User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:01, 23 September 2020 diff hist +30 m Recent Policy Changes in the EPG EPG 751.50
- 11:54, 23 September 2020 diff hist +396 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings): Per BR, added note H7.8.2 to require epoxy-mastic primer coating on galvanized drain support brackets which come in contact with weathering steel beams/girders.
- 09:30, 23 September 2020 diff hist +41 m 903.5 Regulatory Signs
- 09:26, 23 September 2020 diff hist 0 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)
- 09:23, 23 September 2020 diff hist 0 m 903.5 Regulatory Signs →903.5.14 Optional Lane Control Sign (R3-6) (MUTCD Section 2B.21)
- 09:23, 23 September 2020 diff hist +1 m 903.5 Regulatory Signs →903.5.13 Mandatory Movement Lane Control Signs (R3-5, R3-5a and R3-7)(MUTCD Section 2B.20)
- 09:20, 23 September 2020 diff hist +9 m 903.5 Regulatory Signs →903.5.5.2 YIELD Sign Placement (MUTCD Section 2B.10)
- 09:19, 23 September 2020 diff hist -2 m 903.5 Regulatory Signs →903.5.1 Application (MUTCD Section 2B.01)
- 09:15, 23 September 2020 diff hist -995 m 903.5 Regulatory Signs Per TS, numerous minor updates and clarifications
- 14:28, 22 September 2020 diff hist -4 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3)
- 14:27, 22 September 2020 diff hist -5 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): updated link
- 09:17, 22 September 2020 diff hist -281 m 751.10 General Superstructure →751.10.1.13 Drip Groove: Per BR, further minor clarifications related to barrier pay items
- 07:36, 22 September 2020 diff hist -114 m Recent Policy Changes in the EPG EPG 237.5
- 07:34, 22 September 2020 diff hist -296 m 237.5 Special Provisions Per DE, clarified and updated guidance to current practice
- 12:13, 21 September 2020 diff hist -61,642 m Category:944 Radio Operation Per SM, info greatly truncated and moved to EPG 948 current Tag: Replaced
- 11:48, 21 September 2020 diff hist +2,314 m Category:948 Incident Response Plan and Emergency Response Management Per SM, deleted archaic E 944 Radio Operation and merged its info into EPG 948. Other minor updates to E 948
- 07:41, 21 September 2020 diff hist +22 m Category:139 Design - Build →139.10.6 Acceptance of SOQs and Proposals: Updated links
- 07:37, 21 September 2020 diff hist -9 m Category:139 Design - Build
- 07:31, 21 September 2020 diff hist +12 m Category:139 Design - Build →139.8.2 Request for Proposals: minor corrections
- 12:14, 17 September 2020 diff hist -348 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)
- 12:13, 17 September 2020 diff hist 0 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)
- 12:12, 17 September 2020 diff hist 0 N File:903.18.4.jpg current
- 12:12, 17 September 2020 diff hist 0 N File:903.18.2.jpg current
- 12:11, 17 September 2020 diff hist 0 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)
- 12:03, 17 September 2020 diff hist 0 N File:903.18.4.pdf current
- 12:03, 17 September 2020 diff hist 0 N File:903.18.2.pdf current
- 12:02, 17 September 2020 diff hist +538 m 903.17 Delineation and Object Markers →903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65): Per TS, clarification
- 11:50, 17 September 2020 diff hist -272 m 903.17 Delineation and Object Markers Per TS, several minor clarifications
- 11:43, 17 September 2020 diff hist 0 m 903.17 Delineation and Object Markers Smithk moved page 903.18 Other Signing Items to 903.18 Delineation and Object Markers: Renamed, per TS
- 11:43, 17 September 2020 diff hist +51 N 903.18 Other Signing Items Smithk moved page 903.18 Other Signing Items to 903.18 Delineation and Object Markers: Renamed, per TS current Tag: New redirect
- 08:43, 17 September 2020 diff hist +4 m 236.6 Appraisal and Appraisal Review
- 08:28, 17 September 2020 diff hist -1 m 236.6 Appraisal and Appraisal Review
- 08:17, 17 September 2020 diff hist +1 m 236.6 Appraisal and Appraisal Review Per RW, updated link
- 14:18, 16 September 2020 diff hist -140 m Recent Policy Changes in the EPG EPG 127.27
- 14:15, 16 September 2020 diff hist +1,265 m 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities Per Env'l, updated process changes that FHWA has approved. Revision updates guidance to practice that has been established for a year. current
- 13:32, 16 September 2020 diff hist -12 m Recent Policy Changes in the EPG EPG 751.36.5.8
- 12:21, 16 September 2020 diff hist +2 m 751.36 Driven Piles →751.36.5.8 Additional Provisions for Pile Cap Footings
- 11:55, 16 September 2020 diff hist +1,102 m 751.36 Driven Piles →751.36.5.8 Additional Provisions for Pile Cap Footings: Per BR, updated to clarify pile uplift design requirements for pile cap footing and implement DSB-16-02 requirements.
- 09:50, 16 September 2020 diff hist +137 m Recent Policy Changes in the EPG EPG 203.2.3.1.2
- 09:47, 16 September 2020 diff hist -1,547 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.2.3.1.2 Borrow or Excess Material: Per CM and DE, replaced outdated guidance for contractor-furnished borrow.
- 09:05, 15 September 2020 diff hist -71 m Category:614 Drainage Fittings (Grate Inlets) updated links current
- 13:24, 14 September 2020 diff hist +101 m Category:724 Pipe Culverts →724.1 Pipe Selection and Sizing: Per CM, minor clarification
- 13:59, 11 September 2020 diff hist 0 N File:101 Land Disturbance Storm Water Database Closeout Procedure QRG 2020.pdf current
- 13:59, 11 September 2020 diff hist 0 m Category:101 Standard Forms →Storm Water Database Quick Reference Guides (QRGs): Per Env'l, updated Stormwater Database Closeout Procedure QRG to remove references to SiteManager adjustments that are no longer done.
- 09:54, 11 September 2020 diff hist -86 m Recent Policy Changes in the EPG EPG 127.2
- 09:30, 11 September 2020 diff hist 0 m 127.2 Historic Preservation and Cultural Resources
- 09:29, 11 September 2020 diff hist +21,256 m 127.2 Historic Preservation and Cultural Resources Per Env'l, FHWA requested guiance be updated to reflect changes in the Section 106 processes that have incrementally changed over the last few years
- 09:45, 10 September 2020 diff hist -40 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 09:22, 10 September 2020 diff hist -56 m 903.4 Overhead Sign Mounting Per TS, numerous minor clarifications
- 06:43, 10 September 2020 diff hist 0 N File:R10-14b.jpg current