User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:29, 5 August 2020 diff hist -1,183 m 751.13 Expansion Joint Systems →751.13.6.5 Barrier Details: Per BR, numerous minor clarifications related to barrier pay items
- 11:25, 5 August 2020 diff hist -1,223 m 751.13 Expansion Joint Systems Per BR, numerous minor clarifications related to barrier pay items
- 10:58, 5 August 2020 diff hist +328 m 751.12 Barriers, Railings, Curbs and Fences Per BR, minor clarification related to barrier pay items
- 10:57, 5 August 2020 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences Smithk moved page 751.12 Barriers, Curbs and Fences to 751.12 Barriers, Railings, Curbs and Fences: Per BR, title revision related to barrier pay item changes
- 10:57, 5 August 2020 diff hist +57 N 751.12 Barriers, Curbs and Fences Smithk moved page 751.12 Barriers, Curbs and Fences to 751.12 Barriers, Railings, Curbs and Fences: Per BR, title revision related to barrier pay item changes current Tag: New redirect
- 10:56, 5 August 2020 diff hist -2 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per BR, minor clarification related to barrier pay items
- 10:48, 5 August 2020 diff hist -520 m 751.5 Structural Detailing Guidelines Per BR, numerous minor clarifications related to barrier pay items
- 09:12, 5 August 2020 diff hist -20 m 751.4 Reinforced Concrete Design Properties →751.4.1 Reinforced Concrete: Per BR, minor clarifications related to barrier pay items current
- 08:59, 5 August 2020 diff hist 0 N File:751.2.2.1 Live Load 2020.jpg current
- 08:57, 5 August 2020 diff hist -1 m 751.2 Loads →751.2.2.1 Live Load
- 08:54, 5 August 2020 diff hist +44 m 751.2 Loads Per BR, numerous minor clarifications related to barrier pay items
- 08:36, 5 August 2020 diff hist +1 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations)
- 08:35, 5 August 2020 diff hist 0 m 751.1 Preliminary Design →Guidelines for Curb Blockout
- 08:34, 5 August 2020 diff hist 0 N File:751.1.3.4.jpg current
- 08:32, 5 August 2020 diff hist 0 N File:751.1.3.4 steel 2 section.jpg current
- 08:32, 5 August 2020 diff hist 0 N File:751.1.3.4 type h section.jpg current
- 08:31, 5 August 2020 diff hist 0 N File:751.1.3.4 type d section.jpg current
- 08:31, 5 August 2020 diff hist 0 N File:751.1.3.4 type b section.jpg current
- 08:30, 5 August 2020 diff hist 0 N File:751.1.3.4 thrie beam section.jpg current
- 08:30, 5 August 2020 diff hist 0 N File:751.1.3.4 brush section.jpg current
- 08:30, 5 August 2020 diff hist 0 N File:751.1.3.4 more than 6 section.jpg current
- 08:29, 5 August 2020 diff hist 0 m 751.1 Preliminary Design →Common Bridge Barrier and Railing (for Rehabilitations)
- 08:29, 5 August 2020 diff hist 0 N File:751.1.3.4 less than 6 section.jpg current
- 08:28, 5 August 2020 diff hist 0 N File:751.1.3.4 type d.jpg current
- 08:28, 5 August 2020 diff hist 0 N File:751.1.3.4 thrie beam.jpg current
- 08:23, 5 August 2020 diff hist +1,096 m 751.1 Preliminary Design Per BR, numerous minor clarifications related to barrier pay items
- 07:19, 5 August 2020 diff hist +22 m 751.12 Barriers, Railings, Curbs and Fences updated link
- 13:41, 4 August 2020 diff hist +109 m Recent Policy Changes in the EPG EPG 236.14.8
- 13:40, 4 August 2020 diff hist +328 m 236.14 Change in Route Status Report →236.14.8 Change in Route Marking: Per TS, archaic guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.
- 12:51, 4 August 2020 diff hist -117 m 902.15 Designing a Traffic Signal Updated links to standard plans
- 12:25, 4 August 2020 diff hist -373 m Recent Policy Changes in the EPG EPG 153.18
- 12:19, 4 August 2020 diff hist +11,334 m 153.19 Multimodal Per Secr. Comm, updated signature requirements for contracts
- 11:27, 4 August 2020 diff hist +1 m Help Article →Division Contacts
- 10:57, 4 August 2020 diff hist 0 N File:751.40.8.5.1.1 slab cantilever.jpg current
- 10:47, 4 August 2020 diff hist -17 m 751.40 LFD Widening and Repair →751.40.8.5.1.1 Design Criteria
- 07:48, 4 August 2020 diff hist 0 N File:751.40.5.2 section.jpg current
- 07:47, 4 August 2020 diff hist 0 N File:751.40.5.2 typical.jpg current
- 07:46, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents proposed slab.jpg current
- 07:39, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents existing slab.jpg current
- 07:39, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents proposed.jpg current
- 07:39, 4 August 2020 diff hist 0 N File:751.40.4.1 integral end bents existing.jpg current
- 07:38, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents proposed slab.jpg current
- 07:38, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents existing slab.jpg current
- 07:29, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents proposed.jpg current
- 07:28, 4 August 2020 diff hist 0 N File:751.40.4.1 non integral end bents existing.jpg current
- 15:25, 31 July 2020 diff hist 0 N File:751.40.3.1 concrete edge repair.jpg current
- 15:13, 31 July 2020 diff hist -440 m 751.40 LFD Widening and Repair Per BR, uploaded updated figures
- 14:00, 31 July 2020 diff hist +22 m 643.2 Local Utility Adjustments - Public and Private →643.2.4 Request for Utility Adjustment Plan: Per DE, clarified guidance
- 10:00, 31 July 2020 diff hist -238 m Recent Policy Changes in the EPG EPG 153.16
- 09:40, 31 July 2020 diff hist +850 m 153.17 Medical Board Employee Benefits Per Secr. Comm, updated signature requirements for 3 contracts