751.32.1 General
751.32.1.1 Material Properties
Concrete
|
Typically, shall consist of:
|
|
Class B Concrete (Substructure) |
|
= 3.0 ksi
|
|
|
|
= 10
|
In addition, Class B-1 Concrete (Substructure) may also be used in special cases (See Project Manager). The following equations shall apply to both concrete classes:
Concrete modulus of elasticity:
Where:
|
= unit weight of non-reinforced concrete = 0.145 kcf
|
|
= correction factor for source of aggregate = 1.0
|
Modulus of Rupture: |
For minimum reinforcement, |
|
|
For all other calculations, |
|
is in units of ksi |
|
|
Reinforcing Steel
Minimum yield strength, |
|
= 60.0 ksi
|
Steel modulus of elasticity, |
|
= 29000 ksi
|
751.32.2 Design
751.32.2.1 Limit States and Factors
In general, each component shall satisfy the following equation:
Where:
|
= Total factored force effect
|
|
= Force effect
|
|
= Load modifier
|
|
= Load factor
|
|
= Resistance factor
|
|
= Nominal resistance
|
|
= Factored resistance
|
Limit States
The following limit states shall be considered for bent design:
- STRENGTH – I
- STRENGTH – III
- STRENGTH – IV
- STRENGTH – V
- SERVICE – I
- FATIGUE
See LRFD Table 3.4.1-1 and LRFD 3.4.2 for Loads and Load Factors applied at each given limit state.
Resistance factors
- STRENGTH limit states, see LRFD 5.5.4.2
- For all other limit states, = 1.00
Load Modifiers
751.32.3 Details
751.32.3.1 General
|
|
(*) 3" (Typ.)
|
Part Elevation |
Part Section
|
|
Use 2'-6" minimum or as determined by the superstructure requirements or the minimum support length required for earthquake criteria (expansion joint bents only) (3" increments).
|
|
= 2'-9" (Min.) for Wide Flange and Double-Tee Girders or, 3'-0" (Min.) for Prestressed Girders and Plate Girders.
|
|
Check the clearance of the anchor bolt well to the top of pile. Increase the beam depth if needed.
|
|
If the depth at the end of the beam, due to the steps, exceeds 4~6", the beam bottom should be stepped or sloped.
|
|
Use 3/4" bevel strip if expansion device is located at bent. Continue to use 1-1/2" clear to reinforcing steel in bottom of beam.
|
|
Minimum of 3 piles at 10'-0" cts., maximum spacing (1" increments).
|
751.32.3.2 Front Sheet
Note: |
The following are details and dimensions for the Plan View on the Front Sheets.
|
|
Details for unsymmetrical roadways will require dimensions tying Centerline Lane to Centerline Structure.
|
751.32.4 Reinforcement
751.32.4.1 General
|
|
Part Elevation |
Section Thru Beam
|
|
|
|
Part Plan |
|
Note: |
Locate #4 bars "" under bearings where required to maintain a 6" maximum spacing of combined stirrups. (#4 bars "" are not required for Double-Tee Structures.)
|
|
When an expansion device is used at an intermediate bent, all reinforcement located entirely within the beam or extending into the beam shall be epoxy coated.
|
|
|
* #4 Bars () not required for Double-Tee structures
|
Reinforcement Under Bearings
|
|
|
Transverse Beam Steps - Over 3" or Steps Accumulating Over 3"
|
|
Part Plan
|
|
|
Over 3" thru 12" |
Over 12"
|
Longitudinal Beam Steps
|