Difference between revisions of "Category:208 Interception Ditch"
Jump to navigation
Jump to search
(add new article) |
(No difference)
|
Revision as of 12:28, 25 July 2007
208.1 Construction Inspection Guidance for Sec 208
On projects where erosion is expected to be a serious problem, interception ditches, or levees, or both may be shown on the plans.
Description (Sec 208.1)
As specified.
Construction Requirements (Sec 208.2)
As specified.
Method of Measurement (Sec 208.3)
Measurement of interception ditches is to be made along the flow line of the ditch and recorded in a bound field book.
Basis of Payment (Sec 208.4)
As specified.