Category talk:101 Standard Forms

From Engineering_Policy_Guide
Revision as of 14:27, 16 March 2011 by Smithk (talk | contribs)
Jump to navigation Jump to search

Please Correct the "construction Contingency" Cell within the Project Scoping Memorandum. Construction Contingency is suppose to be 2% but the cell is multiplying it by 3%.

Dan Tschirgi:The Project Scoping Memorandum has been corrected.

At least one of the posters on this page (MCHR-9) is outdated. Would it be better to just have a link to the posters on MoDOT's "Contractor Forms" page? [1] --Martik2 12:16, 9 March 2010 (CST)

Keith L. Smith: Thanks for the heads up. We got with External Civil Rights and they have revised what they want in the EPG.