Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 110.3)
m (EPG 134.2.4)
Line 30: Line 30:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2" |    [[image:Main Page Oct 15, 2014.jpg|center|390px|thumb|<center>'''  MoDOT and its joint venture partner, Page Constructors, celebrated the opening of the first half of the new [http://www.modot.org/stlouis/major_projects/Route364upgrade.htm Rte. 364/Page Phase 3 project] with a 5K run, public viewing of the new road and a ribbon cutting. More than 200 runners take part in the One Shot and Done 5K run.  '''  </center>]]
+
|colspan="2" |    [[image:Main Page Oct 16, 2014.jpg|center|390px|thumb|<center>'''  The World Series comes to Kansas City's  [http://en.wikipedia.org/wiki/Interstate_70_in_Missouri#Route_description George Brett Super Highway] as it passes by the home of the Royals, [http://en.wikipedia.org/wiki/Kauffman_Stadium Kauffman Stadium]. '''  </center>]]
 
|-
 
|-
|colspan="2" |    [[image:Main Page 2 Oct 15, 2014.jpg|center|390px|thumb|<center>'''  Sen. Kurt Schaeffer, Boone County Commissioner Dan Atwill, Columbia City Manager Mike Matthes and District Engineer David Silvester cut the ribbon on the [https://www.flickr.com/photos/modot_central_district/sets/72157648197141926/ Rte. 740 (Stadium Blvd.) expansion project in Columbia]. This project is central Missouri’s first diverging diamond interchange.    '''  </center>]]
+
|colspan="2" |    [[image:Main Page Oct 15, 2014.jpg|center|390px|thumb|<center>'''  MoDOT and its joint venture partner, Page Constructors, celebrated the opening of the first half of the new [http://www.modot.org/stlouis/major_projects/Route364upgrade.htm Rte. 364/Page Phase 3 project] with a 5K run, public viewing of the new road and a ribbon cutting. More than 200 runners take part in the One Shot and Done 5K run.    '''  </center>]]
 
|-
 
|-
|colspan="2" |  [[image:Main Page 3 Oct 15, 2014.jpg|center|390px|thumb|<center>'''  Sr. Construction Inspector Steve Markham conducts a salary survey with a contractor at a bridge project on Rte. 13 south of Clinton.    '''  </center>]]
+
|colspan="2" |  [[image:Main Page 2 Oct 15, 2014.jpg|center|390px|thumb|<center>'''  Sen. Kurt Schaeffer, Boone County Commissioner Dan Atwill, Columbia City Manager Mike Matthes and District Engineer David Silvester cut the ribbon on the [https://www.flickr.com/photos/modot_central_district/sets/72157648197141926/ Rte. 740 (Stadium Blvd.) expansion project in Columbia].  This project is central Missouri’s first diverging diamond interchange.    '''  </center>]]
 
|}
 
|}
  
Line 45: Line 45:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2" | [[image:Main Page Oct 1, 2014.jpg|center|390px|thumb|<center>'''  The Lebanon High School Class of 1964 celebrated its 50th anniversary by honoring James R. Ledbetter, a medical corpsman with the Navy who lost his life in the line of duty on March 12, 1968 in Vietnam.  The Rte. 5 bridge over I-44 in Lebanon now permanently bears his name.  '''  </center>]]
+
|colspan="2" | [[image:Main Page 3 Oct 15, 2014.jpg|center|390px|thumb|<center>'''  Sr. Construction Inspector Steve Markham conducts a salary survey with a contractor at a bridge project on Rte. 13 south of Clinton.  '''  </center>]]
 
|}
 
|}
  
Line 52: Line 52:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-October, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-October, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 101869 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 149981
+
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 101895 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 150021
 
|-
 
|-
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 105090     ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 183018
+
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 105149     ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 183060
 
|-
 
|-
|'''18.'''    [[751.5 Standard Details|EPG 751.5]], 105837 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 183628
+
|'''18.'''    [[751.5 Standard Details|EPG 751.5]], 105964 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 183672
 
|-
 
|-
|'''17.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 107948     ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 186581
+
|'''17.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 107983     ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 186664
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 111735   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 193617
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 111753   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 193665
 
|-
 
|-
|'''15.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 112017   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 226749
+
|'''15.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 112036   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 226810
 
|-
 
|-
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 117594   || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 234389
+
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 117646   || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 234468
 
|-
 
|-
|'''13.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 117749 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 253346
+
|'''13.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 117763 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 253432
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 130869 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 286708
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 130902 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 286888
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 145696 ||'''1.''' EPG Main Page, 1734915
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 145730 ||'''1.''' EPG Main Page, 1735980
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[:Category:134 Engineering Professional Services#134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts|EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts]]'''
 +
 +
10/16/14: Verbiage about Hourly Rates was removed since they no longer apply to On-Call contracts. 
 +
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Occasionally a subcontractor|EPG 110.3 Prevailing Wages and Records]]'''
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Occasionally a subcontractor|EPG 110.3 Prevailing Wages and Records]]'''
  
Line 169: Line 173:
  
 
8/25/14: [[751.50 Standard Detailing Notes#(I1.67) Field Welding New Stiffeners|Note I1.67]] was updated for greater clarity.
 
8/25/14: [[751.50 Standard Detailing Notes#(I1.67) Field Welding New Stiffeners|Note I1.67]] was updated for greater clarity.
 
'''The Professional Land Surveyor's Signature and Seal on Legal Descriptions'''
 
 
8/21/14: Guidance for the PLS signature and seal was clarified in [[238.2 Land Surveying#238.2.17 Professional Land Surveyor Review|EPG 238.2.17 Professional Land Surveyor Review]] as well as [[236.4 Description Writing and Titles#236.4.6.2 Methods of Legally Describing the Fee or Portion Thereof|EPG 236.4.6.2 Methods of Legally Describing the Fee or Portion Thereof]].
 
 
'''[http://www.modot.org/business/BoxCulvertQuantityProgram.htm Box Culvert Quantity Program]'''
 
 
8/20/14: This program is now presented in [[751.8 LRFD Concrete Box Culverts|EPG 751.8 LRFD Concrete Box Culverts]].
 

Revision as of 11:17, 16 October 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
The World Series comes to Kansas City's George Brett Super Highway as it passes by the home of the Royals, Kauffman Stadium.
MoDOT and its joint venture partner, Page Constructors, celebrated the opening of the first half of the new Rte. 364/Page Phase 3 project with a 5K run, public viewing of the new road and a ribbon cutting. More than 200 runners take part in the One Shot and Done 5K run.
Sen. Kurt Schaeffer, Boone County Commissioner Dan Atwill, Columbia City Manager Mike Matthes and District Engineer David Silvester cut the ribbon on the Rte. 740 (Stadium Blvd.) expansion project in Columbia. This project is central Missouri’s first diverging diamond interchange.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Sr. Construction Inspector Steve Markham conducts a salary survey with a contractor at a bridge project on Rte. 13 south of Clinton.
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-October, the numbers of hits are:
20. EPG 400, 101895 10. EPG 616, 150021
19. EPG 903.6, 105149 9. EPG 101, 183060
18. EPG 751.5, 105964 8. EPG 600, 183672
17. EPG 134, 107983 7. EPG 616.23, 186664
16. EPG 136.4, 111753 6. EPG 136.12, 193665
15. EPG 751.40, 112036 5. EPG 100, 226810
14. EPG 620.2, 117646 4. EPG 700, 234468
13. EPG 136.9, 117763 3. EPG 900, 253432
12. EPG 903, 130902 2. EPG 751, 286888
11. EPG 200, 145730 1. EPG Main Page, 1735980

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts

10/16/14: Verbiage about Hourly Rates was removed since they no longer apply to On-Call contracts.

EPG 110.3 Prevailing Wages and Records

10/16/14: Guidance was added about subcontractors signing the prevailing wage affidavit.

EPG 139 Design - Build

10/15/14: Additional guidance for existing practices is now available for this article, especially a Procurement Document Writing Guide.

EPG 110.3 Prevailing Wages and Records

10/15/14: Since the MO Dept. of Labor certified payroll form is no longer used by MoDOT, a sentence referencing it was removed.

EPG 751.50 Standard Detailing Notes H3c. Type N PTFE

10/1/14: Two new notes, H3.24 and H3.31, are now available for use on plan sheets.

EPG 139.8.2.6 Design-Build Proposal Selection and Project Award

9/24/14: Guidance about the Commission's project design approval for Design-Build projects was clarified.

EPG 170 Maintenance Activity Planning Guidelines

9/23/14: The Maintenance Activity Planning Guidelines have been revised to accommodate changes in MoDOT operations and to provide consistency among districts.

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

9/23/14: In recent years, there have been a number of changes in best management practices to comply with the Clean Water Act. Regulatory agencies have also greatly increased their level of scrutiny in this area. This article was generally revised to allow MoDOT to remain good stewards of the environment by providing guidance on the proper methods and equipment with which to prevent storm water pollution.

Design of Seal Coats

9/23/14: Seal coat projects have been bid by combining asphalt emulsion and aggregate pay items. This article was revised to provide guidance for seal coat application types and to establish separate pay items for emulsion and aggregate.

Utility Agreement Maximum

9/23/14: In EPG 643.2.1.33 Lump Sum Estimates and EPG 643.2.2.1.3 Types of Cost Estimates for Agreements, the limit was raised on lump sum agreements for utilities, eliminating need for keeping and auditing detailed cost records. Lump sum agreements are now to be submitted with a clearly defined scope and cost estimate.

Optional Pavement Design for Minor Roads

9/23/14: This new table allows a pavement thickness determination that should offset cost of early maintenance repairs.

VECP/PDVECP Approval/Rejection Process

9/23/14: The VECP/PDVECP had an evaluation process but provided no recourse for contractor if submittal is rejected. EPG 104.13.2 Value Engineering Proposal Support was added so that a request can be submitted to Construction & Materials.

Impact Fee

9/11/14: General guidance was recently added about the assessment of an impact fee to fund future maintenance and operation of system expansion projects completely funded by other entities. The info is located in a yellow box at the top of EPG 121.3 The Statewide Transportation Improvement Program (STIP).

Personal Protective Equipment (PPE)

9/9/14: Guidance in EPG 616.4.3 Worker Safety Considerations, EPG 616.5.2 High-Visibility Safety Apparel, EPG 616.18 Construction Inspection Guidelines for Sec 616 and EPG 616.20 Flagger Training was brought into line with current PPE requirements.

EPG 134.5.4 Consultant Performance Appraisals

9/8/14: Guidance was updated to reflect the new Online Evaluation of the consultant’s performance.

EPG 151 Administrative Rule Creation or Modification Process

9/5/14: This new article outlines the process to create or modify administrative rules. It especially applies to divisional leaders and is based upon new Missouri legislation.

Pilot Vehicle Brochure

9/3/14: In EPG 616.5.3.7 Pilot Vehicle information about the Pilot Vehicle brochure has been added.

EPG 127.25.2.1 Hazardous Material Spills (Roadway) by Others

9/2/14: Existing policy was clarified as well as the District Hazardous Material Coordinator info was updated.

EPG 606.1.3.1 3R/4R Projects

8/29/14: Guidance about the considerations for guardrails in 1R, 2R, 3R and 4R work was clarified.

EPG 701 Drilled Shafts

8/29/14: Guidance was added to clarify why CSL pipes must be filled with water and plugger or capped, as required by Sec 701.4.17.2.1.

EPG 643.2.1.13 Federal Cost Participation for Reimbursable Utility Relocations

8/29/14: This new subarticle further clarifies and gives additional info for this topic. As a result of this new info, the wording used in Master Reimbursable Utility Agreements (MRUA) has been slightly revised to reference Engineering Policy Guide 643.2.1.44 (instead of 643.2.1.43).

"Phased" Section 106 Process

8/28/14: EPG 135.2 The Section 106 Process for MoDOT Projects was revised to reflect a new agreement with FHWA and others allowing MoDOT to use a “phased” approach to achieve Section 106 compliance.

Outdoor Advertising

8/26/14: Clarifying guidance about grandfathering an extension was added to EPG 236.16.11 Cutout and Extension Process.

Engineering Judgment

8/26/14: A paragraph was added to EPG 900.1.9 Engineering Study and Engineering Judgment's "Guidance" and a sentence removed from EPG 900.1.13 Definitions' "A. Standard" to reflect that FHWA now permits MoDOT to use engineering judgment to modify "shall" conditions.

Standard Detailing Notes

8/25/14: Note I1.67 was updated for greater clarity.