Difference between revisions of "Category:200 GEOMETRICS"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (new article, EPG 241)
m (New EPG 242)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[image:200 Geometrics.jpg|right|400px]]
+
[[image:200 Geometrics.jpg|right|370px]]
[[image:200 DDI.jpg|right|400px]]
+
[[image:200 DDI.jpg|right|370px]]
 +
[[image:200 design.jpg|right|370px]]
 +
 
 +
 
 
<categorytree mode=all>201 Clearing and Grubbing</categorytree>
 
<categorytree mode=all>201 Clearing and Grubbing</categorytree>
 
<categorytree mode=all>202 Removal of Buildings and Structures</categorytree>
 
<categorytree mode=all>202 Removal of Buildings and Structures</categorytree>
Line 28: Line 31:
 
<categorytree mode=all>240 Maintenance and Emergency Crossovers</categorytree>
 
<categorytree mode=all>240 Maintenance and Emergency Crossovers</categorytree>
 
<categorytree mode=all>241 Aesthetic Considerations</categorytree>
 
<categorytree mode=all>241 Aesthetic Considerations</categorytree>
 +
<categorytree mode=all>242 Optional and Alternate Pavement Designs</categorytree>
  
 
{|style="padding: 0.3em; margin-left:2px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="790px" align="center"  
 
{|style="padding: 0.3em; margin-left:2px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="790px" align="center"  
 
|-
 
|-
|EPG articles are not referenced as "sections" but as EPG XXX.X or "articles" to avoid confusion with MoDOT specs.
+
|EPG articles are not referenced as "sections" but as EPG XXX.X or "articles" to avoid confusion with MoDOT specs (which are contractually binding).
 
|}
 
|}
  
Line 50: Line 54:
 
'''Traffic Control Plan'''
 
'''Traffic Control Plan'''
  
Enforcement of specific safety measures includes requiring all work be properly barricaded and/or signed in accordance with the [[616.1 Preparation of Traffic Control Plan (TCP)|Traffic Control Plan]] included in the contract.  The plan requires that [[903.5 Regulatory Signs|signs]] be kept clean, legible, in alignment and in good repair.
+
Enforcement of specific safety measures includes requiring all work be properly barricaded and/or signed in accordance with the Traffic Control Plan included in the contract.  The plan requires that [[903.5 Regulatory Signs|signs]] be kept clean, legible, in alignment and in good repair.

Latest revision as of 12:33, 18 December 2020

200 Geometrics.jpg
200 DDI.jpg
200 design.jpg


EPG articles are not referenced as "sections" but as EPG XXX.X or "articles" to avoid confusion with MoDOT specs (which are contractually binding).

200.1 Construction Inspection Guidance for Grading and Removals

General Preparation and Requirements

This guidance will not only serve to help personnel assigned to grading and removals but, after reviewing the multitude of their duties and responsibilities, will emphasize the importance of their contribution to the quality of the finished product. This information is intended as a guide to uniform administration, inspection and testing procedures on grading and removal work.

Inspector Preparation

It is essential that the inspector have a thorough knowledge of the standard specifications, special provisions and plans. The inspector should study all information available to them regarding the various types of soil. The inspector must be able to relate each soil type to the standards as it is being placed in the embankment.

Daily Documentation

The compaction inspector must keep a diary. The inspector should record weather conditions, condition of material being moved, all activities of the contractor forces, an estimate of quantities completed, any special instructions given the contractor and any other information about the earthwork phase of the work each day. The person making the diary entries must sign them.

Traffic Control Plan

Enforcement of specific safety measures includes requiring all work be properly barricaded and/or signed in accordance with the Traffic Control Plan included in the contract. The plan requires that signs be kept clean, legible, in alignment and in good repair.