- 09:51, 4 February 2015 diff hist +39 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Clarified that guardrail height is measured to the top of the beam.
- 13:48, 5 September 2014 diff hist -11 m 750.7 Non-Hydraulic Considerations →750.7.2 Types: Clarified the parameters of Type C pipe use in the 'Permissible Pipe Types by Group' table.
- 13:54, 29 August 2014 diff hist -304 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Clarified guardrail considerations for 1R, 2R, 3R, and 4R work.
- 09:43, 19 August 2014 diff hist -2 141.1 Cost Share Program
- 09:42, 19 August 2014 diff hist -83 m 141.1 Cost Share Program Clarified the intent of the sidebar concerning the Commission's suspension of the Cost Share Program.
- 10:06, 18 August 2014 diff hist 0 m 141.1 Cost Share Program Added color to notice to increase target value
- 12:19, 21 July 2014 diff hist +384 m 131.1 Design Exception Process →131.1.5.1 Safety related features: Clarified intent of HSM analysis.
- 12:23, 11 July 2014 diff hist 0 N File:409 JSP FY15.doc current
- 12:23, 11 July 2014 diff hist -3 Category:409 Seal Coat
- 12:17, 11 July 2014 diff hist 0 N File:409 SEAL COAT MODOT STRIPING.pdf
- 12:17, 11 July 2014 diff hist 0 N File:409 JSP 07 2014.doc current
- 12:17, 11 July 2014 diff hist 0 N File:409 FY2015 Contract Seal Coat Guidelines.pdf
- 12:16, 11 July 2014 diff hist -4 Category:409 Seal Coat
- 12:09, 11 July 2014 diff hist 0 N File:402 FY2015 Contract Leveling Course Guidelines.pdf
- 12:07, 11 July 2014 diff hist 0 N File:402 CLC MODOT STRIPE.pdf
- 12:06, 11 July 2014 diff hist 0 N File:402 CLC CONTRACTOR STRIPE.pdf
- 12:06, 11 July 2014 diff hist -175 Category:402 Bituminous Surface Leveling
- 12:02, 11 July 2014 diff hist 0 N File:402 JSP FY15.doc current
- 13:45, 9 July 2014 diff hist -5 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) minor clarifications
- 12:08, 25 March 2014 diff hist +125 m 606.2 Guard Cable →606.2.7 Construction Inspection Guidelines for Guard Cable: Clarified policy on 4:1 approved systems.
- 11:59, 25 March 2014 diff hist +12 m 606.2 Guard Cable →606.2.4.4 Slopes: Updated information on proprietary systems to more accurately reflect the state of the industry.
- 10:36, 19 March 2014 diff hist +3 m Category:128 Conceptual Studies →128.2 Preventive Maintenance Projects (1R and 2R): Clarified intent
- 13:34, 11 February 2014 diff hist -4 m 606.1 Guardrail →606.1.3.9 Bridge Ends: Clarified wording
- 07:43, 6 December 2013 diff hist +2 m Category:503 Bridge Approach Slabs →503.2 Minor Roads: Corrected misspelling
- 08:20, 21 August 2013 diff hist +26 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Clarified 3R requirements for upgrading bridge end connections.
- 07:09, 24 July 2013 diff hist 0 m 606.1 Guardrail →606.1.3.7 Fixed Objects: Updated Roadside Design Guide figure number
- 07:03, 13 June 2013 diff hist +235 m Help Article →Use of Terms in the EPG: Terms clarified to match the same definitions elsewhere in the EPG.
- 13:53, 19 March 2013 diff hist +74 m Category:645 Mailbox Turnouts and Supports Added a link to Standard Plan 203.35 for added convenience.
- 06:28, 18 December 2012 diff hist +85 m 606.2 Guard Cable →606.2.3 Warrants: Clarified the effect of median width on cable warrants
- 07:56, 20 November 2012 diff hist +25 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Clarified the intent of Safety Edge on paved shoulders.
- 15:34, 8 November 2012 diff hist -21 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Slightly re-worded for clarity
- 10:34, 10 October 2012 diff hist +35 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.1 Measurement for Payment: Clarified the depth measurement for drop inlets.
- 14:05, 17 September 2012 diff hist +23 Category:Minor Routes Shouldering Project Guidelines →Minimum Expectations
- 13:02, 13 September 2012 diff hist 0 File:409 JSP Sept 2012.doc uploaded a new version of "Image:409 JSP Sept 2012.doc" current
- 13:37, 5 September 2012 diff hist +19 m 230.2 Vertical Alignment →230.2.10 Bridge Considerations: Clarified intent of design exception.
- 10:57, 3 August 2012 diff hist +64 m Category:Minor Routes Shouldering Project Guidelines →Minimum Expectations: Safety Edge added as minimum requirement.
- 09:52, 25 July 2012 diff hist -27,953 m 606.1 Guardrail Removed accidental replication
- 07:49, 25 July 2012 diff hist +27,879 606.1 Guardrail Published the new guardrail height requirements per FHWA and AASHTO.
- 07:39, 25 July 2012 diff hist -9 m 606.2 Guard Cable →606.2.4.1 Lateral Placement in the Median: Wordsmithing
- 07:37, 25 July 2012 diff hist +345 m 606.2 Guard Cable →606.2.4.1 Lateral Placement in the Median: Clarified the parameters of lateral placement of high-tension cable barriers in the median.
- 14:00, 27 April 2012 diff hist +233 m Category:130 Value Engineering →130.1.3 VE Workplan/Project Selection: Added cost thresholds for federally required Value Engineering Studies
- 08:53, 17 April 2012 diff hist -234 m 606.2 Guard Cable →606.2.5 Maintenance and Repair: Removed superfluous text.
- 08:12, 22 February 2012 diff hist 0 m 903.6 Warning Signs Legal vehicle height in commercial zone corrected to 15 ft.
- 12:25, 8 February 2012 diff hist -403 m 233.2 At-Grade Intersections with Stop and Yield Control Removed unrealistic requirement for 3 years evaluation of median acceleration lanes.
- 11:23, 8 February 2012 diff hist -5 m Category:626 Rumble Strips Clarified the intent of collaboration on the omission and modification of systemwide safety treatments.
- 12:50, 9 January 2012 diff hist +82 m 171.6 Roadsides →RDS(E10) Clear Zone: Clarified the resources for establishing and maintaining clear zones.
- 12:31, 9 January 2012 diff hist +27 m 120.6 Roadsides →Performance Objectives: Changes the zone of hardscape prohibition from the static 30 ft. to the more inclusive 'clear zone.'
- 10:55, 9 January 2012 diff hist +29 m 902.18 Glossary Clarified definition of 'Clear Zone' to more accurately reflect the AASHTO definition.
- 10:08, 9 January 2012 diff hist +398 m 231.2 Clear Zones →231.2.1 Introduction: Clarified the difference between a deliberate 'Clear Zone' and an incidental 'Clear Area.'
- 09:47, 4 January 2012 diff hist +43 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Clarified oversight parameters.