User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:57, 29 May 2019 diff hist -299 m 236.3 Administration updated link
- 10:55, 29 May 2019 diff hist +8 m 236.2 Right of Way Organization and Personnel →236.2.4 Job Specifications: updated link
- 10:53, 29 May 2019 diff hist +14 m 236.2 Right of Way Organization and Personnel →236.2.2 Organization of the Right of Way Section: updated link
- 10:52, 29 May 2019 diff hist -6 m 236.2 Right of Way Organization and Personnel →236.2.1 Principle of Organization: updated link
- 10:49, 29 May 2019 diff hist +142 m 236.1 General Information →236.1.1.14 Personal Conduct: updated link
- 10:48, 29 May 2019 diff hist +154 m 236.1 General Information →236.1.1.13 Political Activities: updated link
- 10:40, 29 May 2019 diff hist -148 m Category:236 Right of Way updated links
- 10:32, 29 May 2019 diff hist -10 m Category:236 Right of Way
- 10:23, 29 May 2019 diff hist +50 m 236.14 Change in Route Status Report →236.14.5 Implementation of Approved Changes in Route Status: Updated Commission's Execution of Documents Policy link
- 13:50, 28 May 2019 diff hist +78 m Main Page
- 12:27, 28 May 2019 diff hist +151 m Main Page EPG 130, EPG 616.6.87, EPG 616.8
- 11:18, 28 May 2019 diff hist 0 N File:616.8.39 Sheet 1 DECM 2019.pdf current
- 11:18, 28 May 2019 diff hist 0 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials
- 11:12, 28 May 2019 diff hist 0 File:616.8.39 Sheet 2 DECM 2016.pdf Smithk uploaded a new version of File:616.8.39 Sheet 2 DECM 2016.pdf current
- 11:12, 28 May 2019 diff hist 0 File:616.8.39 Sheet 1 DECM 2016.pdf Smithk uploaded a new version of File:616.8.39 Sheet 1 DECM 2016.pdf current
- 10:57, 28 May 2019 diff hist 0 N File:Fig 616.6.87.2.2.pdf current
- 10:57, 28 May 2019 diff hist 0 N File:Fig 616.6.87.2.1.pdf current
- 10:56, 28 May 2019 diff hist +36 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway: Per TS, the spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness in Fig. 616.6.87.1 and Fig. 616.6.87.2.
- 10:51, 28 May 2019 diff hist 0 N File:Fig 616.6.87.1.2.pdf current
- 10:51, 28 May 2019 diff hist 0 N File:Fig 616.6.87.1.1.pdf current
- 10:50, 28 May 2019 diff hist +41 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations
- 10:38, 28 May 2019 diff hist 0 N File:Fig 616.6.87.1 2019.pdf current
- 10:37, 28 May 2019 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations: Per TS, the spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness in Fig. 616.6.87.1 and Fig. 616.6.87.2.
- 10:34, 28 May 2019 diff hist 0 File:Fig 616.6.87.1 2017.pdf Smithk uploaded a new version of File:Fig 616.6.87.1 2017.pdf current
- 10:11, 28 May 2019 diff hist 0 m 130.7 Value Engineering Team Leader Guide Smithk moved page 130.4 Value Engineering Team Leader Guide to 130.7 Value Engineering Team Leader Guide: re-numbered article current
- 10:11, 28 May 2019 diff hist +55 N 130.4 Value Engineering Team Leader Guide Smithk moved page 130.4 Value Engineering Team Leader Guide to 130.7 Value Engineering Team Leader Guide: re-numbered article current
- 10:10, 28 May 2019 diff hist +45 N 130.3 Project Manager’s Guide Smithk moved page 130.3 Project Manager’s Guide to 130.6 Project Manager’s Guide: re-numbered article current
- 10:10, 28 May 2019 diff hist 0 m 130.6 Project Manager’s Guide Smithk moved page 130.3 Project Manager’s Guide to 130.6 Project Manager’s Guide: re-numbered article current
- 10:10, 28 May 2019 diff hist 0 m Category:130 Value Engineering →130.3.2 PAVE Study Process
- 10:08, 28 May 2019 diff hist +563 Category:130 Value Engineering Per EPS, new guidance for Post-Award Value Engineering (PAVE) workshops, processes and project selections and reorganization of guidance.
- 15:14, 21 May 2019 diff hist +1 m 237.6 Project Estimates
- 13:55, 21 May 2019 diff hist +24 m Category:702 Load-Bearing Piles minor clarification
- 13:53, 21 May 2019 diff hist +297 m 751.36 Driven Piles minor clarifications
- 13:26, 21 May 2019 diff hist +1 m 751.36 Driven Piles →751.36.1.2 Probe Pile
- 12:36, 21 May 2019 diff hist -79 m Main Page EPG 237.6
- 12:25, 21 May 2019 diff hist 0 N File:Fig 237.6.docx current
- 12:25, 21 May 2019 diff hist -13 m 237.6 Project Estimates Per Bidding, updated "Costs for Non-Contractual Items" and added an invisible (white font) link for "noncontractual" so misspellers can locate non-contractual info.
- 09:44, 21 May 2019 diff hist +1 m Main Page
- 09:23, 21 May 2019 diff hist -31 m MediaWiki:Sidebar
- 09:22, 21 May 2019 diff hist +22 m MediaWiki:Sidebar
- 09:21, 21 May 2019 diff hist +12 m MediaWiki:Sidebar
- 09:18, 21 May 2019 diff hist +5 m Main Page
- 09:12, 21 May 2019 diff hist +275 m Main Page Per EPS, updated "welcome" and added mission banner
- 09:25, 20 May 2019 diff hist +5 m LPA:136.13 LPA Policy Changes
- 09:24, 20 May 2019 diff hist +752 m LPA:136.13 LPA Policy Changes EPG 136.6.4.5
- 09:22, 20 May 2019 diff hist +186 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per Env'l, updated Fig. 136.6.18 Threatened and Endangered Species Federal Aid Transportation Submittal Checklist, and added Fig. 136.19 August 2018 MoDOT USFWS Threatened and Endangered Species Habitats
- 08:58, 20 May 2019 diff hist +85 m 751.36 Driven Piles →751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8
- 08:54, 20 May 2019 diff hist +74 m 751.36 Driven Piles →751.36.5.2 Structural Resistance Factor (ϕc and ϕf) for Strength Limit State, LRFD 6.5.4.2
- 08:51, 20 May 2019 diff hist +76 m 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor (ϕstat) and Driving Resistance Factor (ϕdyn), LRFD Table 10.5.5.2.3-1
- 08:46, 20 May 2019 diff hist -16 m 751.36 Driven Piles →751.36.5.3 Geotechnical Resistance Factor ( \phi_{stat}) and Driving Resistance Factor ( \phi_{dyn}), LRFD Table 10.5.5.2.3-1