Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 643.4)
m (EPG 751)
Line 47: Line 47:
 
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late August, the numbers of hits are:'''
 
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late August, the numbers of hits are:'''
 
|-
 
|-
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 163393
+
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 163481
   ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 221826
+
   ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 221942
 
|-
 
|-
|<font size = 2>'''19.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 165670   ||&nbsp;<font size = 2>'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 254765
+
|<font size = 2>'''19.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 165731   ||&nbsp;<font size = 2>'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 254951
 
|-
 
|-
|<font size = 2>'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 168749   ||&nbsp;<font size = 2>'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 266543
+
|<font size = 2>'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 168713   ||&nbsp;<font size = 2>'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 266621
 
|-
 
|-
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 176749     ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 305322
+
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 176786     ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 305479
 
|-
 
|-
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 184318 ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 317879
+
|<font size = 2>'''16.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 184377 ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 318092
 
|-
 
|-
|<font size = 2>'''15.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 186549   ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 339666
+
|<font size = 2>'''15.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 186834   ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 339898
 
|-
 
|-
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 189637   ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 354995
+
|<font size = 2>'''14.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 189762   ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 355359
 
|-
 
|-
|<font size = 2>'''13.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 189767     ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 370623
+
|<font size = 2>'''13.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 190074     ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 370675
 
|-
 
|-
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 205296   ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 442671
+
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 205444   ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 443082
 
|-
 
|-
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 213190   || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2907279
+
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 213414   || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2909950
 
|}
 
|}
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''Bridge Clearances'''
 +
 +
8/31/17: Guidance for bridge clearances was clarified in [[751.1 Preliminary Design#751.1.2.6 Vertical and Horizontal Clearances|EPG 751.1.2.6 Vertical and Horizontal Clearances]], [[751.1 Preliminary Design#751.1.2.16 Bridges Over Railroads|EPG 751.1.2.16 Bridges Over Railroads]], [[751.1 Preliminary Design#751.1.2.19.2 Content|EPG 751.1.2.19.2 Content]], [[751.5 Structural Detailing Guidelines#751.5.2.1.1.5 Features Crossed|EPG 751.5.2.1.1.5 Features Crossed]] and [[751.5 Structural Detailing Guidelines#751.5.2.1.2.7 Features Crossed|EPG 751.5.2.1.2.7 Features Crossed]].  In EPG 751.50 Standard Detailing Notes, notes [[751.50 Standard Detailing Notes#Traffic Handling:|A3.7]] and [[751.50 Standard Detailing Notes#Final clearance - Bridges over Railroads|E3.5]] were also revised.
 +
 
'''[[643.4 Railroads#643.4.1.14 Railroad Crossing Median Islands|EPG 643.4.1.14 Railroad Crossing Median Islands]]'''
 
'''[[643.4 Railroads#643.4.1.14 Railroad Crossing Median Islands|EPG 643.4.1.14 Railroad Crossing Median Islands]]'''
  
Line 165: Line 169:
  
 
6/7/17: Guidance was updated to reflect the latest version of the statute concerning this sign.
 
6/7/17: Guidance was updated to reflect the latest version of the statute concerning this sign.
 
'''[[103.1 Bid Opening and Award Process|EPG 103.1 Bid Opening and Award Process]]'''
 
 
6/2/17: Guidance now reflects that the Bidding and Contract Group no longer allows Permitted Combination of Projects for lettings.
 

Revision as of 08:35, 31 August 2017

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Phillips Hardy crews mill/fill 15 bridges along I-470 from Blue Ridge Blvd. to I-70. This bridge is in Lee’s Summit. Crews dig up the old road surface, replace it with a new one and remove the old concrete barriers so that cross-overs can be constructed.
Clarkson Construction crews work on the $2.6 million bridge replacement on Rte. PP over the North Fork River near Tecumseh.
A new, wider Rte. 171 bridge is being built over Center Creek in Carl Junction. The original bridge, built in 1955, required costly maintenance and is being replaced in the $2.8 million project by Capital Paving & Construction.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late August, the numbers of hits are:
20. EPG 136 163481  10. EPG 751.5 221942
19. EPG 751.40 165731  9. EPG 600 254951
18. EPG 134 168713  8. EPG 616.23 266621
17. EPG 136.4 176786  7. EPG 100 305479
16. EPG 620.2 184377  6. EPG 700 318092
15. EPG 751.50 186834  5. EPG 900 339898
14. EPG 200 189762  4. EPG 101 355359
13. EPG 903 190074  3. EPG 136.12 370675
12. EPG 136.9 205444  2. EPG 751 443082
11. EPG 616 213414  1. EPG Main Page 2909950

Bridge Clearances

8/31/17: Guidance for bridge clearances was clarified in EPG 751.1.2.6 Vertical and Horizontal Clearances, EPG 751.1.2.16 Bridges Over Railroads, EPG 751.1.2.19.2 Content, EPG 751.5.2.1.1.5 Features Crossed and EPG 751.5.2.1.2.7 Features Crossed. In EPG 751.50 Standard Detailing Notes, notes A3.7 and E3.5 were also revised.

EPG 643.4.1.14 Railroad Crossing Median Islands

8/29/17: The speed limit threshold for using raised islands at railroad crossings was reduced from 45 mph to 40 mph and an option was added for locations with a speed limit of 45 mph or greater.

EPG 751.20.3.1 Solid Slabs

8/24/17: The intermediate bent beam cap height for solid slab end span was revised to accommodate commercially available forming systems.

Anchorage of Pile for Seismic Jobs

8/14/17: Guidance for the anchorage of pile for seismic jobs was revised in EPG 751.36.2 Anchorage of Piles for Seismic Categories B, C and D. Also, related standard detailing notes were revised and added.

EPG 625.1.2 Construction Inspection for Sec 625.10 Slab Undersealing

8/10/17: Guidance for the measurement of liquid asphalt cement has been clarified.

EPG 760.1 Bridge Work Over Traffic

8/10/17: New guidance clarifies overhead work on bridges safety policy.

Emergency Vehicle Crossover Dimensions

8/8/17: Guidance in EPG 240 Maintenance and Emergency Crossovers revised the emergency vehicle crossover dimensions to 20' wide with a 10' radius to allow better utilization by fire/EMS responders.

EPG 610 Pavement Smoothness

8/7/17: Guidance is now available for the new Sec 610.

EPG 751.50 Standard Detailing Notes

7/25/17: Notes H2c.1.10 and H2c.1.11 were combined and revised and H2c1.38 was revised to clarify the location of the coil tie being referenced.

EPG 643.1.2 Utility Status

7/24/17: Guidance has been updated to current practice.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts

7/11/17: DocuSign instructions have been made available in the guidance.

EPG 134.2.4 Consultant Solicitation and Selection Process

7/5/17: Guidance reflects the new 2017-2020 on-call consultant categories and lists.

EPG 822 Roadside Vegetation Management

7/5/17: Guidance was updated to promote and enhance pollinator habitat on right of way while addressing traveler safety and noxious weeds.

Asphalt Cement Price Index Adjustments

6/23/17: The updated document "Guidance for Asphalt Cement Price Index Adjustments" has been added to various articles including EPG 402.1.1 Plan Preparation and EPG 403 Asphaltic Concrete Pavement.

Longitudinal Beam Steps

6/19/17: Guidance about reinforcement details for longitudinal beam steps was clarified in EPG 751.31.3.1 Beam Cap and EPG 751.32.4.1 Typical Pile Cap Bent.

EPG 751.22.3.15 Dowel Bars

6/16/17: Guidance was clarified for the length requirements for prestressed girder bridges' dowel bars. "Dowel rods" were re-named "dowel bars".

Guardrail Length of Need Calculator

6/16/17: This new, useful spreadsheet is now available in EPG 606.1 Guardrail.

MSE Wall Plan Responsibilities

6/15/17: Different possible cases for MSE wall excavation were added in EPG 751.6.2.17 Excavation. Division responsibilities for preparing MSE wall plans, computing excavation quantities and locations were added in EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems.

Pavement Marking Material

6/15/17: Guidance in EPG 620 Pavement Marking, EPG 620.1 General, EPG 620.12.2.5 and EPG 1048.2.1 Durable Intersection Marking Materials has been updated to reflect newly available materials. Retroreflectivity requirements for acceptance were also updated.

Additional Asphalt Quantities for Single Lift Overlays

6/9/17: Guidance in EPG 402.1.2 Mix and Quantities and EPG 450.3 Layer Design has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.

Expanding Pipe Types for Pipe Pile Spacers

6/9/17: The types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction was expanded in EPG 751.24.2.1 Design.

EPG 760.4 Vertical Clearance

6/9/17: Guidance was expanded and clarified for the measurement and reporting of vertical clearance.

Redeck Standard Notes

6/8/17: Standard Notes for steel as well as pouring and finishing concrete slabs were added.

EPG 134 Engineering Professional Services

6/8/17: Guidance for eAgreement (electronic vs wet signatures) workflow changes and for incorporating more-than-Taking Care of the System planning studies was updated.

EPG 903.15.3 Heroes Way Designation Program

6/7/17: Guidance was updated to reflect the latest version of the statute concerning this sign.