Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST))
m (EPG 750.7)
Line 50: Line 50:
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-June, the numbers of hits are:'''
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-June, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[751.50 Standard Detailing Notes|EPG 751.50]], 115527 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 163483
+
|'''20.'''  [[751.50 Standard Detailing Notes|EPG 751.50]], 115602 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 163550
 
|-
 
|-
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 116671     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 198018
+
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 116744     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 198104
 
|-
 
|-
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 119875   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 209708
+
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 119903   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 209764
 
|-
 
|-
|'''17.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 120641   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 223734
+
|'''17.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 120661   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 224000
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 125588   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 238171
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 125630   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 238526
 
|-
 
|-
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 130470     ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 242904
+
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 130531     ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 243008
 
|-
 
|-
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 133210     || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 252676
+
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 133274     || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 252773
 
|-
 
|-
|'''13.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 133336   || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 273595
+
|'''13.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 133426   || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 273715
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 147724 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 317204
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 147830 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 317336
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 154350 ||'''1.''' EPG Main Page, 1989698
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 154403 ||'''1.''' EPG Main Page, 1991133
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''Box Culvert Concrete Type'''
 +
 +
6/12/15: In [[750.7 Non-Hydraulic Considerations#750.7.4.6 Concrete Type|EPG 750.7.4.6 Concrete Type]], guidance has been added for the updated Class B-1 Concrete pay item.
 +
 
'''[[Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)|Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)]]'''
 
'''[[Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)|Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)]]'''
  
Line 167: Line 171:
  
 
4/8/15: In [[:Category:170 Maintenance Activity Planning Guidelines|EPG 170 Maintenance Activity Planning Guidelines]], guidance for scrub seals has been added to [http://epg.modot.mo.gov/files/0/06/R315.pdf R315 Pavement Preventative Maintenance (LM)].
 
4/8/15: In [[:Category:170 Maintenance Activity Planning Guidelines|EPG 170 Maintenance Activity Planning Guidelines]], guidance for scrub seals has been added to [http://epg.modot.mo.gov/files/0/06/R315.pdf R315 Pavement Preventative Maintenance (LM)].
 
'''[[751.1 Preliminary Design#751.1.2.19 Soundings (Borings)|EPG 751.1.2.19 Soundings (Borings)]]'''
 
 
4/1/15: Guidance was updated to current practice and info from other articles was consolidated here. The M-40a, M-40b and the Request for Soil Properties forms were replaced with one form: Request for Final Soundings of Structures Form. A new document for using this new form provides guidance for obtaining Northings and Eastings, guidance for identifying classifications of routes and bridges and includes example sounding layouts.
 

Revision as of 15:04, 12 June 2015

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Transp. Proj. Man. Keith Killen works on a TIGER grant application requesting $10 million for a new Mississippi River bridge on Rte. 54 at Louisiana, MO. The bridge is estimated to cost $63.2 million and is not funded at this time. Killen and other MoDOT employees will submit this as an Illinois DOT and MoDOT joint application. So far, only 6% of applications have been awarded. If awarded a grant, the project must be ready for letting by September 2017.
Sr. Maint. Worker Scott Claycomb (left) and Maint. Crew Leader Cody Sanny remove a damaged delineator along an on-ramp on I-49 near Neosho.
Walsh-Alberici Joint Venture employees pour concrete on I-70's New Daniel Boone Bridge. Traffic should be on the new eastbound bridge before summer ends.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

A temporary bridge over Sinking Cr. in Shannon County is now open to traffic. The Rte. 19 bridge over Sinking Cr. had been reduced to one lane with a weight restriction of 20 tons. "The temporary structure will allow heavy truck traffic to avoid lengthy detours," said Asst. Distr. Engineer Chris Rutledge. "Until funding for construction of a new bridge becomes available, the bypass will remain in place. That could take years."
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-June, the numbers of hits are:
20. EPG 751.50, 115602 10. EPG 616, 163550
19. EPG 903.6, 116744 9. EPG 600, 198104
18. EPG 134, 119903 8. EPG 616.23, 209764
17. EPG 751.40, 120661 7. EPG 101, 224000
16. EPG 136.4, 125630 6. EPG 136.12, 238526
15. EPG 751.5, 130531 5. EPG 100, 243008
14. EPG 136.9, 133274 4. EPG 700, 252773
13. EPG 620.2, 133426 3. EPG 900, 273715
12. EPG 903, 147830 2. EPG 751, 317336
11. EPG 200, 154403 1. EPG Main Page, 1991133

Box Culvert Concrete Type

6/12/15: In EPG 750.7.4.6 Concrete Type, guidance has been added for the updated Class B-1 Concrete pay item.

Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)

6/12/15: This table has been updated with the latest information.

EPG 907.3 Travel Safe Zones

6/11/15: This article was clarified and expanded, including a step-by-step description of the Travel Safe Zone process, was added to better explain where and why TSZs are needed.

Concrete Bridge Deck Sealers

6/10/15: Several EPG 771 Bridge Preventative Maintenance Guidelines articles have been removed or revised. The new listing for the concrete bridge deck sealer articles is available at EPG 771.15 Concrete Bridge Deck Sealer Selection Matrix.

EPG 131.2.2.1 Requests for use of a Proprietary Item

6/9/15: The submittal process has been updated.

Mechanical Bar Splice Samples

6/9/15: In EPG 1036.2.1.1 Reinforcing Steel, Dowel Bars, Mechanical Bar Splices and Cold Drawn Wire, new guidance for sampling mechanical bar splices was added so that the guidance now matches current practice.

EPG 236.16.12.1 Digital Upgrade Request

5/29/15: In the digital sign upgrade process, upon receiving a written upgrade request from the permit owner, the trait “COS DIGITAL REQUEST” should now be updated to “YES” and the written upgrade request attached in TMS.

Pre-Acceptance Lists and Summary of Materials Inspected

5/28/15: PAL guidance in EPG 106.12.1.2 District Responsibility was clarified to allow districts to review PAL facilities on a quarterly basis. In EPG 106.21.1.1 Summary Packet of Materials Inspected, guidance was clarified to make the Summary of Concrete Component Testing portion of the summary report optional.

EPG 108.1 Subletting of Contract

5/27/15: Guidance for the contract subletting was clarified and the approval process was streamlined. Guidance on how to handle second tier subcontracting was added. The requirement for subcontract requests to be digitally signed and submitted electronically will be phased in.

Updated QRGs

5/15/15: In EPG 101 Standard Forms, Change Order Codes and Change Orders – Value Engineering were updated.

Commercially Useful Function (CUF) Determination Form

5/15/15: In EPG 146 Disadvantaged Business Enterprise (DBE), the latest version of the CUF Determination Form has been provided.

New QRG

5/14/15: How to Use Cognos Reports is now available in EPG 101 Standard Forms.

Non-Profit and Governmental Indirect Cost Rate Requirements

5/14/15: Guidance has been added to EPG 134.1.3 Consultant Qualification to accommodate 2CFR 200’s requirements for both non-profit and governmental organizations.

Updating Box Culverts to LRFD Design

5/13/15: In EPG 750.2.11, added guidance that flow line elevations may be below natural stream bottom. In EPG 750.7.4.1 and EPG 751.8.1, updated Reference Guide SBC. In EPG 751.8.3.2 and EPG 751.8.3.3: clarified that the E1 bar mark is used in the toe walls both up- and downstream, clarified that J6 bars are used in flared wings in lieu of J1 bars, and added bending diagrams for R1 and R2 bars. In EPG 751.50, revised Notes A1.2 and A2.10.

EPG 643 Utility Procedures

5/12/15: Three of the EPG 643 articles were generally updated. EPG 643.1 Utilities - Status and Liability Acceptance also updated info on "no utility impact" projects and removed detail of liability acceptance. In EPG 643.2 Local Utility Adjustments - Public and Private, guidance for Change Orders was updated. EPG 643.3 Policy, Standards and Regulations was organized to better reflect the CSR. Online permitting info was added and some of the bridge attachment info. was updated.

Change Order Codes

5/12/15: This QRG was clarified in both EPG 101 Standard Forms and EPG 109 Measurement and Payment to to better describe the reasons code should be used in any situation.

MoDOT Work Zone Impact Analysis Spreadsheet with HCM 2010 Program

5/11/15: This spreadsheet has been updated in EPG 616.13 Work Zone Capacity, Queue and Travel Delay.

EPG 907.7 Highway Safety Manual

4/23/15: This new article reflects current policy regarding the Highway Safety Manual.

ADA Checklist

4/22/15: The latest version of the ADA Checklist is now available at EPG 642.1 Sidewalk Design Criteria.

EPG 146.3.1 DBE Subcontract – Performing Work Onsite

4/20/15: New guidance is available for materials supplier DBEs who are not performing any labor on the project. Instructions have been provided for completing and saving CUF verification forms strictly related to materials suppliers.

EPG 150 Quality Management

4/15/15: Archaic guidance was deleted to conform with changes made to the July 2014 Quality Management JSP.  Also, MoDOT now provides a Corrective Action Request form for contractors to use.

EPG 750.7.3 Environmental Requirements

4/9/16: Along with new verbiage for clarification, a table, Summary of COE Regional Condition Requirements, has been added.

EPG 821 Herbicides and Roadsides

4/9/15: In EPG 821.11 Calibration, new guidance for Backpack Sprayer Calibrations has been added. Also, MoDOT herbicides for 2015 are listed in EPG 821.25 Products.

Outdoor Advertising

4/8/15: In EPG 236.16.10.1 Adding Controlled Routes, routes reclassified as NHS should now be inventoried within 90 days of notification.

R315 Scrub Seals

4/8/15: In EPG 170 Maintenance Activity Planning Guidelines, guidance for scrub seals has been added to R315 Pavement Preventative Maintenance (LM).