Difference between revisions of "Category:103 Award and Execution of Contract"

From Engineering_Policy_Guide
Jump to navigation Jump to search
Line 1: Line 1:
The goal of MoDOT’s bid opening and award process (also see [http://www.modot.mo.gov/business/standards_and_specs/Sec0103.pdf Sec. 103] fo the Missouri Standard Specifications for Highway Construction) is to achieve competitive bids by packaging projects in a manner that makes them as attractive as possible to potential bidders.  Methods of achieving this goal include, but are not limited to, establishing appropriate bid opening dates for the type of work, maintaining a stable bid opening schedule, and grouping or dividing projects to make them more appealing to bidders.
+
The goal of MoDOT’s bid opening and award process (also see [http://www.modot.mo.gov/business/standards_and_specs/Sec0103.pdf Sec. 103] of the Missouri Standard Specifications for Highway Construction) is to achieve competitive bids by packaging projects in a manner that makes them as attractive as possible to potential bidders.  Methods of achieving this goal include, but are not limited to, establishing appropriate bid opening dates for the type of work, maintaining a stable bid opening schedule, and grouping or dividing projects to make them more appealing to bidders.

Revision as of 14:56, 29 October 2007

The goal of MoDOT’s bid opening and award process (also see Sec. 103 of the Missouri Standard Specifications for Highway Construction) is to achieve competitive bids by packaging projects in a manner that makes them as attractive as possible to potential bidders. Methods of achieving this goal include, but are not limited to, establishing appropriate bid opening dates for the type of work, maintaining a stable bid opening schedule, and grouping or dividing projects to make them more appealing to bidders.

Articles in "103 Award and Execution of Contract"

The following 2 pages are in this category, out of 2 total.