Category talk:101 Standard Forms

From Engineering_Policy_Guide
Revision as of 12:09, 18 January 2013 by Brookw1 (talk | contribs)
Jump to navigation Jump to search

Please Correct the "construction Contingency" Cell within the Project Scoping Memorandum. Construction Contingency is suppose to be 2% but the cell is multiplying it by 3%.

Dan Tschirgi:The Project Scoping Memorandum has been corrected.

At least one of the posters on this page (MCHR-9) is outdated. Would it be better to just have a link to the posters on MoDOT's "Contractor Forms" page? [1] --Martik2 12:16, 9 March 2010 (CST)

Keith L. Smith: Thanks for the heads up. We got with External Civil Rights and they have revised what they want in the EPG.

The Quick Reference Guides for Contract Adjustments list AC Adjustments as a Contract Adjustment Type. This changed July 1, 2012 to be a Line Item Adjustment. The 2 QRG's for Contract Adjustments that come up in the search need to be updated to remove this as a type of Contract Adjustment.