Difference between revisions of "Category:106 Control of Material"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Updated link.)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
[[image:106.jpg|right|400px]]
 
[[image:106.jpg|right|400px]]
[http://www.modot.mo.gov/business/standards_and_specs/Sec0106.pdf Sec 106] establishes the respective obligations of contractor and MoDOT concerning materials to be used.  
+
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106] establishes the respective obligations of contractor and MoDOT concerning materials to be used.  
  
 
While most of Sec 106 concerns responsibilities of Construction and Materials, the resident engineer must be aware of its provisions. As MoDOT's representative on the project, the resident engineer must see that all project procedures are in harmony with specifications. No materials should be used for which the resident engineer does not have approval.  
 
While most of Sec 106 concerns responsibilities of Construction and Materials, the resident engineer must be aware of its provisions. As MoDOT's representative on the project, the resident engineer must see that all project procedures are in harmony with specifications. No materials should be used for which the resident engineer does not have approval.  
Line 11: Line 11:
 
[[Where to Find Construction and Materials Functions#Laboratory Testing Guide EPG articles from the former Construction and Materials Manual, Volume 2|'''Laboratory testing guidelines''']], like the field inspection guidelines, are located in “Laboratory Testing Guidelines” articles for the specific spec number desired.  For example, [[1020.8 Laboratory Testing Guidelines for Sec 1020|EPG 1020.8 Laboratory Testing Guidelines for Sec 1020]] pertains to sampling metallic-coated steel culvert metal.  Additional laboratory testing guidelines are located in the EPG 1100 Maintenance Materials group of articles, such as [[:Category:1124 Sodium Chloride#1124.4 Laboratory Testing Guidelines|EPG 1124.4 Laboratory Testing Guidelines]].
 
[[Where to Find Construction and Materials Functions#Laboratory Testing Guide EPG articles from the former Construction and Materials Manual, Volume 2|'''Laboratory testing guidelines''']], like the field inspection guidelines, are located in “Laboratory Testing Guidelines” articles for the specific spec number desired.  For example, [[1020.8 Laboratory Testing Guidelines for Sec 1020|EPG 1020.8 Laboratory Testing Guidelines for Sec 1020]] pertains to sampling metallic-coated steel culvert metal.  Additional laboratory testing guidelines are located in the EPG 1100 Maintenance Materials group of articles, such as [[:Category:1124 Sodium Chloride#1124.4 Laboratory Testing Guidelines|EPG 1124.4 Laboratory Testing Guidelines]].
  
The '''Automation Guide''' is available through [[106.20 Reporting#106.20.1.1 Automation Section 3510|EPG 106.20.1.1 Automation Section 3510]].
+
The '''Automation Guide''' is available through [[106.20 Reporting#106.20.1.1 Automation Section|EPG 106.20.1.1 Automation Section]].
  
 
'''Payment documentation''' is available at [[:Category:109 Measurement and Payment|EPG 109 Measurement and Payment]].
 
'''Payment documentation''' is available at [[:Category:109 Measurement and Payment|EPG 109 Measurement and Payment]].
Line 21: Line 21:
 
The [http://www.modot.mo.gov/business/materials/pdf/TechCert/TechContent.pdf '''Technician Certification Program'''] includes a wide variety of information from how to become certified, to certification manuals to math topics.
 
The [http://www.modot.mo.gov/business/materials/pdf/TechCert/TechContent.pdf '''Technician Certification Program'''] includes a wide variety of information from how to become certified, to certification manuals to math topics.
  
The '''General Sections''' of the former Construction and Materials Manual are also available, including [[:category:132 Safety|safety]], [[106.4 Plant Inspections|plant inspections]], [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]], [[106.20 Reporting|internal records]], [[106.19 Materials Acceptance#106.19.1 Certifications|certifications]], [[106.21 Summary of Materials Inspected|summary of materials inspected]], [[106.22 Material Inspection Revisions|guideline revisions]], [[106.15 Pipe Shipping Report Form|Pipe Shipping Report Form]], [[106.16 Special Designs|special designs]] and [[106.24 Purchase Order Items|purchase order items]].  The "Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation" portion of the old manual is now [[616.10 Product Requirements for Temporary Traffic Control Devices, Pavement Marking and Delineation|EPG 616.10]].
+
The '''General Sections''' of the former Construction and Materials Manual are also available, including [[:category:132 Safety|safety]], [[106.4 Plant Inspections|plant inspections]], [[106.3 Samples, Tests and Cited Specifications#106.3.1 Sampling|sampling]], [[106.20 Reporting|internal records]], [[106.19 Materials Acceptance#106.19.1 Certifications|certifications]], [[106.21 Summary of Materials Inspected|summary of materials inspected]], [[106.22 Material Inspection Revisions|guideline revisions]], [[106.15 Pipe Shipping Report Form|Pipe Shipping Report Form]], [[106.16 Special Designs|special designs]] and [[106.24 Purchase Order Items|purchase order items]].  
  
 
Inspection guidelines for the [[903.23 Material Inspection for Sec 903#903.23.4 Missouri Logo Sign Program|Missouri Logo Sign Program]], formerly included in the former Construction and Materials Manual, is available.
 
Inspection guidelines for the [[903.23 Material Inspection for Sec 903#903.23.4 Missouri Logo Sign Program|Missouri Logo Sign Program]], formerly included in the former Construction and Materials Manual, is available.
  
{|style="padding: 0.3em; margin-left:5px; border:3px solid #a9a9a9; text-align:left; font-size: 95%; background:#ffff99" width="270px" align="right"  
+
{|style="padding: 0.3em; margin-left:8px; border:3px solid #a9a9a9; text-align:left; font-size: 95%; background:#ffff99" width="350px" align="right"  
 
|-
 
|-
 
|<center>'''Where to Find Construction and Materials Function Articles in the EPG'''</center>
 
|<center>'''Where to Find Construction and Materials Function Articles in the EPG'''</center>
Line 33: Line 33:
 
|* [[Where to Find Construction and Materials Functions#Laboratory Testing Guide EPG articles from the former Construction and Materials Manual, Volume 2|'''Laboratory Testing Guide''' EPG articles from the former Construction and Materials Manual, Volume 2]]
 
|* [[Where to Find Construction and Materials Functions#Laboratory Testing Guide EPG articles from the former Construction and Materials Manual, Volume 2|'''Laboratory Testing Guide''' EPG articles from the former Construction and Materials Manual, Volume 2]]
 
|-
 
|-
|* [[106.20 Reporting#106.20.1.1 Automation Section 3510|'''Automation Guide EPG''' article from the former Construction and Materials Manual, Volume 3]]
+
|* [[106.20 Reporting#106.20.1.1 Automation Section|'''Automation Guide EPG''' article from the former Construction and Materials Manual, Volume 3]]
 
|-
 
|-
 
|* [[:Category:109 Payment Documentation Policy|'''Payment Documentation Policy''']]
 
|* [[:Category:109 Payment Documentation Policy|'''Payment Documentation Policy''']]
Line 45: Line 45:
 
|* [[106.17 New Product Evaluation|'''New Product Evaluation''']]
 
|* [[106.17 New Product Evaluation|'''New Product Evaluation''']]
 
|-
 
|-
|* [http://www.modot.mo.gov/business/standards_and_specs/jobspecialprovisions.htm '''Job Special Provisions''']
+
|* [https://spexternal.modot.mo.gov/sites/de/JSP/Forms/JSPByTitle.aspx '''Job Special Provisions''']
 
|-
 
|-
|* [http://www.modot.mo.gov/business/materials/pdf/mgs/MGSINDEX.pdf '''Materials General Services Special Provisions''' (MGS) By Subject]
+
|* [https://www.modot.org/general-services-specifications-mgs-subject '''Materials General Services Special Provisions''' (MGS) By Subject]
 
|-
 
|-
 
|* [[106.18 Technician Certification Program|'''Technician Certification Program''']]
 
|* [[106.18 Technician Certification Program|'''Technician Certification Program''']]
Line 66: Line 66:
 
'''Certification''', A document issued by a company wherein they certify that material is in accordance with the specification. Explicit requirements are shown in [[106.19 Materials Acceptance#106.19.1 Certifications|EPG 106.19.1 Certifications]].
 
'''Certification''', A document issued by a company wherein they certify that material is in accordance with the specification. Explicit requirements are shown in [[106.19 Materials Acceptance#106.19.1 Certifications|EPG 106.19.1 Certifications]].
  
'''District''', One of ten geographical areas of the state of Missouri administered by a District Engineer of MoDOT.
+
'''District''', One of seven geographical areas of the state of Missouri administered by a District Engineer of MoDOT.
  
 
'''FTMS''', Federal Test Method Standards
 
'''FTMS''', Federal Test Method Standards
Line 76: Line 76:
 
'''Quotation''', A statement, in writing, by a supplier that materials or services needed by MoDOT will be supplied at a certain price.
 
'''Quotation''', A statement, in writing, by a supplier that materials or services needed by MoDOT will be supplied at a certain price.
  
Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec0101.pdf Sec 101] for any abbreviation or definition not listed above.
+
Refer to [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 101] for any abbreviation or definition not listed above.

Latest revision as of 14:17, 18 January 2022

106.jpg

Sec 106 establishes the respective obligations of contractor and MoDOT concerning materials to be used.

While most of Sec 106 concerns responsibilities of Construction and Materials, the resident engineer must be aware of its provisions. As MoDOT's representative on the project, the resident engineer must see that all project procedures are in harmony with specifications. No materials should be used for which the resident engineer does not have approval. Specific requirements for inspection and testing are found in the Engineering Policy Guide.

This article presents guidelines for Construction and Materials functions, including information from the former Construction and Materials Manual, Volumes 1-3.

For field inspection guidance, refer to “Construction Inspection Guidelines” articles in the EPG for the specific spec number desired (for example, EPG 200.1 Construction Inspection Guidance for Grading and Removals). Additional field inspection guidelines are located in the EPG 1100 Maintenance Materials group of articles, such as EPG 1106 Carbide-Tipped Snowplow Blades.

Laboratory testing guidelines, like the field inspection guidelines, are located in “Laboratory Testing Guidelines” articles for the specific spec number desired. For example, EPG 1020.8 Laboratory Testing Guidelines for Sec 1020 pertains to sampling metallic-coated steel culvert metal. Additional laboratory testing guidelines are located in the EPG 1100 Maintenance Materials group of articles, such as EPG 1124.4 Laboratory Testing Guidelines.

The Automation Guide is available through EPG 106.20.1.1 Automation Section.

Payment documentation is available at EPG 109 Measurement and Payment.

MoDOT’s Test Methods are located at EPG 106.3.2 Material Inspection Test Methods.

MoDOT's pre-qualified or pre-established lists are located at EPG 106.1 Source of Supply and Quality Requirements. Guidance for pre-acceptance lists (PAL) and the PAL Inspection Guide is available at EPG 106.12 Pre-Acceptance Lists (PAL). New product evaluation information and forms are located at EPG 106.17 New Product Evaluation.

The Technician Certification Program includes a wide variety of information from how to become certified, to certification manuals to math topics.

The General Sections of the former Construction and Materials Manual are also available, including safety, plant inspections, sampling, internal records, certifications, summary of materials inspected, guideline revisions, Pipe Shipping Report Form, special designs and purchase order items.

Inspection guidelines for the Missouri Logo Sign Program, formerly included in the former Construction and Materials Manual, is available.

Where to Find Construction and Materials Function Articles in the EPG
* Field Inspection Guidance EPG articles from the former Construction and Materials Manual, Volume 1
* Laboratory Testing Guide EPG articles from the former Construction and Materials Manual, Volume 2
* Automation Guide EPG article from the former Construction and Materials Manual, Volume 3
* Payment Documentation Policy
* Material Inspection Test Methods
* Source of Supply and Quality Requirements
* Pre-Acceptance Lists (PAL) and Forms
* New Product Evaluation
* Job Special Provisions
* Materials General Services Special Provisions (MGS) By Subject
* Technician Certification Program
* Active Project Directory
* Materials Personnel

Abbreviations and definitions

Abbreviations and definitions used in EPG 106 Control of Material include:

AOAC, Association of Official Agricultural Chemists

Bid Request or Bid Proposal, An invitation to suppliers to submit a bid for furnishing materials and service needed, in specified quantities, in accordance with MoDOT requirements. The request furnishes the necessary information for the supplier to prepare a bid.

Certification, A document issued by a company wherein they certify that material is in accordance with the specification. Explicit requirements are shown in EPG 106.19.1 Certifications.

District, One of seven geographical areas of the state of Missouri administered by a District Engineer of MoDOT.

FTMS, Federal Test Method Standards

Material, The substance or substances incorporated in the construction or maintenance of highway structures, bridges and incidentals.

Purchase Order, The notice to a supplier that the bid has been accepted and that the supplier may proceed to deliver the material or perform the service specified in the bid request. The purchase order further informs MoDOT personnel to proceed with inspection, if required and acceptance.

Quotation, A statement, in writing, by a supplier that materials or services needed by MoDOT will be supplied at a certain price.

Refer to Sec 101 for any abbreviation or definition not listed above.