree Close Out, Erosion Reporting & Initial Setup
6 December 2016
- 15:5415:54, 6 December 2016 diff hist −111 m Main Page EPG 751.40.2.3
- 15:3215:32, 6 December 2016 diff hist +122 m 751.6 General Quantities Per BR, added general guidance to rehab existing bent cap using fiber reinforced polymer (FRP) reinforcement for shear strengthening.
- 13:5113:51, 6 December 2016 diff hist +5 m Category:101 Standard Forms Per Bidding and Contract, revised D-12 with minor update
- 13:5013:50, 6 December 2016 diff hist +5 m 643.2 Utilities in Program Delivery Per Bidding and Contract, revised D-12 with minor update