Category:212 Subgrading and Shouldering

From Engineering_Policy_Guide
Revision as of 13:16, 25 January 2008 by Smithk (talk | contribs) (article construction)
Jump to navigation Jump to search
212.jpg

This grading item, consisting of two classes, is used only for grading incidental to the construction of pavements on improvements that have been graded under a previous contract. This item is provided in addition to the required item of subgrade compaction. It provides for the fine grading and shaping necessary to complete the finished roadway. The quantity is measured along the centerline of pavement and includes both shoulders. Divided lane improvements require double quantities.

212.1 Subgrading and Shouldering, Class 1

This work consists of preparing the earth subgrade for the surfacing and shoulders by fine grading, and shaping the existing roadbed of a previously graded roadway, and shaping fillslope, foreslope and ditches as required to complete a finished roadway conforming to the typical section.

212.2 Subgrading and Shouldering, Class 2

This item includes all work included in Subgrading and Shouldering, Class 1 and also includes the construction and final shaping of earth shoulders.

212.3 Construction Inspection Guidelines for Sec 212

Description (for Sec 212.1). As specified.

Subgrading and Shouldering, Class 1 (for Sec 212.1.1). As specified.

Subgrading and Shouldering, Class 2 (for Sec 212.1.2). As specified.

Construction Requirements (for Sec 212.2). As specified.

Method of Measurement (for Sec 212.3). As specified.

Basis of Payment (for Sec 212.4). As specified.