https://epg.modot.org/index.php?title=106.6_Handling_Material&feed=atom&action=history106.6 Handling Material - Revision history2024-03-28T08:30:36ZRevision history for this page on the wikiMediaWiki 1.33.1https://epg.modot.org/index.php?title=106.6_Handling_Material&diff=23530&oldid=prevSmithk: Per CM, for greater clarity,old EPG 106.6 (519 hits) was moved to EPG 106.20. New EPG 106.6 is more aligned with Sec 106.2010-07-01T17:27:48Z<p>Per CM, for greater clarity,old EPG 106.6 (519 hits) was moved to EPG 106.20. New EPG 106.6 is more aligned with Sec 106.</p>
<p><b>New page</b></p><div>Materials shall be handled in such a manner as to ensure that the quality of material is preserved. It is the contractor's responsibility to ensure that appropriate measures are taken to guarantee that material being incorporated into the project has not been damaged, segregated or contaminated due to poor handling practices.<br />
<br />
[[category: 106 Control of Material|106.06]]</div>Smithk