Difference between revisions of "102.1 Construction Inspection Guidance for Sec 102"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per CM, info from EPG 102.2 moved to this article.)
m
Line 1: Line 1:
 +
[[image:102.1.jpg|right|250px]]
 
Bidding requirements and conditions for contractors are addressed in [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec 102] of the Missouri Standard Specifications for Highway Construction.
 
Bidding requirements and conditions for contractors are addressed in [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec 102] of the Missouri Standard Specifications for Highway Construction.
  

Revision as of 08:16, 5 June 2015

102.1.jpg

Bidding requirements and conditions for contractors are addressed in Sec 102 of the Missouri Standard Specifications for Highway Construction.

The Commission accepts bids for projects under conditions established by Sec. 102 of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.