LPA:136.13 LPA Policy Changes

From Engineering_Policy_Guide
Revision as of 09:47, 25 September 2012 by Smithk (talk | contribs) (Per LPA, moved existing EPG 136.12 info into this new article)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

9/24/12: A minor clarification was made to EPG 136.9.4.1.1.15 about the DBE goal applying to the entire federally-funded project. Also, a very minor update was made to Fig. 136.9.1.

9/5/12: Three figures, 136.4.10, 136.4.17 and 136.4.18, were updated with minor revisions.

9/4/12: The ADA Checklist, Fig. 136.9.4, was updated, replacing the old "ADA Post-Construction" and "Post-Inspection" Checklist. The new ADA Checklist presents expanded information to comply with the US Access Board's PROWAG 2005 and 2010 ADA/ABA standards. Also, Fig. 136.4.10 was updated with a minor revision.

8/30/12: Under "Federal-Aid Essential Videos" in the gray box at the top of EPG 136.4 Consultant Selection and Consultant Contract Management, the "Federal-Aid Program Overview" video was replaced with three other videos.

8/29/12: In EPG 136.4.1.5 Consultant Qualification, guidance was clarified for consultant qualification.

8/29/12: DBE requirement guidance was clarified in EPG 136.4.3.2 Supplemental Agreements.

8/27/12: Links to various FHWA videos were added to the gray boxes at the top of several articles (including EPG 136.3 Federal Aid Basics, EPG 136.4 Consultant Selection and Consultant Contract Management, EPG 136.6 Environmental and Cultural Requirements, EPG 136.7 Design, EPG 136.8 LPA Land Acquisition, EPG 136.9 PSE, EPG 136.10 Advertisement for Bid and Project Award and EPG 136.11 LPA Construction).

8/22/12: The invoice template guidance was clarified and slightly expanded in the "Invoice Detail" portion of EPG 136.4.3.1 Payments/Invoicing.

8/20/12: Fig. 136.9.1 was revised with a minor update.

8/9/12: Fig. 136.9.3 (Federal Project Bid Proposal Boilerplate) was updated.

7/31/12: Revised Fig. 136.4.10 and Fig. 136.4.18 with minor updates.

7/30/12: In EPG 136.12.3.3.1, the link to FHWA Form 1273 was updated. The new link is the same as the current link to this form in EPG 136.9 Plans, Specs and Estimates (PSE).

7/23/12: Fig. 136.4.10, LPA Consultant Services Invoice, was updated with a minor revision.

7/23/12: In EPG 136.4.2.4.1 Advertising on MoDOT’s Site, guidance was clarified by adding "When advertising on MoDOT's website, the LPA can choose to also advertise in a newspaper but it is not required."

7/18/12: Several links were updated and references to form attachments were updated in EPG 136.4 Consultant Selection and Consultant Contract Management. Also, Fig. 136.4.1 had minor clarifications and Fig. 136.4.17 had one minor update.

7/17/12: Fig. 136.4.10 was updated with minor changes.

7/17/12: A clarification in the second paragraph of EPG 136.9.2.3 Utility Status: "bid opening" was replaced with "construction obligation".

7/12/12: Figs. 136.4.18 and 136.9.1 were updated with minor corrections.

7/6/12: In EPG 136.4, Figs. 136.4.10 and 136.4.17 were updated as xlsx files.

7/2/12: Fig. 136.9.7, Required Contract Provision, was updated.

6/25/12: Fig. 136.5.4, Non-Infrastructure Obligation Request Form, was made available in EPG 136.5 Non-Infrastructure.

6/19/20: In EPG 136.4, the "How To" tutorial How to Evaluate Consultant Proposals, Complete Rating Sheets and Make a Selection was added. Also, minor updates were done to Fig. 136.4.10, LPA Consultant Services Invoice.

6/14/12: In EPG 136.12.1 Figures and EPG 136.8 LPA Land Acquisition, the Roster of Approved Contract Appraisers was updated so that LPAs can access it. Also, the Roster of Approved Contract Negotiators was added.

6/12/12: In EPG 136.6.4.10.2 Painting Bridges and Demolition of Painted Surfaces, a process change has been required by MoDOT's signing an MOU with DHSS. For any lead testing activity, the contractor must be licensed as a lead abatement contractor and the contractor must provide the proper notification(s) to DHSS.

6/11/12: In EPG 136.6.4.10.1 Renovation and Demolition of Structures, the use of an Asbestos Building Inspector was specified rather than "a certified asbestos inspector". Also, in EPG 136.4 Consultant Selection and Consultant Contract Management, Figs. 136.4.10 and 136.4.18 were updated.

6/6/12: Fig. 136.11.6 was clarified so that which form is being filled out and which of the other two figures comprising each half when the contractor fills it out are now clearly indicated.

6/4/12: A small clarification was made in Fig. 136.9.12.

5/25/12: Fig. 136.9.1 was updated with minor clarifications. Also, EPG 136.9.2.11 was added to further clarify the PS&E certification.

5/21/12: Several minor corrections of references to Federal Bid Proposal Boilerplate sections in EPG 136.9.4.1.1.4 through EPG 136.9.4.1.1.7.

5/17/12: In EPG 136.6.2 NEPA Classification, the info about the three-year shelf life of the NEPA was clarified. In EPG 136.12.3.3.1 Commonly Used Forms, the Obligation Request Form was updated. Also, Fig. 136.3.17 Work by Local Forces Proposal was updated.

5/11/12: A useful PowerPoint tutorial, "How to Complete the RFQ and Get it Advertised", is now available in EPG 136.4.2.3.

5/10/12: Fig. 136.9.1 was updated with minor clarifications. Also, there were minor corrections to EPG 136.10.6.1, EPG 136.10.6.2, EPG 136.10.6.3 and EPG 136.10.6.4.

5/3/12: Updated Fig. 136.9.3, Federal Project Bid Proposal Boilerplate.

4/30/12: Fig. 136.9.1 updated as an Excel file.

4/30/12: Two new figures (Figs. 136.11.14 and 136.11.15) and associated guidance were added to EPG 136.3.15.1 Progress Invoices and EPG 136.11.13.3 Invoices.

4/30/12: Because the info required by Fig. 136.3.1 Programming Data was split between it and Fig. 136.6.4 LPA Request for Env'l Review, the guidance for programming projects was revised. Note changes in the table in EPG 136.3.7.1, new guidance in EPG 136.3.8 Programs and shortened guidance in EPG 136.3.8.1.3, EPG 136.3.8.2.3, EPG 136.3.8.3.3, EPG 136.8.5.3.1 and EPG 136.3.8.5.3.2.

4/27/12: The guidance on the need for an erosion control plan was clarified in the first paragraph of EPG 136.6.4.8 Stormwater and Erosion Control. In the third paragraph of EPG 136.6.4.8, it was further clarified that the SWPPP does not need to be site-specific, but the erosion control plan does need to be site-specific.

4/24/12: Comments from the Corps of Engineers has clarified guidance in both EPG 136.6.4.3 Section 404 Permits for Wetlands and Streams and EPG 136.6.4.4 Channel Modification.

4/24/12: Several "How To" PowerPoint tutorials were added to EPG 136 LPA Policy articles. View these new tutorials at the bottom of the large, gray "Figure" boxes at the top of EPG 136.6, EPG 136.8 and EPG 136.11.

4/23/12: EPG 136 was generally re-written following thorough research. Please check the entire contents of any EPG 136 article you may be consulting so as not to miss any policy changes.