Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (EPG 643.1)
Line 75: Line 75:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[643.1 Utilities - Status and Liability Acceptance#643.1.2 Utility Status|EPG 643.1.2 Utility Status]]'''
 +
 +
7/24/17:  Guidance has been updated to current practice.
 +
 
'''[[:Category:134 Engineering Professional Services#134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts|EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts]]'''
 
'''[[:Category:134 Engineering Professional Services#134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts|EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts]]'''
  
Line 170: Line 174:
  
 
4/10/17: [[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]] was updated with the new Corps of Engineers Regional Condition, which affects culvert design.
 
4/10/17: [[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]] was updated with the new Corps of Engineers Regional Condition, which affects culvert design.
 
'''[[751.50 Standard Detailing Notes#H7. Slab Drains (Notes for Bridge Standard Drawings)|Slab Drain Standard Detailing Notes]]'''
 
 
4/6/17: The slab drain notes were correlated with all the slab drain standard drawings.
 

Revision as of 12:28, 24 July 2017

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Main Page July 17, 2017.jpg
Rte. 65, the Rebuild, will reconstruct the outside two lanes, outside shoulders and ramps between Kearney and Sunshine Sts. in Springfield. To complete the $7.9 million project by Sept. 1st, Millstone Weber crews will close Rte. 65 in segments, between interchanges, one direction at a time.
Main Page 2 July 17, 2017.jpg
Clarkson Construction crews on the I-435/Rte 210 Interchange Project construct a new diverging diamond interchange and will also widen I-435 to provide three continuous lanes. The project is to be completed in 2018.
Inter. Maint. Worker Kenneth Bradshaw and Sr. Maint. Worker Steve Herndon were ending their shift when they noticed on the side of U.S. 61 a man lying on the ground next to a vehicle. Following safety protocols, they performed CPR on the unconscious motorist, contacted EMS, secured the surrounding road with the TMA and safety cones, and saved the man’s life. They have earned the Meritorious Safety Award. (L to R) Chief Engr. Ed Hassinger, Herndon, Bradshaw and Dist. Engr. Greg Horn at the Wentzville maintenance facility.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late July, the numbers of hits are:
20. EPG 136 161677  10. EPG 751.5 219758
19. EPG 751.40 164889  9. EPG 600 250809
18. EPG 134 165519  8. EPG 616.23 265171
17. EPG 136.4 173937  7. EPG 100 302870
16. EPG 620.2 182524  6. EPG 700 314461
15. EPG 751.50 183542  5. EPG 900 336967
14. EPG 903 187431  4. EPG 101 348473
13. EPG 200 187798  3. EPG 136.12 369573
12. EPG 136.9 204668  2. EPG 751 438527
11. EPG 616 210591  1. EPG Main Page 2864865

EPG 643.1.2 Utility Status

7/24/17: Guidance has been updated to current practice.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts

7/11/17: DocuSign instructions have been made available in the guidance.

EPG 134.2.4 Consultant Solicitation and Selection Process

7/5/17: Guidance reflects the new 2017-2020 on-call consultant categories and lists.

EPG 822 Roadside Vegetation Management

7/5/17: Guidance was updated to promote and enhance pollinator habitat on right of way while addressing traveler safety and noxious weeds.

Asphalt Cement Price Index Adjustments

6/23/17: The updated document "Guidance for Asphalt Cement Price Index Adjustments" has been added to various articles including EPG 402.1.1 Plan Preparation and EPG 403 Asphaltic Concrete Pavement.

Longitudinal Beam Steps

6/19/17: Guidance about reinforcement details for longitudinal beam steps was clarified in EPG 751.31.3.1 Beam Cap and EPG 751.32.4.1 Typical Pile Cap Bent.

EPG 751.22.3.15 Dowel Bars

6/16/17: Guidance was clarified for the length requirements for prestressed girder bridges' dowel bars. "Dowel rods" were re-named "dowel bars".

Guardrail Length of Need Calculator

6/16/17: This new, useful spreadsheet is now available in EPG 606.1 Guardrail.

MSE Wall Plan Responsibilities

6/15/17: Different possible cases for MSE wall excavation were added in EPG 751.6.2.17 Excavation. Division responsibilities for preparing MSE wall plans, computing excavation quantities and locations were added in EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems.

Pavement Marking Material

6/15/17: Guidance in EPG 620 Pavement Marking, EPG 620.1 General, EPG 620.12.2.5 and EPG 1048.2.1 Durable Intersection Marking Materials has been updated to reflect newly available materials. Retroreflectivity requirements for acceptance were also updated.

Additional Asphalt Quantities for Single Lift Overlays

6/9/17: Guidance in EPG 402.1.2 Mix and Quantities and EPG 450.3 Layer Design has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.

Expanding Pipe Types for Pipe Pile Spacers

6/9/17: The types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction was expanded in EPG 751.24.2.1 Design.

EPG 760.4 Vertical Clearance

6/9/17: Guidance was expanded and clarified for the measurement and reporting of vertical clearance.

Redeck Standard Notes

6/8/17: Standard Notes for steel as well as pouring and finishing concrete slabs were added.

EPG 134 Engineering Professional Services

6/8/17: Guidance for eAgreement (electronic vs wet signatures) workflow changes and for incorporating more-than-Taking Care of the System planning studies was updated.

EPG 903.15.3 Heroes Way Designation Program

6/7/17: Guidance was updated to reflect the latest version of the statute concerning this sign.

EPG 103.1 Bid Opening and Award Process

6/2/17: Guidance now reflects that the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.

Consent Decree Initial Setup

5/30/17: The number of disturbed acres when adding a project to the database, the prerequisite dates for the Inspection protocol and the "Date RE Assigned" were clarified on this QRG.

18 in. Embedment in Concrete

5/19/17: Guidance in EPG 751.32 Concrete Pile Cap Intermediate Bents, EPG 751.34 Concrete Pile Cap Non-Integral End Bents, EPG 751.35.3 Dimensions, EPG 751.39 Seal Course and EPG 751.50 G7 for pile cap bent, end bent and seal course was revised to show 18 in. embedment in concrete for all piles.

EPG 236.7 Negotiation

5/12/17: The minimum offer of prompt offer of just compensation has been increased from $300 to $500.

Contract Leveling Course (CLC) and Seal Coat

5/10/17: The Contract Leveling Course and Seal Coat guidelines as well as their respective JSP packages were updated.

EPG 137 Construction Inspection Guidance for Records to be Maintained

5/1/17: Guidance was updated to reflect that project documents are now stored in eProjects.

EPG 460.3.13 Asphalt Binder Sampling and Test Results

4/25/17: New guidance has been provided for handling failing binder samples and for when additional testing may take place. Also, recommended penalties are provided for failing binders at the different levels.

Girder Chair Details

4/11/17: In EPG 751.11.3.6 Girder/Beam Chairs, EPG 751.22.3.10 Closed Intermediate Bent Diaphragms and EPG 751.35.3 Dimensions, girder chair details and end distances from center line of bearing to end of steel and prestressed girders were clarified.

New Corps of Engineers Regional Condition

4/10/17: EPG 750.7.3 Environmental Requirements was updated with the new Corps of Engineers Regional Condition, which affects culvert design.