646.2 Pipelines

From Engineering_Policy_Guide
Revision as of 13:18, 11 January 2008 by Smithk (talk | contribs) (article construction)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Methods of handling pipeline items and other utility items are given in Utilities. The plans show pipeline owner, location, elevation, and disposition. Plan details are developed to minimize pipeline adjustment. Grades and location can sometimes be changed to avoid pipeline adjustment without materially affecting roadway costs. This particularly applies to low type roads.