Difference between revisions of "106.6 Handling Material"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per CM, for greater clarity,old EPG 106.6 (519 hits) was moved to EPG 106.20. New EPG 106.6 is more aligned with Sec 106.)
 
(No difference)

Latest revision as of 12:27, 1 July 2010

Materials shall be handled in such a manner as to ensure that the quality of material is preserved. It is the contractor's responsibility to ensure that appropriate measures are taken to guarantee that material being incorporated into the project has not been damaged, segregated or contaminated due to poor handling practices.