https://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&feed=atom&action=historyCategory:772 Bridge Inspections - Revision history2024-03-28T10:56:27ZRevision history for this page on the wikiMediaWiki 1.33.1https://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=51641&oldid=prevSmithk: updated link2022-06-22T13:58:23Z<p>updated link</p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 13:58, 22 June 2022</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l27" >Line 27:</td>
<td colspan="2" class="diff-lineno">Line 27:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [<del class="diffchange diffchange-inline">http</del>:<del class="diffchange diffchange-inline">//tmshome </del>TMS]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [<ins class="diffchange diffchange-inline">[</ins>:<ins class="diffchange diffchange-inline">Category:145 Transportation Management Systems (TMS)|</ins>TMS<ins class="diffchange diffchange-inline">]</ins>]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office bridge maintenance inspection crews shall be responsible for performing these inspections within the specified time interval.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office bridge maintenance inspection crews shall be responsible for performing these inspections within the specified time interval.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div></td></tr>
</table>Smithkhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=48155&oldid=prevSmithk at 19:59, 18 August 20202020-08-18T19:59:07Z<p></p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 19:59, 18 August 2020</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l9" >Line 9:</td>
<td colspan="2" class="diff-lineno">Line 9:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|[http://library.modot.mo.gov/RDT/reports/Ri06038/or10007.pdf Development of Hand-held Thermographic Inspection Technologies]</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|[http://library.modot.mo.gov/RDT/reports/Ri06038/or10007.pdf Development of Hand-held Thermographic Inspection Technologies]</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|-</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|-</div></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>|'''See also:''' [<del class="diffchange diffchange-inline">http</del>://www.modot.<del class="diffchange diffchange-inline">gov</del>/<del class="diffchange diffchange-inline">services/OR/byDate.htm Innovation Library</del>]</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>|'''See also:''' [<ins class="diffchange diffchange-inline">https</ins>://www.modot.<ins class="diffchange diffchange-inline">org</ins>/<ins class="diffchange diffchange-inline">research-publications Research Publications</ins>]</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|}</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|}</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:</div></td></tr>
</table>Smithkhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=25256&oldid=prevSmithk: Per Organizational Results, links to reports added2011-03-08T14:00:52Z<p>Per Organizational Results, links to reports added</p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 14:00, 8 March 2011</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l4" >Line 4:</td>
<td colspan="2" class="diff-lineno">Line 4:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|-</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|-</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|[http://library.modot.mo.gov/RDT/reports/Ri98001/RDT01012.pdf Report 2001]</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|[http://library.modot.mo.gov/RDT/reports/Ri98001/RDT01012.pdf Report 2001]</div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|-</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|'''Thermographic Inspection'''</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|-</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|[http://library.modot.mo.gov/RDT/reports/Ri06038/or10007.pdf Development of Hand-held Thermographic Inspection Technologies]</ins></div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|-</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|-</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|'''See also:''' [http://www.modot.gov/services/OR/byDate.htm Innovation Library]</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|'''See also:''' [http://www.modot.gov/services/OR/byDate.htm Innovation Library]</div></td></tr>
</table>Smithkhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=21040&oldid=prevSmithk: article construction2009-08-17T12:34:38Z<p>article construction</p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 12:34, 17 August 2009</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l23" >Line 23:</td>
<td colspan="2" class="diff-lineno">Line 23:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [<del class="diffchange diffchange-inline">[</del>TMS<del class="diffchange diffchange-inline">]</del>]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [<ins class="diffchange diffchange-inline">http://tmshome </ins>TMS]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office bridge maintenance inspection crews shall be responsible for performing these inspections within the specified time interval.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office bridge maintenance inspection crews shall be responsible for performing these inspections within the specified time interval.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div></td></tr>
</table>Smithkhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=20065&oldid=prevTschid: Added Links to Innovation Library.2009-04-07T16:11:31Z<p>Added Links to Innovation Library.</p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 16:11, 7 April 2009</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1" >Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right" </ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|-</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|'''Bridge Deck Condition, Ground Penetrating Radar'''</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|-</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|[http://library.modot.mo.gov/RDT/reports/Ri98001/RDT01012.pdf Report 2001]</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|-</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|'''See also:''' [http://www.modot.gov/services/OR/byDate.htm Innovation Library]</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">|}</ins></div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
</table>Tschidhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=19162&oldid=prevTschid: Rewording of bridge inspection frequency.2008-11-25T20:26:46Z<p>Rewording of bridge inspection frequency.</p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 20:26, 25 November 2008</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1" >Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>1. <del class="diffchange diffchange-inline">Structures </del>in poor or worse condition (condition 4 rating or less) <del class="diffchange diffchange-inline">for items 58, 59, 60, or 62 on the [[bridge inspection rating form]]</del>.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>1. <ins class="diffchange diffchange-inline">Span-type bridges with the deck, superstructure or substructure rated </ins>in poor or worse condition (condition 4 rating or less).</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>2. Structures with timber structural members (sub-structural, super-structural, or decks) that are not included in the other criteria.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>2<ins class="diffchange diffchange-inline">. Culvert-type bridges rated in poor or worse condition (condition 4 rating or less).</ins></div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div> </div></td></tr>
<tr><td colspan="2"> </td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins class="diffchange diffchange-inline">3</ins>. Structures with timber structural members (sub-structural, super-structural, or decks) that are not included in the other criteria.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The bridge inspection frequency for a particular structure can be set at time intervals ranging from monthly to every six months if the bridge inspection staff feel that additional monitoring of the structure is required to ensure the safety of the traveling public.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The bridge inspection frequency for a particular structure can be set at time intervals ranging from monthly to every six months if the bridge inspection staff feel that additional monitoring of the structure is required to ensure the safety of the traveling public.</div></td></tr>
</table>Tschidhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=19031&oldid=prevTschid: Revisions more accurately reflect organizational structure.2008-11-18T16:19:56Z<p>Revisions more accurately reflect organizational structure.</p>
<table class="diff diff-contentalign-left" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #222; text-align: center;">Revision as of 16:19, 18 November 2008</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l5" >Line 5:</td>
<td colspan="2" class="diff-lineno">Line 5:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>2. Structures with timber structural members (sub-structural, super-structural, or decks) that are not included in the other criteria.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>2. Structures with timber structural members (sub-structural, super-structural, or decks) that are not included in the other criteria.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>The bridge inspection frequency for a particular structure can be set at time intervals ranging from monthly to every six months if the bridge inspection staff feel that additional monitoring of the structure is required to <del class="diffchange diffchange-inline">insure </del>the safety of the traveling public.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>The bridge inspection frequency for a particular structure can be set at time intervals ranging from monthly to every six months if the bridge inspection staff feel that additional monitoring of the structure is required to <ins class="diffchange diffchange-inline">ensure </ins>the safety of the traveling public.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del class="diffchange diffchange-inline">District's 4, 6, and 8 have personnel in the districts to conduct these </del>inspections<del class="diffchange diffchange-inline">. The remaining districts </del>will be <del class="diffchange diffchange-inline">inspected </del>by <del class="diffchange diffchange-inline">Maintenance Division </del>Bridge <del class="diffchange diffchange-inline">Maintenance personnel</del>, with the assistance of district personnel knowledgeable in maintenance and bridges. Bridge-like structures less than 20 ft. - 00 in. shall be the responsibility of the district to inspect and maintain. Maintenance charges for these structures shall be charged to the roadway.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins class="diffchange diffchange-inline">These </ins>inspections will <ins class="diffchange diffchange-inline">primarily </ins>be <ins class="diffchange diffchange-inline">performed </ins>by <ins class="diffchange diffchange-inline">a team comprised of the District </ins>Bridge <ins class="diffchange diffchange-inline">Engineer over the region and a Central Office bridge maintenance inspector. In some cases</ins>, <ins class="diffchange diffchange-inline">either one of these may conduct inspections </ins>with the assistance of district personnel knowledgeable in maintenance and bridges. Bridge-like structures less than 20 ft. - 00 in. shall be the responsibility of the district to inspect and maintain. Maintenance charges for these structures shall be charged to the roadway.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>Bridges jointly maintained with neighboring states shall be inspected in accordance with the "Maintenance Agreements" in effect. The inspection will be done by representatives from Missouri (from both the district and Central Office<del class="diffchange diffchange-inline">, Maintenance Division, Bridge Maintenance Section</del>) and representatives from the neighboring state.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>Bridges jointly maintained with neighboring states shall be inspected in accordance with the "Maintenance Agreements" in effect. The inspection will be done by representatives from Missouri (from both the district and Central Office <ins class="diffchange diffchange-inline">bridge maintenance</ins>) and representatives from the neighboring state.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l15" >Line 15:</td>
<td colspan="2" class="diff-lineno">Line 15:</td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [[TMS]]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [[TMS]]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"></td></tr>
<tr><td class='diff-marker'>−</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office<del class="diffchange diffchange-inline">, Bridge Maintenance Section </del>inspection crews shall be responsible for performing these inspections within the specified time interval.</div></td><td class='diff-marker'>+</td><td style="color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office <ins class="diffchange diffchange-inline">bridge maintenance </ins>inspection crews shall be responsible for performing these inspections within the specified time interval.</div></td></tr>
<tr><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div></td><td class='diff-marker'> </td><td style="background-color: #f8f9fa; color: #222; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div></td></tr>
</table>Tschidhttps://epg.modot.org/index.php?title=Category:772_Bridge_Inspections&diff=16073&oldid=prevTschid: New page: All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually: 1. Structures in poor or worse conditio...2007-12-26T15:34:22Z<p>New page: All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually: 1. Structures in poor or worse conditio...</p>
<p><b>New page</b></p><div>All span type and culvert type bridges over 20 feet in length shall be inspected every two years. The following bridges will be inspected annually:<br />
<br />
1. Structures in poor or worse condition (condition 4 rating or less) for items 58, 59, 60, or 62 on the [[bridge inspection rating form]].<br />
<br />
2. Structures with timber structural members (sub-structural, super-structural, or decks) that are not included in the other criteria.<br />
<br />
The bridge inspection frequency for a particular structure can be set at time intervals ranging from monthly to every six months if the bridge inspection staff feel that additional monitoring of the structure is required to insure the safety of the traveling public.<br />
<br />
District's 4, 6, and 8 have personnel in the districts to conduct these inspections. The remaining districts will be inspected by Maintenance Division Bridge Maintenance personnel, with the assistance of district personnel knowledgeable in maintenance and bridges. Bridge-like structures less than 20 ft. - 00 in. shall be the responsibility of the district to inspect and maintain. Maintenance charges for these structures shall be charged to the roadway.<br />
<br />
Bridges jointly maintained with neighboring states shall be inspected in accordance with the "Maintenance Agreements" in effect. The inspection will be done by representatives from Missouri (from both the district and Central Office, Maintenance Division, Bridge Maintenance Section) and representatives from the neighboring state.<br />
<br />
The district will inspect any affected structures following any unusual occurrence such as fire, flood, overloading, collision, or damage of any type. Any damage occurring to a bridge superstructure or substructure shall immediately be reported to the Maintenance Division. On evenings, weekends and holidays the State Bridge Maintenance Engineer shall be contacted when a bridge emergency occurs.<br />
<br />
The guidelines set forth in the [[:Category:753 Bridge Inspection Rating|Bridge Inspection Rating]] shall be used when assigning rating and appraisal values to the corresponding items for bridges and culverts. The inspections shall address the items on the "Bridge Inspection Reports" and "Culverts Inspection Reports", generated by [[TMS]]. All inspections shall be thorough and complete so that all needed maintenance and repair work may be identified. The individual in charge of the inspection shall meet the qualifications spelled out in the National Bridge Inspection Standards.<br />
<br />
Fracture critical, in-depth, underwater, and other special inspections shall be identified and noted on the "Bridge Inspection Reports." Central Office, Bridge Maintenance Section inspection crews shall be responsible for performing these inspections within the specified time interval.<br />
Central Office bridge maintenance personnel will perform quality assurance inspections on an annual basis.</div>Tschid