User contributions for EPGsysop
Jump to navigation
Jump to search
4 April 2018
- 13:2813:28, 4 April 2018 diff hist −42 m 238.3 Route Surveying Per BR, updated Bridge Survey Report
- 13:2613:26, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report 2018.docx No edit summary current
- 13:2513:25, 4 April 2018 diff hist −78 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Report
- 11:5511:55, 4 April 2018 diff hist +7 m 127.29 Stormwater →127.29.7 Post-Construction Stormwater Management in New Development and Redevelopment
- 09:1709:17, 4 April 2018 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition No edit summary
- 07:4307:43, 4 April 2018 diff hist −93 m 751.50 Standard Detailing Notes Per BR, several minor clarifications
- 07:1507:15, 4 April 2018 diff hist 0 N File:751.50 E3.2 boring.jpg No edit summary current
3 April 2018
- 11:5311:53, 3 April 2018 diff hist −163 m Main Page EPG 237.13.5
- 11:4911:49, 3 April 2018 diff hist −62 m 237.13 Contract Plan File Name Convention →237.13.5 Example Set of Electronic Design Data: Per CADD, updated the chart with current examples
- 10:2310:23, 3 April 2018 diff hist −3 m Category:756 Seismic Design No edit summary
- 10:2110:21, 3 April 2018 diff hist −3 m Category:756 Seismic Design No edit summary
- 10:2010:20, 3 April 2018 diff hist +46 m Category:756 Seismic Design No edit summary
- 10:1810:18, 3 April 2018 diff hist +64 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, minor clarification
- 09:3609:36, 3 April 2018 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables) No edit summary
- 09:3609:36, 3 April 2018 diff hist +353 m 237.14 Electronic Design Data Delivery (BIM Deliverables) No edit summary
- 09:1809:18, 3 April 2018 diff hist +3 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 09:1409:14, 3 April 2018 diff hist +68 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 09:0009:00, 3 April 2018 diff hist +1 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
2 April 2018
- 11:0811:08, 2 April 2018 diff hist 0 N File:Main Page Apr 2, 2018.jpg No edit summary current
- 11:0811:08, 2 April 2018 diff hist −208 m Main Page EPG 236.5.16
- 09:4509:45, 2 April 2018 diff hist +672 m 236.5 Property Management →236.5.16 Legal Opinion of Title: Per RW, clarified the legal title of opinion for excess property appraised for $25,000 or less that include any references to RW in the acquisition deed.
- 08:4908:49, 2 April 2018 diff hist +292 m Main Page EPG 616.8, EPG 616.27
- 08:3308:33, 2 April 2018 diff hist +24 m 616.27 MoDOT Fleet Lighting No edit summary
- 08:2208:22, 2 April 2018 diff hist 0 N File:616.8.35d MT Apr 2018.pdf No edit summary current
- 08:2108:21, 2 April 2018 diff hist 0 N File:616.8.35c MT Apr 2018.pdf No edit summary current
- 08:2108:21, 2 April 2018 diff hist 0 N File:616.8.35b MT Apr 2018.pdf No edit summary current
- 08:2108:21, 2 April 2018 diff hist 0 N File:616.8.35a MT Apr 2018.pdf No edit summary current
- 08:2108:21, 2 April 2018 diff hist 0 N File:616.8.35 MT Apr 2018.pdf No edit summary current
- 08:2008:20, 2 April 2018 diff hist +20 m 616.8 Typical Applications (MUTCD 6H) Per TS, clarified light bar policy in TA-35 and TAs 35a-d by adding "SEE NOTE".
- 08:0708:07, 2 April 2018 diff hist +494 m 616.27 MoDOT Fleet Lighting TS, updated light bar guidance to bring in line with TAs
29 March 2018
- 12:3312:33, 29 March 2018 diff hist +531 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1
- 12:2912:29, 29 March 2018 diff hist +463 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1 Section 106 (Cultural Resource) Compliance: Per Env'l, clarified procedures in Section 106 (Cultural Resource) Compliance
- 11:3911:39, 29 March 2018 diff hist +316 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 11:3711:37, 29 March 2018 diff hist −124 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per CM, removed one archaic sentence of guidance about Form C-220
28 March 2018
- 11:2011:20, 28 March 2018 diff hist +38 m Main Page EPG 134
- 10:3210:32, 28 March 2018 diff hist +617 m Category:134 Engineering Professional Services Per DE and ECR, DBE Concurrence may now be obtained electronically in eAgreements. Consultant Contract guidance was updated.
- 08:2008:20, 28 March 2018 diff hist −51 m Main Page No edit summary
27 March 2018
- 14:1914:19, 27 March 2018 diff hist 0 N File:Main Page Mar 27, 2018.jpg No edit summary current
- 14:1914:19, 27 March 2018 diff hist +93 m Main Page No edit summary
- 12:2812:28, 27 March 2018 diff hist −248 m Main Page EPG 751.2.2
- 12:2512:25, 27 March 2018 diff hist +42 m 751.2 Loads No edit summary
- 11:5211:52, 27 March 2018 diff hist +12 m Main Page No edit summary
- 11:5111:51, 27 March 2018 diff hist +11 m Main Page EPG 402 and EPG 409
- 11:1811:18, 27 March 2018 diff hist 0 N File:127.25.2.1 Hazardous 2018.docx No edit summary current
- 11:1811:18, 27 March 2018 diff hist +5 m 127.25 Maintenance Environmental Policies Per MT, updated ''Hazardous Materials Response Plan'' document
- 10:3710:37, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines a.docx No edit summary current
- 10:3710:37, 27 March 2018 diff hist +2 m Category:402 Bituminous Surface Leveling No edit summary
- 10:3610:36, 27 March 2018 diff hist 0 N File:409 FY2019 Contract Seal Coat Guidelines a.docx No edit summary current
- 10:3610:36, 27 March 2018 diff hist +2 m Category:409 Seal Coat No edit summary
- 10:2810:28, 27 March 2018 diff hist 0 N File:409 FY2019 Contract Seal Coat Guidelines.docx No edit summary current