Talk:108.1 Project Dates

From Engineering_Policy_Guide
Revision as of 12:48, 19 March 2010 by EPG-Admin (talk | contribs) (New page: The Construction Division requires a key date for Recorded Survey when new ROW is acquired on a project. The definitions section does not list this key date. Can it be added? Thanks!)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Construction Division requires a key date for Recorded Survey when new ROW is acquired on a project. The definitions section does not list this key date. Can it be added? Thanks!