https://epg.modot.org/index.php?title=106.5_Storage_of_Materials&feed=atom&action=history106.5 Storage of Materials - Revision history2024-03-28T14:41:25ZRevision history for this page on the wikiMediaWiki 1.33.1https://epg.modot.org/index.php?title=106.5_Storage_of_Materials&diff=23484&oldid=prevSmithk: Per CM, for greater clarity,old EPG 106.5 (2258 hits) was moved to EPG 106.3. 3/20/09: Screw-top metal containers were specified for some materials listed in this table, per Chemical Lab2010-07-01T15:03:35Z<p>Per CM, for greater clarity,old EPG 106.5 (2258 hits) was moved to EPG 106.3. 3/20/09: Screw-top metal containers were specified for some materials listed in this table, per Chemical Lab</p>
<p><b>New page</b></p><div>It is the responsibility of the contractor to ensure materials are stored properly and that the quality of the stored material is preserved. It is also the responsibility of the contractor to ensure that materials are stored in such a manner to facilitate materials inspection.<br />