User contributions
Jump to navigation
Jump to search
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Non-integral 1 2018.jpg current
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Integral 1 2018.jpg current
- 15:18, 25 April 2018 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: Per BR, corrected dimensions for K5-K8 bars placed in end bent wings and extending into bridge barrier.
- 14:30, 25 April 2018 diff hist -688 m Main Page EPG 751.50
- 14:27, 25 April 2018 diff hist +410 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, new std detailing note about deviations in galvanized pile penetration
- 08:40, 25 April 2018 diff hist -263 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.9 Lane Reduction Transition Markings (MUTCD Section 3B.09): Per TS, deleted Fig. 620.2.9.3 since Fig. 620.2.9.1 already covers Fig. 620.2.9.3's critical concepts.
- 08:27, 24 April 2018 diff hist +9 m Category:403 Asphaltic Concrete Pavement →403.1.18 Quality Assurance (Sec 403.18)
- 15:20, 23 April 2018 diff hist +1 m Main Page
- 09:12, 23 April 2018 diff hist +9 Category:1091 Lighting Equipment
- 09:11, 23 April 2018 diff hist -9 Category:1091 Lighting Equipment
- 09:09, 23 April 2018 diff hist 0 Category:1091 Lighting Equipment
- 11:08, 20 April 2018 diff hist +38 m Category:130 Value Engineering →130.2 Value Engineering Change Proposals: Per EPS, updated link
- 14:52, 16 April 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 12:51, 16 April 2018 diff hist -936 m Main Page EPG 903.4.6
- 12:48, 16 April 2018 diff hist +70 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 12:24, 16 April 2018 diff hist +257 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses: Per BR and TS, corrected verbiage that has caused complexities. MoDOT may be the designer and if not, others will submit signed & sealed dwgs.
- 10:24, 16 April 2018 diff hist +412 m Category:235 Preliminary Plans →235.8.2 FAA’s Notice Criteria Tool: Per Bidding and Contract, additional guidance for core teams on appropriately considering the max equipment height for construction projects involving airports
- 13:59, 13 April 2018 diff hist -10 m Main Page EPG 751.50
- 12:34, 13 April 2018 diff hist +2,646 751.50 Standard Detailing Notes Per BR, new clarifying note D1.5; archaic option in D1.21 replaced with current option; new H9.29 for 2 thrie beam std dwgs
- 07:45, 13 April 2018 diff hist 0 m 949.2 Speed Limit Guidelines →949.2.3 Additional Guidelines for Establishing Speed Limits: Per TS, minor clarification
- 12:56, 11 April 2018 diff hist -566 m Main Page EPG 751.8
- 12:51, 11 April 2018 diff hist 0 N File:751.8.3.4.jpg current
- 12:50, 11 April 2018 diff hist +1,473 m 751.8 Concrete Box Culverts Per BR, added guidance for culvert wing walls on rock.
- 08:01, 11 April 2018 diff hist +60 m 127.25 Maintenance Environmental Policies
- 07:57, 11 April 2018 diff hist -192 m 127.25 Maintenance Environmental Policies Per Env'l, updated several links
- 12:53, 10 April 2018 diff hist +10 m Main Page EPG 110.1
- 11:28, 10 April 2018 diff hist +715 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.10.1
- 11:17, 10 April 2018 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:16, 10 April 2018 diff hist -5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:15, 10 April 2018 diff hist +269 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects
- 11:11, 10 April 2018 diff hist +437 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects.
- 09:30, 10 April 2018 diff hist -2 m 751.6 General Quantities →751.6.1 Index of Quantities
- 09:06, 10 April 2018 diff hist +189 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added Open Cell Foam Joint System pay items
- 13:05, 9 April 2018 diff hist -193 m Main Page EPG 127.29.7
- 13:01, 9 April 2018 diff hist +695 127.29 Stormwater →127.29.7 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment: Per Env'l, added guidance per permit agreement with MDNR.
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6c, 2018.jpg current
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6b, 2018.gif current
- 14:36, 6 April 2018 diff hist 0 Main Page
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6a, 2018.jpg current
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6, 2018.jpg current
- 14:34, 6 April 2018 diff hist +739 m Main Page
- 12:28, 6 April 2018 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, updated Request for Final Soundings for Structures Form
- 12:27, 6 April 2018 diff hist +8 m 320.3 Drilling Operations Per BR, updated Request for Final Soundings for Structures Form
- 12:25, 6 April 2018 diff hist 0 N File:751.1.2.19 Guidance 2018.xlsx
- 12:24, 6 April 2018 diff hist -2 m 751.1 Preliminary Design Per BR, updated Request for Final Soundings for Structures Form and Guidance for Request for Final Soundings of Structures
- 12:21, 6 April 2018 diff hist 0 N File:751.1.2.20 Request Apr 2018.xlsx current
- 12:20, 6 April 2018 diff hist +4 m Category:101 Standard Forms Per BR, updated Request for Final Soundings for Structures Form
- 13:29, 5 April 2018 diff hist -93 m Main Page EPG 110.2
- 13:26, 5 April 2018 diff hist +1 Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, revised the bulletin board inspection rate from every two months to every three months.
- 09:37, 5 April 2018 diff hist +101 m Main Page EPG 749.5