106.5 Storage of Materials

From Engineering_Policy_Guide
Revision as of 09:03, 1 July 2010 by Smithk (talk | contribs) (Per CM, for greater clarity,old EPG 106.5 (2258 hits) was moved to EPG 106.3. 3/20/09: Screw-top metal containers were specified for some materials listed in this table, per Chemical Lab)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

It is the responsibility of the contractor to ensure materials are stored properly and that the quality of the stored material is preserved. It is also the responsibility of the contractor to ensure that materials are stored in such a manner to facilitate materials inspection.