User contributions
Jump to navigation
Jump to search
- 08:45, 1 May 2017 diff hist -1 m Main Page
- 15:27, 28 April 2017 diff hist -1 m Help Article →Division Contacts
- 14:20, 28 April 2017 diff hist -90 m 236.15 Requests from Cities for Annexations
- 14:20, 28 April 2017 diff hist -2,004 m 236.15 Requests from Cities for Annexations Per CCO, updated link to Voluntary Annexation Petition
- 12:34, 28 April 2017 diff hist 0 m Main Page
- 14:30, 27 April 2017 diff hist +179 m 751.8 Concrete Box Culverts →751.8.1.5 Precast Culvert: Per BR, minor clarification for precast box culvert pay item and quantity tabulations
- 12:11, 27 April 2017 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:09, 27 April 2017 diff hist -59 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, removed archaic statement requiring MoDOT to approve subcontracts.
- 14:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 26 2017.doc current
- 14:50, 26 April 2017 diff hist +3 m Category:101 Standard Forms Per LPA, updated Fig. 134.2.2.5.1
- 14:49, 26 April 2017 diff hist +12 m Category:134 Engineering Professional Services Per LPA, updated Fig. 134.2.2.5.1
- 14:42, 26 April 2017 diff hist +37 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:34, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 14:33, 26 April 2017 diff hist +1 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant
- 10:50, 26 April 2017 diff hist +12 m Category:101 Standard Forms Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.5.1 April 2017.doc current
- 10:50, 26 April 2017 diff hist 0 N File:134.2.2.2 April 2017.docx current
- 10:49, 26 April 2017 diff hist +42 m Category:134 Engineering Professional Services Per LPA, further updated the same two forms: Fig. 134.2.2.2 and Fig. 134.2.2.5.1
- 10:34, 26 April 2017 diff hist 0 N File:134.2.2.5.1 2017.doc current
- 10:22, 26 April 2017 diff hist 0 N File:134.2.2.2 2017.docx current
- 10:21, 26 April 2017 diff hist -281 m Category:134 Engineering Professional Services Per LPA, updated two forms: Fig. 134.2.2.2 Solicitations and Request Letter, Fig. 134.2.2.5.1 Consultant Rating Form
- 10:16, 26 April 2017 diff hist -91 m Category:101 Standard Forms Per LPA, updated two forms
- 07:21, 26 April 2017 diff hist +1 m 751.35 Concrete Pile Cap Integral End Bents →751.35.5.1 Reinforcing Holes: minor correction, per BR
- 14:33, 25 April 2017 diff hist +127 m Main Page EPG 460.3.13
- 13:59, 25 April 2017 diff hist +1,403 m 460.3 Plant Inspection Per CM, new guidance for handling failing binder samples on projects and when additional testing which may take place. Also, recommendations for penalties for failing binders at the different levels.
- 14:25, 21 April 2017 diff hist -257 m Category:702 Load-Bearing Piles →702.1 Pile Types and Testing: Per BR, removed archaic info
- 10:43, 21 April 2017 diff hist -551 m Category:702 Load-Bearing Piles Per BR, minor editorial revisions.
- 07:10, 21 April 2017 diff hist -16 m Main Page
- 14:17, 20 April 2017 diff hist -4 m Main Page
- 13:56, 20 April 2017 diff hist +1 m Main Page
- 13:42, 20 April 2017 diff hist -3 m Category:101 Standard Forms →Construction and Contractor Related
- 13:31, 20 April 2017 diff hist 0 m Main Page
- 13:28, 20 April 2017 diff hist +89 m Main Page
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 19, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page 2 April 20, 2017.jpg current
- 13:23, 20 April 2017 diff hist 0 N File:Main Page April 20, 2017.jpg current
- 13:22, 20 April 2017 diff hist +1,454 m Main Page
- 11:15, 20 April 2017 diff hist +287 m 751.9 Bridge Seismic Design Per BR, added "Additional Info" box linking to the Bridge Seismic Design Process Flowchart
- 12:47, 19 April 2017 diff hist +58 m Main Page
- 15:02, 18 April 2017 diff hist 0 m Main Page
- 07:08, 18 April 2017 diff hist 0 N File:104.6 Bridge Scoping Checklist.docx current
- 07:08, 18 April 2017 diff hist -12 m 104.6 Project Scoping Checklists Per BR, updated Bridge Scoping Checklist
- 14:24, 17 April 2017 diff hist +157 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR and CM, added form, MoDOT Workforce Pre-Construction Diversity Plan Report.
- 09:10, 14 April 2017 diff hist +101 m 616.5 Flagger Control (MUTCD Chapter 6E) →616.5.4 Automated Flagger Assistance Devices (MUTCD 6E.04): added link
- 09:08, 14 April 2017 diff hist +101 m 616.19 Quality Standards for Temporary Traffic Control Devices added link
- 09:05, 14 April 2017 diff hist +422 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2.2 Flags and Advance Warning Rail System on Signs: inserted links
- 08:58, 14 April 2017 diff hist -6 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02)
- 08:49, 14 April 2017 diff hist +1 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 08:46, 14 April 2017 diff hist +52 m 616.7 Type of Temporary Traffic Control Zone Activities (MUTCD 6G) →616.7.2 Work Duration (MUTCD 6G.02): inserted link
- 10:59, 13 April 2017 diff hist 0 N File:903.7.49.1 2017.jpg current