109.3 Compensation for Altered Quantities (for Sec 109.3)

From Engineering Policy Guide
Revision as of 11:43, 1 May 2025 by Hoskir (talk | contribs) (moved from main category to new page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Typically this applies to Major Items, which are marked in the Items window of AWP. When there are no major items identified on the job, the greatest cost items on the job, that aggregately add up to 60% of the contract, are defined as the major items even though any one of them does not meet the 10% criteria of a Major Item.