Category:618 Mobilization

From Engineering_Policy_Guide
Revision as of 15:05, 11 February 2015 by Smithk (talk | contribs) (Per CM, update to provide additional information on how to make payment for contract bond and railroad liability insurance)
Jump to navigation Jump to search
618 Mobilization.jpg

Mobilization includes the movement and preparation of facilities, equipment, supplies and personnel for work on the project. Mobilization costs are included on every project and may be estimated at 4% of the project's total construction cost. This figure will be more carefully analyzed and adjusted by Design.

No standard plans are associated with mobilization, but the Mobilization standard spec is included in the Missouri Standard Specification for Highway Construction.

See EPG 103.2 Contract Bond for Sec 103.4 for guidance on how to adjust mobilization in order to reimburse the contractor for the cost of the contract bond and railroad liability insurance.