Difference between revisions of "Category:948 Incident Response Plan and Emergency Response Management"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Power point removed since it no longer reflects current MoDOT policy)
m (article construction)
Line 1: Line 1:
[[image:948.jpg|right|200px]]
+
{| style="margin: 1em auto 1em auto" align="right"
 +
|-
 +
|[[image:948.jpg|right|200px]]||[[image:948 swat.jpg|250px]]
 +
|}
 
The [http://wwwi/intranet/tr/irp/default.htm Incident Response Plan] directs the actions of MoDOT personnel in the event of an incident or emergency situation. The plan establishes procedures for conducting effective and coordinated response and recovery operations using resources available to MoDOT.
 
The [http://wwwi/intranet/tr/irp/default.htm Incident Response Plan] directs the actions of MoDOT personnel in the event of an incident or emergency situation. The plan establishes procedures for conducting effective and coordinated response and recovery operations using resources available to MoDOT.
  

Revision as of 11:10, 11 September 2009

948.jpg
948 swat.jpg

The Incident Response Plan directs the actions of MoDOT personnel in the event of an incident or emergency situation. The plan establishes procedures for conducting effective and coordinated response and recovery operations using resources available to MoDOT.

Refer to http://wwwi/intranet/tr/emerg_response.htm for links to the Emergency Contact List, Missouri New Madrid Earthquake Exercise, the National Incident Management System (NIMS), MoDOT Emergency Communications and MEROC Trailers, MoDOT Standard Radio Load and the Incident Management Action Plan.

MoDOT also operates a statewide two-way radio communications system. This system is licensed in the Highway Maintenance and Local Government Public Safety Radio Service and may be referred to as a "dual use" system. Normally it is used for routine highway business but during times of declared emergency it augments Civil Defense.