User contributions for Hoskir
Jump to navigation
Jump to search
10 April 2025
- 08:0808:08, 10 April 2025 diff hist −1 m 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs →106.3.2.7.1 Apparatus
- 08:0808:08, 10 April 2025 diff hist +109 m 106.3.2.7 TM-7, Rebound Hammer for Opening Strength of Full Depth Concrete Pavement Repairs updated formatting
- 08:0508:05, 10 April 2025 diff hist +113 m 106.3.2.6 TM-6 updated formatting current
- 08:0508:05, 10 April 2025 diff hist +113 m 106.3.2.5 TM-5 updated formatting current
- 08:0508:05, 10 April 2025 diff hist +113 m 106.3.2.4 TM-4 updated formatting current
- 08:0408:04, 10 April 2025 diff hist +113 m 106.3.2.3 TM-3 updated formatting current
- 08:0208:02, 10 April 2025 diff hist +16 m 106.3.2 Material Inspection Test Methods updated formatting
- 07:5707:57, 10 April 2025 diff hist −11 106.3.2 Material Inspection Test Methods updated formatting
9 April 2025
- 16:0116:01, 9 April 2025 diff hist +38 m 106.3 Samples, Tests and Cited Specifications updated formatting
- 15:5415:54, 9 April 2025 diff hist 0 File:Test methods.png Hoskir uploaded a new version of File:Test methods.png current
- 15:5115:51, 9 April 2025 diff hist +27 N File:Test methods.png File uploaded with MsUpload
- 15:3815:38, 9 April 2025 diff hist +2 m 106.2 Local Materials Sources updated link and formatting
- 15:3715:37, 9 April 2025 diff hist 0 m 106.1 Source of Supply and Quality Requirements →Pre-Qualified Traffic Engineering Consultants for TEAP: updated formatting
- 15:3315:33, 9 April 2025 diff hist −41 m 106.1 Source of Supply and Quality Requirements →Pre-Qualified Traffic Engineering Consultants for TEAP: updated formatting
- 15:3115:31, 9 April 2025 diff hist −139 m 106.1 Source of Supply and Quality Requirements updated formatting
- 15:0915:09, 9 April 2025 diff hist −48 Category:106.3.2 Material Inspection Test Methods No edit summary
- 15:0415:04, 9 April 2025 diff hist +371 m 106.3.2 Material Inspection Test Methods →Inspections Based on Non-MoDOT Specifications: updated formatting
- 14:5114:51, 9 April 2025 diff hist +113 m 106.3.2.2 TM-2 updated formatting current
- 14:4914:49, 9 April 2025 diff hist +122 106.3.2.1 TM-1, Alkalinity of Glass Fiber Mat Materials updated formatting
- 14:4414:44, 9 April 2025 diff hist +57 m 106.3.2.1 TM-1, Alkalinity of Glass Fiber Mat Materials updated formatting
- 14:3514:35, 9 April 2025 diff hist −80 m 105.22 Duties of the District Construction and Materials Engineer updated formatting
- 14:3414:34, 9 April 2025 diff hist −43 m 105.20 Adjusting Water Service Leads updated formatting
- 14:3414:34, 9 April 2025 diff hist −4 105.19 Digital Signatures (Sec 105.19) updated formatting
- 14:2114:21, 9 April 2025 diff hist −39 105.9 Authority and Duties of Resident Engineer (Sec 105.9) updated formatting
- 11:3511:35, 9 April 2025 diff hist +88 m 104.13 Construction Inspection Guidance for Sec 104 updated formatting
- 11:2311:23, 9 April 2025 diff hist −6 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated formatting
- 11:1411:14, 9 April 2025 diff hist +44 m 104.11 Project Scoping Documentation updated formatting
- 11:1011:10, 9 April 2025 diff hist +14 m 104.7 Scoping Estimates updated formatting
- 11:0711:07, 9 April 2025 diff hist +23 m 104.6 Project Scoping Checklists updated formatting
- 10:5410:54, 9 April 2025 diff hist 0 104.2 Project Scoping No edit summary
- 10:5310:53, 9 April 2025 diff hist +7 104.2 Project Scoping updated formatting
- 10:5110:51, 9 April 2025 diff hist +39 104.2 Project Scoping updated formatting
- 10:2910:29, 9 April 2025 diff hist −31 103.1 Bid Opening and Award Process updated formatting
- 10:1910:19, 9 April 2025 diff hist −20 m 102.2 Contractor Performance Rating System updated formatting
- 10:1710:17, 9 April 2025 diff hist −18 m Category:101 Standard Forms No edit summary
- 10:1410:14, 9 April 2025 diff hist −2 m 102.2 Contractor Performance Rating System →102.2.4 Evaluation Determination
- 10:0810:08, 9 April 2025 diff hist +2 103.1 Bid Opening and Award Process →103.1.11 Recommendation for Award or Rejection of Bids
- 10:0710:07, 9 April 2025 diff hist −1 m Category:103 Award and Execution of Contract No edit summary
8 April 2025
- 15:4515:45, 8 April 2025 diff hist +90 m LPA:136.10 Advertisement for Bid and Project Award →136.10.7.1.1 Responsive Bid: added link to bidders quote summary
- 15:4315:43, 8 April 2025 diff hist +90 LPA:136.10 Advertisement for Bid and Project Award →136.10.6 Bid Submittal Requirements: added link to bidders quote summary
4 April 2025
- 15:5915:59, 4 April 2025 diff hist −2 m LPA:136.7 Design fixed cfr link
- 15:5515:55, 4 April 2025 diff hist −46 m LPA:136.7 Design updated CFR link
- 15:5215:52, 4 April 2025 diff hist −13 LPA:136.7 Design No edit summary
- 14:4714:47, 4 April 2025 diff hist −46 m 171.1 Administration fixed link to Delegation of Authority current
- 12:5812:58, 4 April 2025 diff hist +31 m 106.18 Technician Certification Program updated link to AASHTO training site Tag: visualeditor-switched
- 12:5812:58, 4 April 2025 diff hist +27 N File:AASHTO training.png File uploaded with MsUpload current
- 12:4912:49, 4 April 2025 diff hist −255 643.2 Local Utility Adjustments - Public and Private →643.2.10 Roadway Plans and Job Special Provisions: updated link to JSP
- 12:4012:40, 4 April 2025 diff hist −255 m Category:625 Slab Stabilization updated link to JSP0905 current
- 12:3712:37, 4 April 2025 diff hist −480 m 320.2 Release of Subsurface Information →320.2.1.1 General: Removed 1st sentence there is no longer a JSP0505 current
- 10:0310:03, 4 April 2025 diff hist −74 m 236.3 Administration removed link to right of way section that is no longer there