==732.1 Construction Inspection for [http://modot.mo.gov/business/standards_and_specs/Sec0732.pdf Sec 732]==
+
==732.1 Construction Inspection for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=11 Sec 732]==
 
Flared end sections are either concrete or metal as required. These items will be inspected by the Division of Construction and Materials and an inspection report will be issued. These items should be installed and backfilled in the same manner required for the pipe. These items are paid for on a per each basis and the inspector should record in a field book when they were installed. A record should be made as to which type of toe wall was used. These entries should be signed by the inspector making them.
 
Flared end sections are either concrete or metal as required. These items will be inspected by the Division of Construction and Materials and an inspection report will be issued. These items should be installed and backfilled in the same manner required for the pipe. These items are paid for on a per each basis and the inspector should record in a field book when they were installed. A record should be made as to which type of toe wall was used. These entries should be signed by the inspector making them.
  
 
==732.2 Material Inspection and Laboratory Testing for Sec 732==
 
==732.2 Material Inspection and Laboratory Testing for Sec 732==
See [http://modot.mo.gov/business/standards_and_specs/Sec1020.pdf Sec 1020] for metal and [http://modot.mo.gov/business/standards_and_specs/Sec1032.pdf Sec 1032] for concrete.
+
See [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1020] for metal and [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1032] for concrete.

Revision as of 15:05, 13 June 2016

732.1 Construction Inspection for Sec 732

Flared end sections are either concrete or metal as required. These items will be inspected by the Division of Construction and Materials and an inspection report will be issued. These items should be installed and backfilled in the same manner required for the pipe. These items are paid for on a per each basis and the inspector should record in a field book when they were installed. A record should be made as to which type of toe wall was used. These entries should be signed by the inspector making them.

732.2 Material Inspection and Laboratory Testing for Sec 732

See Sec 1020 for metal and Sec 1032 for concrete.