User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 16:05, 14 November 2019 diff hist 0 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings
- 16:04, 14 November 2019 diff hist 0 N File:751.11.2.1 taper.jpg current
- 16:03, 14 November 2019 diff hist -59 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, revised illustrations to clarify the maximum allowed taper
- 14:09, 14 November 2019 diff hist -48 m Main Page New AWP MA Sample Record Acceptance By Certification QRG
- 11:55, 14 November 2019 diff hist +142 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP MA Sampling and Testing Status Report, link
- 16:27, 12 November 2019 diff hist 0 File:751.5 back ns.gif Smithk uploaded a new version of File:751.5 back ns.gif current
- 16:23, 12 November 2019 diff hist 0 File:751.5 back fs.gif Smithk uploaded a new version of File:751.5 back fs.gif current
- 16:20, 12 November 2019 diff hist 0 File:751.5 arrow-side continuous fillet welding.gif Smithk uploaded a new version of File:751.5 arrow-side continuous fillet welding.gif current
- 16:14, 12 November 2019 diff hist 0 File:751.5 90 degree stirrup hook.gif Smithk uploaded a new version of File:751.5 90 degree stirrup hook.gif current
- 16:09, 12 November 2019 diff hist 0 File:751.5 30 45 60 degree bend detail.gif Smithk uploaded a new version of File:751.5 30 45 60 degree bend detail.gif current
- 16:00, 12 November 2019 diff hist 0 File:751.5 135 degree stirrup hook.gif Smithk uploaded a new version of File:751.5 135 degree stirrup hook.gif current
- 15:46, 12 November 2019 diff hist 0 File:751.5 120 135 150 degree bend detail.gif Smithk uploaded a new version of File:751.5 120 135 150 degree bend detail.gif current
- 15:39, 12 November 2019 diff hist 0 File:751.40 Temporary Traffic Control Device Section Thru Roadway.gif Smithk uploaded a new version of File:751.40 Temporary Traffic Control Device Section Thru Roadway.gif current
- 15:28, 12 November 2019 diff hist 0 File:751.40 Substructure Repair.gif Smithk uploaded a new version of File:751.40 Substructure Repair.gif current
- 15:20, 12 November 2019 diff hist 0 File:751.40 Slab Drain Details (Details for Raising Scuppers) Plan of Grate Support and Scupper Extens.gif Smithk uploaded a new version of File:751.40 Slab Drain Details (Details for Raising Scuppers) Plan of Grate Support and Scupper Extens.gif current
- 13:59, 12 November 2019 diff hist 0 m LPA:136.3 Federal Aid Basics →136.3.8.10.3 Project Programming: updated link
- 13:20, 8 November 2019 diff hist +5 m Category:101 Standard Forms Per Env'l, updated Form 806.8.2, Project-Specific SWPPP Information
- 13:19, 8 November 2019 diff hist 0 N File:Form 806.8.2 2019.pdf current
- 13:18, 8 November 2019 diff hist +5 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated Form 806.8.2, Project-Specific SWPPP Information
- 12:26, 8 November 2019 diff hist +37 m Category:101 Standard Forms →Construction and Contractor Related
- 13:29, 6 November 2019 diff hist +9 m Main Page EPG 105.9
- 13:27, 6 November 2019 diff hist +494 m Category:105 Control of Work →105.9.3 Daily Work Reports: Per CM, added guidance for when DWRs in AASHTOWARE may be suspended.
- 11:58, 6 November 2019 diff hist +75 m 751.6 General Quantities →751.6.1 Index of Quantities
- 11:29, 6 November 2019 diff hist +220 m 751.6 General Quantities Per BR, added references to the "Emulsified Asphalt, Seal Coat" pay item and unit weight
- 15:39, 5 November 2019 diff hist +54 m Category:236 Right of Way Per RW, insisted on adding a link of the "Value Determination Schedule" (which is a chart of fees) to the listing of major types of access.
- 12:26, 5 November 2019 diff hist 0 m 237.9 Submission of Plans and Supporting Documents
- 10:01, 5 November 2019 diff hist 0 File:237.9.3 due dates.pdf Smithk uploaded a new version of File:237.9.3 due dates.pdf current
- 11:42, 4 November 2019 diff hist +13 m Help Article →Division Contacts
- 10:22, 1 November 2019 diff hist -13 m 103.1 Bid Opening and Award Process →103.1.6.1.3 Assembling Job Special Provisions
- 10:14, 1 November 2019 diff hist +14 m 103.1 Bid Opening and Award Process
- 10:07, 1 November 2019 diff hist -8 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines
- 09:29, 1 November 2019 diff hist 0 m Help Article →Division Contacts
- 09:27, 1 November 2019 diff hist +47 m Help Article
- 09:24, 1 November 2019 diff hist +63 m Help Article
- 14:42, 31 October 2019 diff hist +57 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified the maximum allowed taper
- 07:45, 31 October 2019 diff hist +16 m Category:153 Agreements and Contracts
- 07:44, 31 October 2019 diff hist +8 m 236.14 Change in Route Status Report
- 07:43, 31 October 2019 diff hist +16 m 236.4 Description Writing and Titles
- 07:42, 31 October 2019 diff hist +4 m 236.4 Description Writing and Titles
- 07:41, 31 October 2019 diff hist -20 m 236.4 Description Writing and Titles updated link
- 07:39, 31 October 2019 diff hist -8 m 236.14 Change in Route Status Report updated link
- 07:38, 31 October 2019 diff hist +84 m Category:153 Agreements and Contracts Updated link
- 13:35, 29 October 2019 diff hist +1 m LPA:136.3 Federal Aid Basics →136.3.8.10.2 Project Eligibility and Selection
- 13:27, 29 October 2019 diff hist -104 m Category:153 Agreements and Contracts
- 13:22, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1 The Agreement Process
- 13:20, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 12:45, 29 October 2019 diff hist 0 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 08:50, 29 October 2019 diff hist +2 m 606.2 Guard Cable
- 08:47, 29 October 2019 diff hist +1 m 606.2 Guard Cable
- 15:11, 28 October 2019 diff hist +182 Main Page EPG 236