User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:01, 1 July 2020 diff hist +34 m 153.13 Highway Safety
- 09:00, 1 July 2020 diff hist +34 m 153.14 Human Resources
- 08:59, 1 July 2020 diff hist -1,090 m 153.14 Human Resources Per Secr. Comm, deleted three agreements that are no longer templates in eAgreements.
- 08:52, 1 July 2020 diff hist +47 m Recent Policy Changes in the EPG EPG 153.13
- 08:50, 1 July 2020 diff hist +840 m 153.14 Human Resources Per Secr. Comm, updated signature requirements for two contracts
- 08:32, 1 July 2020 diff hist -40 m Recent Policy Changes in the EPG EPG 153.12
- 08:30, 1 July 2020 diff hist +1,772 m 153.13 Highway Safety Per Secr. Comm, updated drafting, review and signature requirements for all the contracts
- 08:26, 1 July 2020 diff hist +84 m Help Article →EPG Ballot Cycles: Per EPS, updated EPG Ballot Cycles dates for 2021
- 08:53, 30 June 2020 diff hist 0 File:236.18.1.6 Flow Chart.pdf Smithk reverted File:236.18.1.6 Flow Chart.pdf to an old version current
- 08:49, 26 June 2020 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per BR, updated BEAP Project Tracking Form
- 08:37, 26 June 2020 diff hist 0 N File:Fig.136.3.20 June 2020.docx
- 08:36, 26 June 2020 diff hist +10 m LPA:136.3 Federal Aid Basics Per BR, updated contact info on Fig. 136.3.20, BEAP Project Tracking Form
- 08:11, 26 June 2020 diff hist 0 File:620.10 MoDOT T80.pdf Smithk reverted File:620.10 MoDOT T80.pdf to an old version current
- 14:29, 25 June 2020 diff hist -455 m Category:101 Standard Forms →Construction and Materials: Per CM, updated access to C-239
- 11:04, 25 June 2020 diff hist -535 m Recent Policy Changes in the EPG EPG 134.3.2
- 10:59, 25 June 2020 diff hist +224 m Category:134 Engineering Professional Services →134.3.2 Fixed Fee Review: Per LPA, clarified fixed fee guidance and matched the on-call master agreements.
- 09:02, 25 June 2020 diff hist +648 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) Per TS, numerous minor clarifications
- 08:11, 25 June 2020 diff hist +429 m 616.23 Traffic Control for Field Operations Per TS, numerous minor clarifications
- 14:58, 24 June 2020 diff hist -269 m 616.19 Quality Standards for Temporary Traffic Control Devices Per TS, numerous minor clarifications
- 08:44, 24 June 2020 diff hist -228 m Recent Policy Changes in the EPG EPG 134.5.1
- 08:41, 24 June 2020 diff hist +139 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per BR, additional contact guidance
- 12:13, 23 June 2020 diff hist +1 m 127.25 Maintenance Environmental Policies Per Env'l, updated link
- 11:19, 23 June 2020 diff hist +15 m Category:101 Standard Forms →Construction and Materials: updated link
- 11:18, 23 June 2020 diff hist +15 m Category:703 Concrete Masonry Construction →703.2.12 Checklist: updated link
- 11:14, 23 June 2020 diff hist -477 m Recent Policy Changes in the EPG EPG 153.18
- 11:00, 23 June 2020 diff hist +503 m 153.19 Multimodal Per Multimodal, new MO-21 agreement, Coronavirus Aid Relief and Economic Security Act Agreement
- 10:05, 23 June 2020 diff hist +288 m LPA:136.13 LPA Policy Changes EPG 136.4.2.6
- 09:59, 23 June 2020 diff hist +236 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.6 Step 5 - Selection of Consultant: Per LPA, added guidance about on an LPA disqualifying a consultant.
- 09:25, 23 June 2020 diff hist +22 m Recent Policy Changes in the EPG EPG 703.2.12,EPG 101
- 09:11, 23 June 2020 diff hist 0 N File:703.2.12 PODI Bridge Deck Pour Checklist.pdf current
- 09:10, 23 June 2020 diff hist +90 m Category:101 Standard Forms →Construction and Materials: Per CM, new PODI Bridge Deck Pour Checklist
- 09:08, 23 June 2020 diff hist -4,175 m Category:703 Concrete Masonry Construction →703.2.12 Checklist: Per CM, the new, FHWA-based "PODI Bridfe Deck Pour Checklist" form replaced the former textual guidance.
- 13:41, 19 June 2020 diff hist +1 m LPA:136.13 LPA Policy Changes
- 13:40, 19 June 2020 diff hist +199 m LPA:136.13 LPA Policy Changes EPG 136.6.3
- 13:37, 19 June 2020 diff hist 0 N File:136.6.3 programmatic agreement.pdf current
- 13:36, 19 June 2020 diff hist +56 m LPA:136.6 Environmental and Cultural Requirements →136.6.3 Categorical Exclusion (CE): Per Env'l, updated guidance with FHWA agreement requirements
- 10:13, 19 June 2020 diff hist -60 m Recent Policy Changes in the EPG EPG 105.9.14
- 09:20, 19 June 2020 diff hist -1,038 m Category:105 Control of Work →105.9.14 Project Diaries: Per CM, updated guidance to current AASHTOWARE procedures. EPG had provided project diary guidance for the outdated SiteManger procedures.
- 08:11, 19 June 2020 diff hist 0 N File:139 FHWA Design Build Program Agreement 2020.pdf current
- 08:10, 19 June 2020 diff hist +82 m Category:139 Design - Build Per DE, provided latest version of FHWA Design Build Program Agreement and updated links to Mo Design-Build Statue 227.107
- 13:36, 18 June 2020 diff hist +276 m Recent Policy Changes in the EPG EPG 237.9
- 12:41, 18 June 2020 diff hist +9 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6 Finalizing the PS&E for Advertisement
- 12:35, 18 June 2020 diff hist +15 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6.1 Creating Bidding Documents
- 12:34, 18 June 2020 diff hist -844 m 237.9 Submission of Plans and Supporting Documents →237.9.3.7 Posting Projects for Advertisement
- 12:34, 18 June 2020 diff hist +1,199 m 237.9 Submission of Plans and Supporting Documents →237.9.3.6 Finalizing the PS&E for Advertisement: Per DE, updated guidance since proposals are not advertised anymore. The proposal is now split into a Bid Book, Roadway JSPs, and Bridge JSPs and each is advertised.
- 07:34, 18 June 2020 diff hist +16 m Category:130 Value Engineering Per CM, updated C-104 links
- 07:32, 18 June 2020 diff hist +125 m 104.13 Construction Inspection Guidance for Sec 104 Per CM, updated C-104 links
- 15:12, 17 June 2020 diff hist +184 m Recent Policy Changes in the EPG EPG 146.3.1
- 15:00, 17 June 2020 diff hist +321 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.1 DBE Subcontract – Performing Work Onsite: Per ECR, updates/clarification. When a DBE is a prime contractor, a CUF should be performed on the DBE firm as well as any other DBE firms being utilized. The CUF review should be conducted on the prime DBE every 60 days until the project is completed.
- 13:43, 17 June 2020 diff hist +1 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1.1 Step 1, Determine Need for Cultural Resource Investigations