Difference between revisions of "104.9 Environmental Considerations"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (minor clarification to differentiate EPG articles (that are referenced as "articles", not "sections") from specifications (that are referenced as "sections"))
m (Per Environmental, updated link)
Line 1: Line 1:
 
[[image:104.9 Environmental Considerations.jpg|right|400px]]
 
[[image:104.9 Environmental Considerations.jpg|right|400px]]
  
By the time the scoping is completed for a given project, the appropriate [[127 MoDOT and the Environment|environmental documentation]] will have been completed for the project.  This is not to say that the project is clear and that additional work may not be necessary later in the process.  However, the appropriate environmental document will be approved at this point.  A location public hearing will be held and the location approved by the Commission, if necessary.
+
By the time the scoping is completed for a given project, the appropriate [http://epg.modot.org/index.php?title=Category:127_MoDOT_and_the_Environment environmental documentation] will have been completed for the project.  This is not to say that the project is clear and that additional work may not be necessary later in the process.  However, the appropriate environmental document will be approved at this point.  A location public hearing will be held and the location approved by the Commission, if necessary.
  
 
Therefore, any commitments that are required as a part of the environmental process shall be included in the scope of the project prior to the time that STIP commitments are made.  [[127.14 National Environmental Policy Act (NEPA) Classification and Documents|EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents]] contains the guidelines and requirements for preparing environmental documents and should be consulted for additional details.
 
Therefore, any commitments that are required as a part of the environmental process shall be included in the scope of the project prior to the time that STIP commitments are made.  [[127.14 National Environmental Policy Act (NEPA) Classification and Documents|EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents]] contains the guidelines and requirements for preparing environmental documents and should be consulted for additional details.
  
 
[[category:104_Scope|104.09]]
 
[[category:104_Scope|104.09]]

Revision as of 15:04, 2 April 2012

104.9 Environmental Considerations.jpg

By the time the scoping is completed for a given project, the appropriate environmental documentation will have been completed for the project. This is not to say that the project is clear and that additional work may not be necessary later in the process. However, the appropriate environmental document will be approved at this point. A location public hearing will be held and the location approved by the Commission, if necessary.

Therefore, any commitments that are required as a part of the environmental process shall be included in the scope of the project prior to the time that STIP commitments are made. EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents contains the guidelines and requirements for preparing environmental documents and should be consulted for additional details.