106.6 Handling Material

From Engineering_Policy_Guide
Revision as of 11:27, 1 July 2010 by Smithk (talk | contribs) (Per CM, for greater clarity,old EPG 106.6 (519 hits) was moved to EPG 106.20. New EPG 106.6 is more aligned with Sec 106.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Materials shall be handled in such a manner as to ensure that the quality of material is preserved. It is the contractor's responsibility to ensure that appropriate measures are taken to guarantee that material being incorporated into the project has not been damaged, segregated or contaminated due to poor handling practices.