Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 1020, EPG 616.6)
m (EPG 751.5, EPG 751.22)
Line 54: Line 54:
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late November, the numbers of hits are:'''
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late November, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[903.6 Warning Signs|EPG 903.6]], 122436 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 172889
+
|'''20.'''  [[903.6 Warning Signs|EPG 903.6]], 122478 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 172959
 
|-
 
|-
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 126211     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 207355
+
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 126310     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 207447
 
|-
 
|-
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 132134   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 224257
+
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 132151   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 224353
 
|-
 
|-
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 133018   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 249358
+
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 133052   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 249579
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 137400     ||'''6.'''  [[:Category:100 GENERAL|EPG 100]], 255371
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 137565     ||'''6.'''  [[:Category:100 GENERAL|EPG 100]], 255452
 
|-
 
|-
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 143218     ||'''5.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 263499
+
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 143427     ||'''5.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 263599
 
|-
 
|-
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 144841     || '''4.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 282547
+
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 144919     || '''4.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 282797
 
|-
 
|-
|'''13.'''    [[:Category:903 Highway Signing|EPG 903]], 154606   || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 285388
+
|'''13.'''    [[:Category:903 Highway Signing|EPG 903]], 154670   || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 285514
 
|-
 
|-
|'''12.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 155848  ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 336574
+
|'''12.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 155880  ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 336821
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 162289   ||'''1.''' EPG Main Page, 2177090
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 162337   ||'''1.''' EPG Main Page, 2178611
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''NU Girder Reinforcement'''
 +
 +
11/24/15: Revised tables and images in [[751.5 Structural Detailing Guidelines#751.5.4.1 Precast P/S Concrete Girders and Beams|EPG 751.5.4.1 Precast P/S Concrete Girders and Beams]] and [[751.22 P/S Concrete I Girders#751.22.3.6 Girder Reinforcement|EPG 751.22.3.6 Girder Reinforcement]] to accommodate possible savings using a new NU reinforcement design.
 +
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs|EPG 616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs]]'''
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs|EPG 616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs]]'''
  
Line 170: Line 174:
 
'''[[606.1 Guardrail#606.1.3.2 Approved Crashworthy End Terminals|EPG 606.1.3.2 Approved Crashworthy End Terminals]]'''
 
'''[[606.1 Guardrail#606.1.3.2 Approved Crashworthy End Terminals|EPG 606.1.3.2 Approved Crashworthy End Terminals]]'''
  
9/9/15: Previously, a contractor would typically choose the cheapest end treatment from the approved list and provide that unit whether it was the best solution or not.  For that reason, end treatments are now further subdivided to more closely match the hardware to its intended use, performance, reusability and cost of repair.   
+
9/9/15: Previously, a contractor would typically choose the cheapest end treatment from the approved list and provide that unit whether it was the best solution or not.  For that reason, end treatments are now further subdivided to more closely match the hardware to its intended use, performance, reusability and cost of repair.
 
 
'''[http://epg.modot.org/index.php?title=106.3.2.59_TM-59%2C_Determination_of_the_International_Roughness_Index#106.3.2.59.3_Construction_Acceptance_Procedures Determination of the International Roughness Index]'''
 
 
 
9/9/15: Guidance now codifies the intent that no filters may be used to distort the true road profile measurement with an inertial profiler.
 

Revision as of 15:49, 24 November 2015

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Sr. Maintenance Worker Billy Barber drives a plow truck during the statewide winter operations drill. The drill tests MoDOT’s preparedness for the upcoming winter season.
Patrick K. McKenna greets the Missouri Highways and Transportation Commission at the press conference where he was named to be the new Director of MoDOT.
Main Page Nov 5, 2015.jpg
New signals and signs have been installed along Rte. 6 in St. Joseph. Below, a flashing yellow arrow helps heavy traffic at Village Dr. navigate more safely and efficiently.
Main Page 2 Nov 5, 2015.jpg

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Lehman Construction, LLC crews will be pouring Rte. 79’s Big Calumet Creek Bridge deck in Pike County. After receiving a new deck, approach pavements and a barrier wall will be added. The bridge is planned to reopen by December 1st.
Perhaps you've wondered how many hits the most popular EPG articles have. As of late November, the numbers of hits are:
20. EPG 903.6, 122478 10. EPG 616, 172959
19. EPG 134, 126310 9. EPG 600, 207447
18. EPG 751.40, 132151 8. EPG 616.23, 224353
17. EPG 751.50, 133052 7. EPG 101, 249579
16. EPG 136.4, 137565 6. EPG 100, 255452
15. EPG 751.5, 143427 5. EPG 700, 263599
14. EPG 620.2, 144919 4. EPG 136.12, 282797
13. EPG 903, 154670 3. EPG 900, 285514
12. EPG 136.9, 155880 2. EPG 751, 336821
11. EPG 200, 162337 1. EPG Main Page, 2178611

NU Girder Reinforcement

11/24/15: Revised tables and images in EPG 751.5.4.1 Precast P/S Concrete Girders and Beams and EPG 751.22.3.6 Girder Reinforcement to accommodate possible savings using a new NU reinforcement design.

EPG 616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs

11/24/15: The proper use of flags and warning lights on signs in a work zone has been clarified. For projects consisting of nighttime only work, the use of flags is prohibited. Flashing warning lights shall only be used on signs that are post-mounted. The use of flashing warning lights on signs with portable stands is prohibited.

Band Angles

11/24/15: Approved industry-standard band angles allow industry to use an engineered angle when it is financially beneficial.

Route Surveying of Stream Crossings

11/18/15: EPG 238.3.36.3.7 Valley Sections was updated to more closely reflect guidance in HEC-RAS user manual. Guidance for valley sections at stream junctions was also added. In EPG 238.3.36.3.17 Multiple Structures, guidance on Major Streams was replaced with guidance for Multiple Structures (in the same floodplain).

How EPG Guidance is Revised

11/19/15: Proposed revisions to engineering policy are now submitted using the Engineering Policy Revision Request Form. The proposals will be categorized by the Innovation Engineer based on several guidelines.

EPG 1032 Precast Concrete Flared End Sections

11/17/15: Guidance has been updated to allow a concrete pipe manufacturer to use steel fibers in concrete flared end sections instead of standard reinforcing steel.

MoDOT MOU Execution Process

11/6/15: DBE Goals will now be set by project managers or contract administrators on on-call contracts. This replaces the statewide programmatic goal of 13.5% and provides a level playing field for all on-call consultants in the utilization of DBEs.

EPG 236.17 Junkyards

11/4/15: This article has been generally clarified.

EPG 127.25 Maintenance Environmental Policies

10/28/15: Many links were updated along with numerous clarifications.

Alternative Location Proposals

10/27/15: In EPG 236.10.7.3 Alternative Location Proposals, EPG 235.3.4 Right of way as well as the Letter Advertising a Public Hearing, guidance for alternative location proposals has been clarified to reflect current statewide practices.

EPG 127.25.8.2 Lead Mining Chat and EPG 127.22 Off-Site Borrow, Spoil, and Staging Areas

10/23/15: New EPA regulation, applying to 4 counties in SW Missouri, facilitates environmental cleanup.

EPG 238.2.18.6 Recording the Location Survey Plan

10/22/15: The process to complete location survey plan was revised. A reminder mechanism was created to help avoid delays to recording the location survey plans.

EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions

10/16/15: Guidance for permanent utility easement clauses has been changed to allow the conveyance of utility easements to the utility prior to completion of the project.

Travel Safe Zones

10/15/15: In EPG 907.3.3 Procedure, the Travel Safe Zone procedure was clarified.

TM-54

10/15/15: In EPG 106.3.2.54.7 Field Testing, guidance for the preparation of field test mixture samples was brought into conformance with AASHTO T287.

EPG 760.4.2 Notification Requirements

10/14/15: Guidance now reflects that information now collected is only what is currently needed by Motor Carriers and Bridge Divisions and clarifies when the info should be submitted. Also, the Bridge Clearance Report form was updated.

EPG 821.25 Products

10/14/15: Milestone and Perspective information has been revised as a part of the national attention on Monarch butterflies and the general lack of pollinators.

EPG 236.3.3 Right of Way Plan Review

10/13/15: Guidance has been updated to eliminate the need to send a copy of the RW estimate when an A-date is requested. It also eliminates sending a copy of the approved RW plans with the requested A-date.

EPG 236.3.5.2 Expenditure Accounting

9/22/15: The requirements to process payments for temporary or permanent easements was clarified.

EPG 136.3.8.10 Bridge Engineering Assistance Program (BEAP)

9/22/15: Guidance has been updated to conform with new BEAP contract.

Mobilization Cost Estimates

9/18/15: Guidance has been added to EPG 618 Mobilization to help districts with project estimates.

EPG 941.5 Request by a City to Construct a “WELCOME TO” Monument

9/14/15: Guidance has been provided for the revised approval process for the "WELCOME TO" Monument.

Standard Detailing Notes on Bridge Standard Drawings for Prestressed Panels

9/10/15: New references to prestressed truncated end deck panels have been added.

EPG 617.1.1 Temporary Concrete Traffic Barrier – Type F

9/9/15: Guidance for Temporary Concrete Traffic Barrier Standard Drawings now reflects recent crash studies. Of particular note, the Midwest State's Regional Pooled Fund Research Program Report TRP-03-113-03 (revised) recommends the design deflection limit for free standing (unpinned) temporary traffic barrier be set at 2 feet. This would reduce instances in which temporary traffic barrier would require pinning.

EPG 606.1.3.2 Approved Crashworthy End Terminals

9/9/15: Previously, a contractor would typically choose the cheapest end treatment from the approved list and provide that unit whether it was the best solution or not. For that reason, end treatments are now further subdivided to more closely match the hardware to its intended use, performance, reusability and cost of repair.