Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 102 and EPG 237.9)
m
Line 30: Line 30:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2" |    [[image:Main Page Nov 6, 2014.jpg|center|390px|thumb|<center>'''  As a part of the statewide Snow Drill, Maintc. Worker Courtney Jefferson, left, provides guidance on how to check and clean the brine's filter on the back of the truck to other employees.  '''  </center>]]
+
|colspan="2" |    [[image:Main Page Nov 10, 2014.jpg|center|390px|thumb|<center>'''  Work is underway on the [http://www.modot.org/kansascity/major_projects/US69MRB.htm U.S. 69 Missouri River Bridge project] in Riverside, MO. [http://www.americanbridge.net/ American Bridge] crews are milling away the surface of the bridge, the first step before removing the structure. The $79 million cost of the [[:Category:139 Design – Build|design-build]] project to replace the old bridge will be split with the Kansas Department of Transportation.  '''  </center>]]
 
|-
 
|-
|colspan="2" |    [[image:Main Page Nov 5, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Crew Leader Kale Stewart (left) walks Seasonal Employee Jerry Keel through the process of securing a plow to a truck during [http://www.modot.org/central/# Central District's] annual Snow Drill.    '''  </center>]]
+
|colspan="2" |    [[image:Main Page Nov 6, 2014.jpg|center|390px|thumb|<center>'''  As a part of the statewide Snow Drill, Maintc. Worker Courtney Jefferson, left, provides guidance on how to check and clean the brine's filter on the back of the truck to other employees.    '''  </center>]]
 
|-
 
|-
|colspan="2" |  [[image:Main Page Nov 4, 2014.jpg|center|390px|thumb|<center>'''  The speed limit for Rte. 10 from 1400 ft. east of New Garden Rd. to 700 ft. west of Rte. O through Wood Heights (sometimes also called "Woods Heights") will increase from 45 mph to 55 mph. A [[905.2 Traffic Studies|traffic study]] determined the new speed limit was more appropriate for the section.    '''  </center>]]
+
|colspan="2" |  [[image:Main Page Nov 5, 2014.jpg|center|390px|thumb|<center>'''  Maintc. Crew Leader Kale Stewart (left) walks Seasonal Employee Jerry Keel through the process of securing a plow to a truck during [http://www.modot.org/central/# Central District's] annual Snow Drill.    '''  </center>]]
 
|}
 
|}
  
Line 45: Line 45:
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|colspan="2" | [[image:Main Page Oct 30, 2014.jpg|center|390px|thumb|<center>'''  The Christopher S. Bond bridge, just north of downtown Kansas City, is bathed in [http://kansascity.royals.mlb.com/index.jsp?c_id=kc KC Royals] blue.  '''  </center>]]
+
|colspan="2" | [[image:Main Page Nov 4, 2014.jpg|center|390px|thumb|<center>'''  The speed limit for Rte. 10 from 1400 ft. east of New Garden Rd. to 700 ft. west of Rte. O through Wood Heights (sometimes also called "Woods Heights") will increase from 45 mph to 55 mph. A [[905.2 Traffic Studies|traffic study]] determined the new speed limit was more appropriate for the section.  '''  </center>]]
 
|}
 
|}
  
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
 
|-
 
|-
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early November, the numbers of hits are:'''
+
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-November, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 102486 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 151556
+
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 102526 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 151645
 
|-
 
|-
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 107230     ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 184522
+
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 107320     ||'''9.'''  [[:Category:101 Standard Forms|EPG 101]], 184966
 
|-
 
|-
|'''18.'''    [[751.5 Standard Details|EPG 751.5]], 107689 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 185048
+
|'''18.'''    [[751.5 Standard Details|EPG 751.5]], 107802 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 185162
 
|-
 
|-
|'''17.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 110810     ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 188577
+
|'''17.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 111120     ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 188735
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 112366   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 194814
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 112401   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 194893
 
|-
 
|-
|'''15.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 112471   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 228490
+
|'''15.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 112501   ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 228750
 
|-
 
|-
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 118310   || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 236439
+
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 118353   || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 236622
 
|-
 
|-
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 119080 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 255477
+
|'''13.'''  [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 119211 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 255629
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 132080 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 290516
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 132155 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 290752
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 146556 ||'''1.''' EPG Main Page, 1759274
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 146614 ||'''1.''' EPG Main Page, 1760868
 
|}
 
|}
  

Revision as of 12:30, 10 November 2014

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Work is underway on the U.S. 69 Missouri River Bridge project in Riverside, MO. American Bridge crews are milling away the surface of the bridge, the first step before removing the structure. The $79 million cost of the design-build project to replace the old bridge will be split with the Kansas Department of Transportation.
As a part of the statewide Snow Drill, Maintc. Worker Courtney Jefferson, left, provides guidance on how to check and clean the brine's filter on the back of the truck to other employees.
Maintc. Crew Leader Kale Stewart (left) walks Seasonal Employee Jerry Keel through the process of securing a plow to a truck during Central District's annual Snow Drill.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

The speed limit for Rte. 10 from 1400 ft. east of New Garden Rd. to 700 ft. west of Rte. O through Wood Heights (sometimes also called "Woods Heights") will increase from 45 mph to 55 mph. A traffic study determined the new speed limit was more appropriate for the section.
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-November, the numbers of hits are:
20. EPG 400, 102526 10. EPG 616, 151645
19. EPG 903.6, 107320 9. EPG 101, 184966
18. EPG 751.5, 107802 8. EPG 600, 185162
17. EPG 134, 111120 7. EPG 616.23, 188735
16. EPG 136.4, 112401 6. EPG 136.12, 194893
15. EPG 751.40, 112501 5. EPG 100, 228750
14. EPG 136.9, 118353 4. EPG 700, 236622
13. EPG 620.2, 119211 3. EPG 900, 255629
12. EPG 903, 132155 2. EPG 751, 290752
11. EPG 200, 146614 1. EPG Main Page, 1760868

Bidding Documents

11/7/14: In EPG 102 Bidding Requirements and Conditions, references to Indox were removed.

District Final Plans Checklist, Form D-12

11/7/14: In EPG 237.9.1 Final Design Plans Submittal, the Form D-12 was updated. Also, the Letter of Transmittal is no longer used.

Outdoor Advertising Personnel

11/6/14: EPG 236.16.2 Organization & Personnel has been updated to show the new boundaries of the six areas of Missouri served by the Outdoor Advertising Area Specialists.

Field Welder Qualification

10/31/14: EPG 712 Structural Steel Construction, especially EPG 712.1.4 Welding, EPG 712.1.5 High Strength Bolts and EPG 712.2.3.2 PAL Manufacturer Facilities Sampling, were updated to reflect current field welder qualification practices. Much of EPG 903.24.1 Procedure was deleted to removed archaic welder qualification info. Also, the Welder Qualification Form in EPG 101 was removed as it is no longer required.

Pavement Marking Acceptance Table

10/22/14: This table, used to determine the quality and remaining life of new and existing pavement markings, has been updated and clarified.

"Additional Information" Box Provides Quick References for Guardrail, Guard Cable and More

10/22/14: The box at the top of EPG 606 Guardrail and Guard Cable has been expanded to include pdf files presenting useful info about roadside hardware.

EPG 903.6.11 Chevron Alignment Signs

10/17/14: By Dec. 31, 2019, Chevron Alignment signs are to be installed on curves with AADTs greater than 1000 that also have an advisory speed that is 15 mph or more below the road’s posted speed.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts

10/16/14: Verbiage about Hourly Rates was removed since they no longer apply to On-Call contracts.

EPG 110.3 Prevailing Wages and Records

10/16/14: Guidance was added about subcontractors signing the prevailing wage affidavit.

EPG 139 Design - Build

10/15/14: Additional guidance for existing practices is now available for this article, especially a Procurement Document Writing Guide.

EPG 110.3 Prevailing Wages and Records

10/15/14: Since the MO Dept. of Labor certified payroll form is no longer used by MoDOT, a sentence referencing it was removed.

EPG 751.50 Standard Detailing Notes H3c. Type N PTFE

10/1/14: Two new notes, H3.24 and H3.31, are now available for use on plan sheets.

EPG 139.8.2.6 Design-Build Proposal Selection and Project Award

9/24/14: Guidance about the Commission's project design approval for Design-Build projects was clarified.

EPG 170 Maintenance Activity Planning Guidelines

9/23/14: The Maintenance Activity Planning Guidelines have been revised to accommodate changes in MoDOT operations and to provide consistency among districts.

EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP)

9/23/14: In recent years, there have been a number of changes in best management practices to comply with the Clean Water Act. Regulatory agencies have also greatly increased their level of scrutiny in this area. This article was generally revised to allow MoDOT to remain good stewards of the environment by providing guidance on the proper methods and equipment with which to prevent storm water pollution.

Design of Seal Coats

9/23/14: Seal coat projects have been bid by combining asphalt emulsion and aggregate pay items. This article was revised to provide guidance for seal coat application types and to establish separate pay items for emulsion and aggregate.

Utility Agreement Maximum

9/23/14: In EPG 643.2.1.33 Lump Sum Estimates and EPG 643.2.2.1.3 Types of Cost Estimates for Agreements, the limit was raised on lump sum agreements for utilities, eliminating need for keeping and auditing detailed cost records. Lump sum agreements are now to be submitted with a clearly defined scope and cost estimate.

Optional Pavement Design for Minor Roads

9/23/14: This new table allows a pavement thickness determination that should offset cost of early maintenance repairs.

VECP/PDVECP Approval/Rejection Process

9/23/14: The VECP/PDVECP had an evaluation process but provided no recourse for contractor if submittal is rejected. EPG 104.13.2 Value Engineering Proposal Support was added so that a request can be submitted to Construction & Materials.

Impact Fee

9/11/14: General guidance was recently added about the assessment of an impact fee to fund future maintenance and operation of system expansion projects completely funded by other entities. The info is located in a yellow box at the top of EPG 121.3 The Statewide Transportation Improvement Program (STIP).

Personal Protective Equipment (PPE)

9/9/14: Guidance in EPG 616.4.3 Worker Safety Considerations, EPG 616.5.2 High-Visibility Safety Apparel, EPG 616.18 Construction Inspection Guidelines for Sec 616 and EPG 616.20 Flagger Training was brought into line with current PPE requirements.

EPG 134.5.4 Consultant Performance Appraisals

9/8/14: Guidance was updated to reflect the new Online Evaluation of the consultant’s performance.

EPG 151 Administrative Rule Creation or Modification Process

9/5/14: This new article outlines the process to create or modify administrative rules. It especially applies to divisional leaders and is based upon new Missouri legislation.

Pilot Vehicle Brochure

9/3/14: In EPG 616.5.3.7 Pilot Vehicle information about the Pilot Vehicle brochure has been added.

EPG 127.25.2.1 Hazardous Material Spills (Roadway) by Others

9/2/14: Existing policy was clarified as well as the District Hazardous Material Coordinator info was updated.