Difference between revisions of "Category:407 Tack Coat"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (→‎407.1.5 Method of Measurement (Sec 407.5): Per CM, minor correction. To round gallons to nearest gallon, not nearest 10 gallons)
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
This item is used for impervious surfaces such as portland cement concrete, asphaltic concrete or bituminous surfaces prior to resurfacing. The grade of emulsified asphalt is selected by the contractor.
+
This item is to bond HMA pavement mixtures to an existing roadway surface or between asphalt lifts of newly constructed asphalt pavement.  Adequate bonding between pavement layers is critical in order for the completed pavement structure to behave as a single unit and provide adequate strength.  Inadequate bonding between layers can result in delamination (debonding) followed by longitudinal wheel-path cracking, early fatigue cracking, potholes, slippage cracking, and/or other distresses that greatly reduce the pavement life. Unless otherwise noted in the contract, the grade of emulsified asphalt or Performance Graded binder is selected by the contractor.
  
 
==407.1 Construction Inspection for Sec 407==
 
==407.1 Construction Inspection for Sec 407==
 
===407.1.1 Description (Sec 407.1)===
 
===407.1.1 Description (Sec 407.1)===
The purpose of a tack coat is to improve the bond between the
+
The purpose of a tack coat is to achieve a bond between the existing surface and the mat in order for the pavement to behave as one homogeneous structure.  
existing surface and the mat.
 
  
 
===407.1.2 Material (Sec 407.2)===
 
===407.1.2 Material (Sec 407.2)===
See [[#407.2 Materials Inspection for Sec 407|Materials Inspection]] and [[:Category:1015 Bituminous Material|1015 Bituminous Material]].
+
See [[#407.2 Materials Inspection for Sec 407|Materials Inspection]] and [[:Category:1015 Bituminous Material|EPG 1015 Bituminous Material]].
  
 
===407.1.3 Equipment (Sec 407.3)===
 
===407.1.3 Equipment (Sec 407.3)===
See [[460.4 Paving Equipment|Distributor]] in Paving Equipment.
+
See [[460.4 Paving Equipment|Distributor]] in Paving Equipment. Several distributor equipment adjustments and settings are critical to achieve a uniform tack coat placement. The best practice for uniform coverage is to use a “double or triple lap” coverage which means that every portion of the pavement receives spray from two or three nozzles.  The triple lap coverage is illustrated below:
 +
 
 +
[[image:407.1.3.jpg|center|700px]]
 +
 
 +
Specific guidance for distributor set-up are as follows:
 +
 
 +
:* Nozzle spray patterns should be identical to one another along a distributor spray bar. Differing coverages will result in streaks and gaps in the tack coat.
 +
:* Spray bar height should remain constant. As tack coat is applied, the vehicle will become lighter causing the spray bar to rise. The tack coat application vehicle should be able to compensate for this. Excessively low spray bars result in streaks, while excessively high spray bars cause excessive nozzle overlap resulting in an excessive application rate.
 +
:* Pressure within the distributor must be capable of forcing the tack coat material out the spray nozzles at a constant rate. Inconsistent pressure will result in non-uniform application rates.
 +
:* The target temperature of the tack product within the distributor should be maintained at 120°F.  Care should be taken not to exceed 160°F, or as specified by the manufacturer.  Excessive heating may cause the emulsion to break while still in the distributor.
  
 
===407.1.4 Construction Requirements (Sec 407.4)===
 
===407.1.4 Construction Requirements (Sec 407.4)===
Line 16: Line 24:
  
 
'''Application''' (Sec 407.4.2)
 
'''Application''' (Sec 407.4.2)
If the tack coat is too heavy or too light, an inadequate bond is created and the mat may slip during compaction, which results in shoving and checking. In addition, a slippage failure (cracking) may occur after the pavement has been subjected to traffic. Bleeding may also occur if the tack coat is too heavy.
 
  
The tack coat must be uniformly applied to the existing surface at the rate specified in the
+
The tack coat must be uniformly applied to the existing surface at the rate specified in the contract. The application rate will vary depending on the type and condition of the existing surface.  Generally, the target application rate should follow the surface type as listed in Table 407.1.4.
contract. Generally, the application rate between the existing pavement and the first lift should be in the range of 0.05 to 0.10 gal/yd<sup>2</sup>. It is strongly recommended to apply a light tack coat between each lift of bituminous pavement. The application rate between lifts should be in the range of 0.02 to 0.05 gal/yd<sup>2</sup>.
+
<center>
 +
 
 +
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 +
|+'''Table 407.1.4, Tack Coat Application Rates'''
 +
! style="background:#BEBEBE" |Surface Type!! style="background:#BEBEBE" |Target Application Rate;<br/>Undiluted (gal/yd<sup>2</sup>) !! style="background:#BEBEBE" |Target Application Rate;<br/>20% Diluted (gal/yd<sup>2</sup>)
 +
|-
 +
|New Asphalt Surfaces||0.05|| 0.06
 +
|-
 +
|Existing Asphalt or Concrete Surfaces ||0.08|| 0.10
 +
|-
 +
|Coldmilled Asphalt or Concrete Surfaces|| 0.10|| 0.13
 +
|}
 +
</center>
 +
 
 +
 
 +
Depending on the condition of the existing surface, the application rate may need to be adjusted from the target specified rate. This is acceptable as long as approval is obtained from the RE and the rate is within +/- 0.02 gal/yd<sup>2</sup> of the target application rate as stated above. For example, an open textured surface, such as an SP250 mix, requires more tack than a surface that is tight or dense, such as an SP125 mix. A milled surface requires additional tack because of the increased surface area (from the grooves left by the cutting teeth on the milling machine). A dry, aged pavement also requires a heavier tack coat than a newer pavement. These conditions, and any other possibilities, must be considered when a tack coat is applied.
 +
 
 +
'''Tack Coat Dilution''' 
 +
 
 +
No dilution of tack coat is allowed in the field.  Dilution of tack in the field may result in inaccurate dilution ratios, inadequate mixing of the material, incompatible water sources, or other issues that result in a poor quality product. 
 +
Dilution is permissible if performed and supplied by the manufacturer.  Additional water may be added to slow setting asphalt emulsions and mixed therewith in such a proportion that the resulting mixture will contain no more than 20 percent of added water. 
 +
 
 +
Due to the set-up of some distributor trucks, dilution may be needed to aid in achieving uniform coverage.  In order to maintain the same residual rate as a non-diluted emulsion, a diluted tack coat material shall be applied at a higher rate, as specified in the 20 percent diluted column in the above table.  The increase in application rate needed for dilutions greater than 20 percent are not practical to place, therefore dilution shall not exceed 20 percent.
 +
 
 +
'''Tack Coat Coverage'''
 +
 
 +
Two of the most important aspects of tack coat application are: 1) Achieving good uniform coverage and 2) Preventing the tack coat from tracking off the roadway.
 +
 
 +
'''Uniform Coverage'''
 +
 
 +
With a properly calibrated and maintained distributor; good uniform tack coat coverage should be easily achieved.  Examples of good tack coat coverage are provided in Fig. 407.1.4.1:
 +
 
 +
[[image:407.1.4.1.jpg|center|650px|thumb|<center>'''Fig. 407.1.4.1, Good Tack Coat Coverage'''</center>]]
 +
 
 +
 
 +
Examples of moderate tack coat coverage are provided in Fig. 407.1.4.2.  Although these tack coat applications are still acceptable; the contractor should be advised to make the necessary changes to achieve good tack coat coverage.
 +
 
 +
[[image:407.1.4.2.jpg|center|675px|thumb|<center>'''Fig. 407.1.4.2, Moderate Tack Coat Coverage'''</center>]]
 +
 
 +
 
 +
Examples of unacceptable tack coat coverage are provided in Fig. 407.1.4.3.  These tack coat applications are non-uniform to the point where the bond strength between asphalt lifts will be reduced and will significantly shorten the service life of the asphalt overlay.
 +
 
 +
[[image:407.1.4.3.jpg|center|650px|thumb|<center>'''Fig. 407.1.4.3, Unacceptable Tack Coat Coverage'''</center>]]
 +
 
 +
 
 +
'''Tack Coat Tracking'''
 +
 
 +
Once good uniform tack coat coverage is achieved; the next step is keeping the tack on the roadway without being tracked off by construction equipment.  Shortly after the tack coat has been applied, its color will change from brown to black as the water in the emulsion begins to evaporate, which is referred to as the tack “breaking”.  Once the water has evaporated, the emulsion is said to have “set”. The time required to break and set depends upon the type of emulsion, the application rate, the pavement temperature, and weather conditions.  Under most circumstances, a conventional emulsion will set in about 1 to 2 hours.  Until the emulsion has completely set; there is a risk of the tack coat tracking off the roadway when construction equipment is allowed onto the tacked surface prior to the overlay. 
 +
 
 +
With short work zone requirements, aggressive production rates, and mix quality priorities; tack coat is often ignored and not addressed properly.  It is extremely important that the tack coat remains on the existing surface in order to create an adequate bond between the existing surface and the mat. 
 +
 
 +
The tack coat remaining on the roadway just prior to the paver should be rated as follows:  Low Tracking, Moderate Tracking, and Heavy Tracking. Low tracking is preferred. Moderate tracking may be acceptable for rural areas and divided highways, but not acceptable in urban locations or locations with multiple entrances. Moderate tracking would also not be acceptable where it poses a safety risk to the travelling public by reducing surface friction on adjacent lanes or roadways and/or reduces visibility of roadway paint markings. For locations where no tracking or low tracking is needed; a Job Special Provision should be specified in the contract. Examples of Low Tracking, Moderate Tracking and Heavy Tracking are shown in Figures 407.1.4.4.1 through 407.1.4.6.4.
 +
 
 +
 
 +
 
 +
{| style="margin: 1em auto 1em auto"
 +
|-
 +
|[[image:407.1.4.4.1.jpg|center|350px|thumb|<center>'''Fig. 407.1.4.4.1'''</center>]]
 +
||[[image:407.1.4.4.2.jpg|center|350px|thumb|<center>'''Fig. 407.1.4.4.2'''</center>]]
 +
|-
 +
|[[image:407.1.4.4.3.jpg|center|350px|thumb|<center>'''Fig. 407.1.4.4.3'''</center>]]||[[image:407.1.4.4.4.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.4.4'''</center>]]
 +
|-
 +
|colspan="2"|[[image:407.1.4.4.5.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.4.5'''</center>]]
 +
|-
 +
|colspan="2"|<center>'''Figs. 407.1.4.4.1 through 407.1.4.4.5, Examples of Low Tracking (preferred condition)'''</center>
 +
|}
 +
 
  
Depending on the condition of the existing surface, the application rate may need to be adjusted from the specified rate. This is acceptable as long as approval is obtained from the RE
+
{| style="margin: 1em auto 1em auto"
and the rate is within the applicable range mentioned above. For example, an open textured surface, such as an SP250 mix, requires more tack than a surface that is tight or dense, such as an SP125 mix. A milled surface requires additional tack because of the increased surface area (from the grooves left by the cutting teeth on the milling machine). A dry, aged pavement also requires a heavier tack coat than a newer pavement. These conditions, and any other possibilities, must be considered when a tack coat is applied.
+
|-
 +
|[[image:407.1.4.5.1.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.5.1'''</center>]]
 +
||[[image:407.1.4.5.2.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.5.2'''</center>]]
 +
|-
 +
|colspan="2"|[[image:407.1.4.5.3.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.5.3'''</center>]]
 +
|-
 +
|colspan="2"|<center>'''Figs. 407.1.4.5.1 through 407.1.4.5.3, Examples of Moderate Tracking '''</center>
 +
|}
  
There is no requirement governing the overlap of a tack coat. However, the best results
 
are generally obtained with a double or triple lap. Therefore, the height of the spray bar on the distributor should be adjusted accordingly.
 
  
The tack coat must be allowed to break (cure) prior to spreading mix. Shortly after the tack coat has been applied, its color will change from brown to black as the water in the emulsion
+
{| style="margin: 1em auto 1em auto"
begins to evaporate. The emulsion also becomes “tacky” to the touch. The amount of time it takes for the tack coat to break depends on the type and grade of emulsion used, the application
+
|-
rate, the temperature of the existing surface, and the environmental conditions. The tack coat is said to have “set” once all of the water in the emulsion has evaporated. Typically, an emulsion sets in 1 to 2 hours.
+
|[[image:407.1.4.6.1.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.6.1'''</center>]]
 +
||[[image:407.1.4.6.2.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.6.2'''</center>]]
 +
|-
 +
|[[image:407.1.4.6.3.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.6.3'''</center>]]||[[image:407.1.4.6.4.jpg|center|375px|thumb|<center>'''Fig. 407.1.4.6.4'''</center>]]
 +
|-
 +
|colspan="2"|<center>'''Figs. 407.1.4.6.1 through 407.1.4.6.4, Examples of Heavey/Unacceptable Tracking'''</center>
 +
|}
  
If there is reason to believe that the tack coat is being diluted with a material other than
 
water or that the dilution rate is other than what has been reported, a sample should be taken and shipped to the Central Laboratory.
 
  
:'''Tack''' (Sec 407.4.2.1)
+
When heavy tracking occurs, paving operations should be stopped and the heavy track-off issues resolved prior to resuming paving. At a minimum, the tack coat should be re-applied just prior to the paver, at no additional cost to the Commission.
:It is extremely important that the tack coat remains on the existing surface in order to create an adequate bond between the existing surface and the mat. Usually, tack is only applied within the length of the lane drop. The tack coat should be allowed to set before it is subjected to construction traffic. Otherwise, the vehicle tires will pick up the tack. At the very least, the amount of construction traffic, including haul trucks, should be minimized.
 
  
:The tacked surface should be covered with mix the same day. If this is not possible because of equipment problems (plant or paver breakdowns), sand must be lightly distributed over the tacked surface before opening to traffic. This will “blot” the tack, preventing it from being picked up by the traffic, and provide friction to the surface. When paving resumes, the excess sand must be removed before the mix is spread.
+
'''Resolving heavy track-off issues'''
 +
 
 +
There are many ways to address heavy track-off issues with tack coat.  The following  items are listed to give guidance on possible solution to the tracking issues:
 +
 
 +
:* Review the timing of distributor and paving sequence.  Usually it is better to apply the tack coat as far in advance of the paver as possible to give the tack an opportunity to set.  However, in some instances, it is best to apply the tack coat as close to the paver as possible.  The less trucks backing on the tack the better result in keeping the tack on the roadway.
 +
:* Check the spray temperature of the emulsion.  Heat the emulsion to a maximum temperature of 160º F for spray application.  The higher temperature of the tack product should result in quicker set time and reduce tracking.
 +
:* Apply soap solution to the tires of the construction equipment.  In some cases, the application of soap has been known to reduce the tack pick-up from tires.
 +
:* Pre-wet the surface in accordance with [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=7 Sec 407].  Pre-wetting the surface prior to tack application has been theorized to break the surface charge and cause the tack coat to flow and adhere to the surface better to reduce tracking.
 +
 
 +
If all of the above items are conducted with further heavy track off; then the contractor needs to either wait until the tack is completely set, change emulsion types or use a spray paver.   
 +
 
 +
The tacked surface should be covered with mix the same day. If this is not possible because of equipment problems (plant or paver breakdowns), sand must be lightly distributed over the tacked surface before opening to traffic. This will “blot” the tack, preventing it from being picked up by the traffic, and provide friction to the surface. When paving resumes, the excess sand must be removed and the surface re-tacked before the mix is spread.
  
 
===407.1.5 Method of Measurement (Sec 407.5)===
 
===407.1.5 Method of Measurement (Sec 407.5)===
The quantity of emulsion to be paid for will be determined in accordance with [http://www.modot.state.mo.us/business/standards_and_specs/Sec1015.pdf Standard Specification Section 1015.7.2] and rounded to the nearest 10 gallons. The following equation
+
The quantity of emulsion to be paid for will be determined in accordance with [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Standard Specification Section 1015.6] and rounded to the nearest whole gallon. For volumetric determination, the following equation should be used:
should be used:
 
  
 
:<math>G_c=\frac{(G_b-G_e)\times(1-C)}{((T-60)\times0.0003)+1}</math>
 
:<math>G_c=\frac{(G_b-G_e)\times(1-C)}{((T-60)\times0.0003)+1}</math>
Line 50: Line 141:
 
:G<sub>e</sub> = ending gallons
 
:G<sub>e</sub> = ending gallons
 
:C = dilution rate
 
:C = dilution rate
:T = application temperature
+
:T = application temperature in Fahrenheit
  
 
'''Example'''
 
'''Example'''
Line 57: Line 148:
 
:<math>G_c=\frac{(1675-1450)\times(1-0.00)}{((125-60)\times0.0003)+1}</math>
 
:<math>G_c=\frac{(1675-1450)\times(1-0.00)}{((125-60)\times0.0003)+1}</math>
 
:G<sub>c</sub>=220.7 Gallons
 
:G<sub>c</sub>=220.7 Gallons
:G<sub>c</sub>=220 Gallons
+
:G<sub>c</sub>=221 Gallons
  
Now suppose that the emulsion is being cut by 30% with water (C = 0.30). Therefore:
+
Now suppose that the emulsion is being cut by 20% with water (C = 0.20). Therefore:
  
:<math>G_c=\frac{(1675-1450)\times(1-0.30)}{((125-60)\times0.0003)+1}</math>
+
:<math>G_c=\frac{(1675-1450)\times(1-0.20)}{((125-60)\times0.0003)+1}</math>
  
:G<sub>c</sub>=154.5 Gallons
+
:G<sub>c</sub>=176.6 Gallons
:G<sub>c</sub>=150 Gallons
+
:G<sub>c</sub>=177 Gallons
  
 
==407.2 Materials Inspection for Sec 407==
 
==407.2 Materials Inspection for Sec 407==
  
Tack Coat material shall be sampled and inspected in accordance with [[:Category:1015 Bituminous Material|1015 Bituminous Material]].
+
Tack Coat material shall be sampled and inspected in accordance with [[:Category:1015 Bituminous Material|EPG 1015 Bituminous Material]].
 +
 
 +
==407.3 Maintenance Tacking or Tack Coating==
 +
Maintenance uses tacking or tack-coating by applying a light spray application of cutback or emulsified asphalt to impervious surfaces such as Portland cement concrete, asphaltic concrete, or bituminous surfaces prior to resurfacing.
 +
 
 +
===407.3.1 Purpose===
 +
The purpose of the tack coat is to improve the bond between the existing surface and the roadway pavement. A tack coat shall be applied to provide a bond between old and new wearing courses. The best results occur when the tack is applied to a dry and clean surface, free of loose material.
 +
 
 +
===407.3.2 Application Rates===
 +
The application rate will vary from 0.05 to 0.15 gal/yd<sup>2</sup>, depending on the condition of the old pavement surface. The pavement course surface should be evaluated to determine the amount of tack to be applied. A viscous material should be used because very little penetration of the asphaltic oil into the pavement surface is expected. The tack coat should be allowed to become tacky or sticky before the surface course is laid. Emulsions are recommended for tacking on heavily traveled routes. Too much tack can create a slippage plane between the old pavement and the new pavement overlay as the tack coat acts as a lubricant instead of an adhesive. Also too much tack could result in bleeding of the tack through to the new overlay surface, which can produce a slick pavement condition. After application of the tack, time must be allowed for the tack to break. Breaking is the phenomenon when the asphalt and water in the emulsion separate, beginning the curing process (brown to black color). Traffic should be kept off the tacked area.
 +
 
 +
===407.3.3 Products===
 +
Asphalt emulsions commonly used for tack coats areSS-1, CSS-1, SS-1h and CSS-1h.  Polymers are allowed to be added to any emulsion which give benefits to both bond strength and achieving mat density by keeping the material from moving under the vibratory compactor. Hard penetration asphalt emulsions are also allowed in accordance with Sec 1015. Refer to [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=7 Standard Specification Section 407] for additional information regarding tack coats.

Latest revision as of 07:13, 31 August 2016

This item is to bond HMA pavement mixtures to an existing roadway surface or between asphalt lifts of newly constructed asphalt pavement. Adequate bonding between pavement layers is critical in order for the completed pavement structure to behave as a single unit and provide adequate strength. Inadequate bonding between layers can result in delamination (debonding) followed by longitudinal wheel-path cracking, early fatigue cracking, potholes, slippage cracking, and/or other distresses that greatly reduce the pavement life. Unless otherwise noted in the contract, the grade of emulsified asphalt or Performance Graded binder is selected by the contractor.

407.1 Construction Inspection for Sec 407

407.1.1 Description (Sec 407.1)

The purpose of a tack coat is to achieve a bond between the existing surface and the mat in order for the pavement to behave as one homogeneous structure.

407.1.2 Material (Sec 407.2)

See Materials Inspection and EPG 1015 Bituminous Material.

407.1.3 Equipment (Sec 407.3)

See Distributor in Paving Equipment. Several distributor equipment adjustments and settings are critical to achieve a uniform tack coat placement. The best practice for uniform coverage is to use a “double or triple lap” coverage which means that every portion of the pavement receives spray from two or three nozzles. The triple lap coverage is illustrated below:

407.1.3.jpg

Specific guidance for distributor set-up are as follows:

  • Nozzle spray patterns should be identical to one another along a distributor spray bar. Differing coverages will result in streaks and gaps in the tack coat.
  • Spray bar height should remain constant. As tack coat is applied, the vehicle will become lighter causing the spray bar to rise. The tack coat application vehicle should be able to compensate for this. Excessively low spray bars result in streaks, while excessively high spray bars cause excessive nozzle overlap resulting in an excessive application rate.
  • Pressure within the distributor must be capable of forcing the tack coat material out the spray nozzles at a constant rate. Inconsistent pressure will result in non-uniform application rates.
  • The target temperature of the tack product within the distributor should be maintained at 120°F. Care should be taken not to exceed 160°F, or as specified by the manufacturer. Excessive heating may cause the emulsion to break while still in the distributor.

407.1.4 Construction Requirements (Sec 407.4)

See Spreading in Paving Operations.

Application (Sec 407.4.2)

The tack coat must be uniformly applied to the existing surface at the rate specified in the contract. The application rate will vary depending on the type and condition of the existing surface. Generally, the target application rate should follow the surface type as listed in Table 407.1.4.

Table 407.1.4, Tack Coat Application Rates
Surface Type Target Application Rate;
Undiluted (gal/yd2)
Target Application Rate;
20% Diluted (gal/yd2)
New Asphalt Surfaces 0.05 0.06
Existing Asphalt or Concrete Surfaces 0.08 0.10
Coldmilled Asphalt or Concrete Surfaces 0.10 0.13


Depending on the condition of the existing surface, the application rate may need to be adjusted from the target specified rate. This is acceptable as long as approval is obtained from the RE and the rate is within +/- 0.02 gal/yd2 of the target application rate as stated above. For example, an open textured surface, such as an SP250 mix, requires more tack than a surface that is tight or dense, such as an SP125 mix. A milled surface requires additional tack because of the increased surface area (from the grooves left by the cutting teeth on the milling machine). A dry, aged pavement also requires a heavier tack coat than a newer pavement. These conditions, and any other possibilities, must be considered when a tack coat is applied.

Tack Coat Dilution

No dilution of tack coat is allowed in the field. Dilution of tack in the field may result in inaccurate dilution ratios, inadequate mixing of the material, incompatible water sources, or other issues that result in a poor quality product. Dilution is permissible if performed and supplied by the manufacturer. Additional water may be added to slow setting asphalt emulsions and mixed therewith in such a proportion that the resulting mixture will contain no more than 20 percent of added water.

Due to the set-up of some distributor trucks, dilution may be needed to aid in achieving uniform coverage. In order to maintain the same residual rate as a non-diluted emulsion, a diluted tack coat material shall be applied at a higher rate, as specified in the 20 percent diluted column in the above table. The increase in application rate needed for dilutions greater than 20 percent are not practical to place, therefore dilution shall not exceed 20 percent.

Tack Coat Coverage

Two of the most important aspects of tack coat application are: 1) Achieving good uniform coverage and 2) Preventing the tack coat from tracking off the roadway.

Uniform Coverage

With a properly calibrated and maintained distributor; good uniform tack coat coverage should be easily achieved. Examples of good tack coat coverage are provided in Fig. 407.1.4.1:

Fig. 407.1.4.1, Good Tack Coat Coverage


Examples of moderate tack coat coverage are provided in Fig. 407.1.4.2. Although these tack coat applications are still acceptable; the contractor should be advised to make the necessary changes to achieve good tack coat coverage.

Fig. 407.1.4.2, Moderate Tack Coat Coverage


Examples of unacceptable tack coat coverage are provided in Fig. 407.1.4.3. These tack coat applications are non-uniform to the point where the bond strength between asphalt lifts will be reduced and will significantly shorten the service life of the asphalt overlay.

Fig. 407.1.4.3, Unacceptable Tack Coat Coverage


Tack Coat Tracking

Once good uniform tack coat coverage is achieved; the next step is keeping the tack on the roadway without being tracked off by construction equipment. Shortly after the tack coat has been applied, its color will change from brown to black as the water in the emulsion begins to evaporate, which is referred to as the tack “breaking”. Once the water has evaporated, the emulsion is said to have “set”. The time required to break and set depends upon the type of emulsion, the application rate, the pavement temperature, and weather conditions. Under most circumstances, a conventional emulsion will set in about 1 to 2 hours. Until the emulsion has completely set; there is a risk of the tack coat tracking off the roadway when construction equipment is allowed onto the tacked surface prior to the overlay.

With short work zone requirements, aggressive production rates, and mix quality priorities; tack coat is often ignored and not addressed properly. It is extremely important that the tack coat remains on the existing surface in order to create an adequate bond between the existing surface and the mat.

The tack coat remaining on the roadway just prior to the paver should be rated as follows: Low Tracking, Moderate Tracking, and Heavy Tracking. Low tracking is preferred. Moderate tracking may be acceptable for rural areas and divided highways, but not acceptable in urban locations or locations with multiple entrances. Moderate tracking would also not be acceptable where it poses a safety risk to the travelling public by reducing surface friction on adjacent lanes or roadways and/or reduces visibility of roadway paint markings. For locations where no tracking or low tracking is needed; a Job Special Provision should be specified in the contract. Examples of Low Tracking, Moderate Tracking and Heavy Tracking are shown in Figures 407.1.4.4.1 through 407.1.4.6.4.


Fig. 407.1.4.4.1
Fig. 407.1.4.4.2
Fig. 407.1.4.4.3
Fig. 407.1.4.4.4
Fig. 407.1.4.4.5
Figs. 407.1.4.4.1 through 407.1.4.4.5, Examples of Low Tracking (preferred condition)


Fig. 407.1.4.5.1
Fig. 407.1.4.5.2
Fig. 407.1.4.5.3
Figs. 407.1.4.5.1 through 407.1.4.5.3, Examples of Moderate Tracking


Fig. 407.1.4.6.1
Fig. 407.1.4.6.2
Fig. 407.1.4.6.3
Fig. 407.1.4.6.4
Figs. 407.1.4.6.1 through 407.1.4.6.4, Examples of Heavey/Unacceptable Tracking


When heavy tracking occurs, paving operations should be stopped and the heavy track-off issues resolved prior to resuming paving. At a minimum, the tack coat should be re-applied just prior to the paver, at no additional cost to the Commission.

Resolving heavy track-off issues

There are many ways to address heavy track-off issues with tack coat. The following items are listed to give guidance on possible solution to the tracking issues:

  • Review the timing of distributor and paving sequence. Usually it is better to apply the tack coat as far in advance of the paver as possible to give the tack an opportunity to set. However, in some instances, it is best to apply the tack coat as close to the paver as possible. The less trucks backing on the tack the better result in keeping the tack on the roadway.
  • Check the spray temperature of the emulsion. Heat the emulsion to a maximum temperature of 160º F for spray application. The higher temperature of the tack product should result in quicker set time and reduce tracking.
  • Apply soap solution to the tires of the construction equipment. In some cases, the application of soap has been known to reduce the tack pick-up from tires.
  • Pre-wet the surface in accordance with Sec 407. Pre-wetting the surface prior to tack application has been theorized to break the surface charge and cause the tack coat to flow and adhere to the surface better to reduce tracking.

If all of the above items are conducted with further heavy track off; then the contractor needs to either wait until the tack is completely set, change emulsion types or use a spray paver.

The tacked surface should be covered with mix the same day. If this is not possible because of equipment problems (plant or paver breakdowns), sand must be lightly distributed over the tacked surface before opening to traffic. This will “blot” the tack, preventing it from being picked up by the traffic, and provide friction to the surface. When paving resumes, the excess sand must be removed and the surface re-tacked before the mix is spread.

407.1.5 Method of Measurement (Sec 407.5)

The quantity of emulsion to be paid for will be determined in accordance with Standard Specification Section 1015.6 and rounded to the nearest whole gallon. For volumetric determination, the following equation should be used:

Where:
Gc = corrected gallons at 60°F
Gb = beginning gallons
Ge = ending gallons
C = dilution rate
T = application temperature in Fahrenheit

Example At the beginning of the day, the tank contains 1675 gallons of emulsion. At the end of the day, the tank contains 1450 gallons of emulsion. The application temperature of the emulsion is 125°F. Water is not being used to cut the emulsion (C = 0.00). Therefore:

Gc=220.7 Gallons
Gc=221 Gallons

Now suppose that the emulsion is being cut by 20% with water (C = 0.20). Therefore:

Gc=176.6 Gallons
Gc=177 Gallons

407.2 Materials Inspection for Sec 407

Tack Coat material shall be sampled and inspected in accordance with EPG 1015 Bituminous Material.

407.3 Maintenance Tacking or Tack Coating

Maintenance uses tacking or tack-coating by applying a light spray application of cutback or emulsified asphalt to impervious surfaces such as Portland cement concrete, asphaltic concrete, or bituminous surfaces prior to resurfacing.

407.3.1 Purpose

The purpose of the tack coat is to improve the bond between the existing surface and the roadway pavement. A tack coat shall be applied to provide a bond between old and new wearing courses. The best results occur when the tack is applied to a dry and clean surface, free of loose material.

407.3.2 Application Rates

The application rate will vary from 0.05 to 0.15 gal/yd2, depending on the condition of the old pavement surface. The pavement course surface should be evaluated to determine the amount of tack to be applied. A viscous material should be used because very little penetration of the asphaltic oil into the pavement surface is expected. The tack coat should be allowed to become tacky or sticky before the surface course is laid. Emulsions are recommended for tacking on heavily traveled routes. Too much tack can create a slippage plane between the old pavement and the new pavement overlay as the tack coat acts as a lubricant instead of an adhesive. Also too much tack could result in bleeding of the tack through to the new overlay surface, which can produce a slick pavement condition. After application of the tack, time must be allowed for the tack to break. Breaking is the phenomenon when the asphalt and water in the emulsion separate, beginning the curing process (brown to black color). Traffic should be kept off the tacked area.

407.3.3 Products

Asphalt emulsions commonly used for tack coats areSS-1, CSS-1, SS-1h and CSS-1h. Polymers are allowed to be added to any emulsion which give benefits to both bond strength and achieving mat density by keeping the material from moving under the vibratory compactor. Hard penetration asphalt emulsions are also allowed in accordance with Sec 1015. Refer to Standard Specification Section 407 for additional information regarding tack coats.