Talk:127.9 Floodplain Management

From Engineering_Policy_Guide
Revision as of 10:10, 20 November 2008 by Martik2 (talk | contribs) (127.9.2 Process)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Could you explain the meaning of the second to last sentence in 127.9.2? Should the first reference to "regulatory floodway" be changed to "100-year floodplain"?

If there is to be an encroachment into the regulatory floodway, MoDOT must issue a "No-Rise" Certification as required by SEMA to obtain a floodplain development permit that is needed for any encroachment into the 100-year floodplain, regardless of whether it also takes place within the regulatory floodway.