Category talk:625 Slab Stabilization

From Engineering_Policy_Guide
Revision as of 07:36, 22 October 2009 by EPG-Admin (talk | contribs) (New page: Dan Tschirgi: This new slab stabilization guidance is the result of comments on the former "625 Undersealing Pavement" guidance. As a result of the comment, a new Sec 625...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Dan Tschirgi: This new slab stabilization guidance is the result of comments on the former "625 Undersealing Pavement" guidance. As a result of the comment, a new Sec 625 specification and this guidance were developed which incorporate a practical design approach with contractor options for both undersealing and slab jacking.