Difference between revisions of "Category:460 General Requirements for Bituminous Construction"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (adjust width of "Forms" box to uncover articles named in category)
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
The General Requirements for Bituminous Construction is to guide the bituminous plant and roadway inspectors in the inspection of construction of various types of hot mix asphalt pavements. This section contains information common to all bituminous specification sections. However, this is not a contract document and is to be used solely as a commentary on the Standard Specifications.
+
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="300px" align="right"
 +
|- 
 +
|'''Forms'''
 +
|-
 +
|[[Media:460 Form Scale Balance & Sensitivity Check Record.doc|Scale Balance & Sensitivity Check Record]]
 +
|-
 +
|[[Media:460 Form Mineral Filler Record.doc|Mineral Filler Record]]
 +
|-
 +
|[[Media:460 Form Hydrated Lime Record.doc|Hydrated Lime Record]]
 +
|-
 +
|[[Media:460 Form Binder Record.doc|Binder Record]]
 +
|-
 +
|[[Media:460 Form Bin Percentages and Scale Settings.doc|Bin Percentages and Scale Settings]]
 +
|-
 +
|[[Media:460 Form Asphalt Roadway Report.doc|Asphalt Roadway Report]]
 +
|-
 +
|[[Media:403 Form Profilograph Report.doc|Profilograph Report]]
 +
|-
 +
|[[Media:403 Form QAQC Project Checklist.doc|QAQC Project Checklist]]
 +
|-
 +
|'''Figures'''
 +
|-
 +
|[[Media:403 Appropriate Use of Self Tests.pdf|Appropriate Use of Self Tests]]
 +
|-
 +
|[[Media:403 Figure Consensus Testing.pdf|Consensus Testing]]
 +
|-
 +
|[[Media:403 QAQC Questions and Answers.pdf|QAQC Questions and Answers]]
 +
|-
 +
|[[Media:460 Figure Superpave Lessons Learned (Segregation).pdf|Superpave Lessons Learned (Segregation)]]
 +
|}
 +
 
 +
The General Requirements for Bituminous Construction is to guide the bituminous plant and roadway inspectors in the inspection of construction of various types of hot mix asphalt pavements. These articles contain information common to all bituminous specification sections. However, this is not a contract document and is to be used solely as a commentary on the Standard Specifications.
  
 
It is the inspector’s responsibility to assure that all contract requirements are met. The
 
It is the inspector’s responsibility to assure that all contract requirements are met. The
 
inspectors will be familiar with the Standard Specifications and all contract documents. It is the contractor’s responsibility to produce an acceptable product that meets the requirements of the contract. Each should recognize and respect the position of the other. Maintain, within the framework of these instructions, an attitude of cooperation and professionalism toward the contractor. Do not delay operations unnecessarily. Continuous paving operations are desirable for both the quality of the product and the contractor’s production. The plant and roadway inspectors are directly responsible to the Resident Engineer (RE). Any misunderstandings that the inspector cannot readily resolve should be promptly brought to the RE’s attention. The plant inspector and roadway inspector should keep in close contact with each other.
 
inspectors will be familiar with the Standard Specifications and all contract documents. It is the contractor’s responsibility to produce an acceptable product that meets the requirements of the contract. Each should recognize and respect the position of the other. Maintain, within the framework of these instructions, an attitude of cooperation and professionalism toward the contractor. Do not delay operations unnecessarily. Continuous paving operations are desirable for both the quality of the product and the contractor’s production. The plant and roadway inspectors are directly responsible to the Resident Engineer (RE). Any misunderstandings that the inspector cannot readily resolve should be promptly brought to the RE’s attention. The plant inspector and roadway inspector should keep in close contact with each other.

Revision as of 11:27, 19 November 2008

Forms
Scale Balance & Sensitivity Check Record
Mineral Filler Record
Hydrated Lime Record
Binder Record
Bin Percentages and Scale Settings
Asphalt Roadway Report
Profilograph Report
QAQC Project Checklist
Figures
Appropriate Use of Self Tests
Consensus Testing
QAQC Questions and Answers
Superpave Lessons Learned (Segregation)

The General Requirements for Bituminous Construction is to guide the bituminous plant and roadway inspectors in the inspection of construction of various types of hot mix asphalt pavements. These articles contain information common to all bituminous specification sections. However, this is not a contract document and is to be used solely as a commentary on the Standard Specifications.

It is the inspector’s responsibility to assure that all contract requirements are met. The inspectors will be familiar with the Standard Specifications and all contract documents. It is the contractor’s responsibility to produce an acceptable product that meets the requirements of the contract. Each should recognize and respect the position of the other. Maintain, within the framework of these instructions, an attitude of cooperation and professionalism toward the contractor. Do not delay operations unnecessarily. Continuous paving operations are desirable for both the quality of the product and the contractor’s production. The plant and roadway inspectors are directly responsible to the Resident Engineer (RE). Any misunderstandings that the inspector cannot readily resolve should be promptly brought to the RE’s attention. The plant inspector and roadway inspector should keep in close contact with each other.

Articles in "460 General Requirements for Bituminous Construction"

The following 6 pages are in this category, out of 6 total.