Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (QRG Change Orders – Mobilization and Contract Bond)
m
(910 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1080px|center]]
+
{|
 
+
|colspan="3" width=1030px| [[Image:EPG 2013b.jpg|1020px|center]]  
 
 
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1080px" align="center"
 
 
|-
 
|-
|rowspan="2" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white"> ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">'''
+
|colspan="3"| [[image:Main Page Mission.jpg|1020px|center]]
 
|-
 
|-
| ||align="left" colspan="2"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
+
|colspan="3"| [[image:Main Page Welcome.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="background:#F8F8FF" colspan="1" rowspan="1" width=830px|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Highway Safety & Traffic], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning] and [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] guidance.|| valign="center" style="border: 7px solid #A9A9A9" align="right" width=150px| '''<Big><center>[[media:MASH Implementation.pdf|MoDOT's MASH<br/>Implementation<br/>Information]]</center> </Big>'''
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
+
|colspan="3" background:white|
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#74BAAC" width="830px" align="center" rowspan="1"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]<br/>'''<font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">'''</i></font color="white"><br/>'''<font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white"></Big>||rowspan="1" valign="center" width="180px" cellspacing="3" cellpadding="3" style="border: 9px solid #DCEDEA; background:#f5f5f5" align="center" rowspan="1"|'''<big><font color="white"><i>[[Recent Policy Changes in the EPG|RECENT POLICY CHANGES<br/>IN THE EPG]]</i></font color="white"></big>'''
 +
|}
 +
{|style="padding: 0.3em; margin-left:0px; border:2px solid #a9a9a9; text-align:center; font-size: 130%; background:#f5f5f5" width="1040px"|}
 +
|'''Information for Digitally Signing Documents'''
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayreadme.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [http://www.modot.org/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white">
+
|style="text-align: left; font-size: 90%;"|
|}
+
There are several documents (internal and external) that can be signed with digital signatures through PDF editing software. ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED. First you must set up your digital signature ID:
  
 +
- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) [http://epg.modot.mo.gov/forms/CM/Digital_Signature_for_Adobe_Reader_DC_or_Pro_DC.docx Digital signature for Adobe Reader DC or Pro DC] to set up your digital signature ID.  If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature ID.  Unless you work in Construction and Materials, skip Section 3 as well.  Page 7 of these instructions will also look a little different due to software updates.  The Sign Document window will most likely be Sign With a Digital ID; click on Continue.  If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image).  Otherwise you will enter your password and click on Sign. 
  
 +
- If you are a Bluebeam Revu user, please see [[media:Creating Digital IDs in Bluebeam Revu(2019).pdf|Creating Digital IDs in Bluebeam Revu]] to set up your digital signature ID.
  
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
+
The following documents may be signed with the digital signatures methods above:
{| cellspacing="3"
+
:::*Professional Services Committee (PSC) Letters/Approvals
|- valign="top" width="100%"
+
:::*Design Exceptions
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
+
:::*Letters to external partners
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
+
:::*Expense Reports
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|colspan="2" |    [[image:Main Page Jan 6, 2015.jpg|center|390px|thumb|<center>'''  Distr. Safety and Health Manager Lisa Lamons speaks with [http://fox2now.com/ St. Louis Fox 2 News] about precautions MoDOT employees take before working outside in low temperatures.  '''  </center>]]
 
|-
 
|colspan="2" |    [[image:Main Page Dec 31, 2014.jpg|center|390px|thumb|<center>'''  Sr. Maintc. Workers Keith Gilmore (left) and Laurie Hardie patch a Rte. Y pothole near Amsterdam.  '''  </center>]]
 
|-
 
|colspan="2" |    [[image:Main Page Dec 24, 2014.jpg|center|390px|thumb|<center>'''  [http://clarksonconstruction.com/ Clarkson Construction Co.] crews pour the deck on the [http://www.modot.org/kansascity/major_projects/ManchesterBridgeatI-70.htm Manchester Bridge project]. This project is scheduled to be finished in 2015.  '''  </center>]]
 
|}
 
 
 
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry. 
 
 
 
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://wwwi/intranet/rw/ Right of Way], [http://wwwi/design/default.htm Design], [http://wwwi/intranet/br/default.htm Bridge], [http://wwwi/intranet/cm/ Construction], [http://wwwi/intranet/tr/ Traffic] and [http://wwwi/maintenance/ Maintenance] manuals.
 
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
+
If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.
  
{| style="margin: 1em auto 1em auto"
+
This information will be updated as needed. Please check back often.
|-
 
|colspan="2" |    [[image:Main Page Dec 22, 2014.jpg|center|390px|thumb|<center>'''  Ground was broken by state and local officials for the [http://www.modot.org/central/news_and_information/District5Release.shtml?action=displaySSI&newsId=199726 Lafayette St. interchange project] on U.S. 50 in Jefferson City. [http://emerysapp.com/ Emery Sapp and Sons] is the contractor on this project, which is the last major transportation improvement project scheduled for central Missouri due to the severe decline in state road and bridge projects funding.      '''  </center>]]
 
|}
 
  
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
+
'''Other helpful documents and tips:'''
|-
+
:::*[[media:Digital Signatures for Design Documents.pdf|Digital Signatures for Design Documents]] - this does not work with most Adobe Reader versions (contributed by Christopher Kelly, TPM in SL District).
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early January, the numbers of hits are:'''
+
:::*See E-Construction general provision in the most recent version of the [http://www.modot.org/media/26947 General Provisions and Supplemental Specifications] for additional digital signature information (suggested by Christopher Crocker, TPD in SE District).
|-
+
:::*[[media:Digitally Signing Preliminary Plans in ProjectWise.pdf|Digitally Signing Preliminary Plans in ProjectWise]] - this does not work with all versions of Adobe Acrobat Pro/DC (contributed by Don Saiko, TPM/Stacy Reese, ADE in SW District).
|'''20.'''  [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 103858 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 154586
 
|-
 
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 109531      ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 187975
 
|-
 
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 113877  ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 193601
 
|-
 
|'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 115239    ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 195385
 
|-
 
|'''16.'''    [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 115351    ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 201298
 
 
|-
 
|-
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 115734  ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 232617
 
 
|-
 
|-
|'''14.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 122264    || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 241347
 
|-
 
|'''13.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 122522  || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 260153
 
|-
 
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 136799 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 298896
 
|-
 
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 148617  ||'''1.''' EPG Main Page, 1813655
 
|}
 
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
'''Updated QRG'''
 
 
1/7/15: In [[:Category:101 Standard Forms#Quick Reference Guides (QRGs)|EPG 101 Standard Forms]], the QRG [[media:Change Orders – Mobilization and Contract Bond 2015.docx|Change Orders – Mobilization and Contract Bond]] was updated because our new agreement with FHWA eliminates the need to send any Level 1 or 2 change orders to FHWA for review. 
 
 
'''[[:Category:109 Measurement and Payment#109.12 Change Orders (for Sec 109.12)|EPG 109.12 Change Orders]]'''
 
 
1/6/15: Guidance was revised to conform with the new change order approval criteria that reduces the number of change orders reviewed by FHWA and will improve the efficiency of the review process.
 
 
'''[[751.37 Drilled Shafts#751.37.6.1 Reinforcement Design|EPG 751.37.6.1 Reinforcement Design]]'''
 
 
1/2/15: The guidance for minimum rock socket length requirements and the [[751.37 Drilled Shafts#Commentary on EPG 751.37.6 Structural Resistance of Drilled Shafts|commentary on this guidance]] have been clarified.
 
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#110.3 Prevailing Wages and Records (Guidance for Sec 110.3)|EPG 110.3 Prevailing Wages and Records]]'''
 
 
12/26/14: Guidance was revised to increase the number of payrolls that are checked for compliance.
 
 
'''Project Documentation'''
 
 
12/24/14: Guidance in [[:Category:150 Quality Management#150.1.1 Folder Structure|EPG 150.1.1 Folder Structure and EPG 150.1.2  File Naming Convention]] was updated to accommodate SharePoint.
 
 
'''[http://epg.modot.org/index.php?title=Category:109_Measurement_and_Payment#109.12_Change_Orders_.28for_Sec_109.12.29 EPG 109.12 Change Orders]'''
 
 
12/24/14: Recommended documentation for [[:Category:109 Measurement and Payment#When a change order involves|change orders]] and [[:Category:109 Measurement and Payment#This change order language|time adjustments]] has been added.
 
 
'''[[751.6 General Quantities#751.6.2.7 Non-Destructive Testing (NDT) for Cover Plates|EPG 751.6.2.7 Non-Destructive Testing (NDT) for Cover Plates]]'''
 
 
12/22/14: NDT is required for all top cover plates when a bridge is to be redecked. Also, guidance is now provided for when bottom flange cover plates are present.
 
 
'''Fiber Reinforced Polymer Slab Drains'''
 
 
12/18/14: In [http://epg.modot.org/index.php?title=751.10_General_Superstructure#751.10.3_Bridge_Deck_Drainage_-_Slab_Drains EPG 751.10.3 Bridge Deck Drainage – Slab Drains], [http://epg.modot.org/index.php?title=751.40_Widening_and_Repair_%28Non-LRFD%29#751.40.5_Drainage EPG 751.40.5 Drainage] and [http://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#H7._Slab_Drains EPG 751.50 H7 Slab Drains], Fiber Reinforced Polymer slab drain details and guidance was incorporated into the articles to provide another material option.
 
 
'''[[media:Fig 104.7 2014.doc|Cost Estimate Guide for Rural Preliminary Design]]'''
 
 
12/15/14: In [[104.7 Estimates|EPG 104.7 Estimates]], this document has been updated with figures reflecting new Maintenance Treatment per mile costs.
 
 
'''New QRG'''
 
 
12/10/14: A new QRG, [[media:Liquidated Damage Adjustments.docx|Liquidated Damage Adjustments]], has been added to [[:Category:101 Standard Forms#Liquidated Damage Adjustments|EPG 101 Standard Forms]].
 
 
'''[[:Category:747 Bridge Reports and Layouts|EPG 747 Bridge Reports and Layouts]]'''
 
 
12/9/14: EPG 748.7 Bridge Reports and Layouts was moved to EPG 747. (The remaining EPG 748 articles were renumbered as needed.) EPG 747's guidance was generally rewritten. The Bridge Survey Report Form was revised to reflect its use for all structures instead of only stream crossings. A Bridge Survey Checklist was also developed for district use.
 
 
'''EPG 751.50 Standard Detailing Notes [http://epg.modot.mo.gov/index.php?title=751.50_Standard_Detailing_Notes#A1._Design_Specifications.2C_Loadings_.26_Unit_Stresses A1] and [http://epg.modot.mo.gov/index.php?title=751.50_Standard_Detailing_Notes#A2._Concrete_Box_Culverts_and_Other_Type_Structures A2]'''
 
 
12/8/14: Notes A1 and A2 were simplified. Note A2.12 was deleted since it is no longer needed.
 
 
'''[[748.6 High Water Surface Elevation|EPG 748.6 High Water Surface Elevation]]'''
 
 
12/5/14: The term "Design High Water" was revised to "Design Flood Elevation" or "Normal High Water" and the term "High Water" revised to "Base Flood Elevation".
 
 
'''[[:Category:170 Maintenance Activity Planning Guidelines|EPG 170 Maintenance Activity Planning Guidelines]]'''
 
 
12/3/14: Updated the [[:Category:170 Maintenance Activity Planning Guidelines#Work Scheduling Guidelines|Work Scheduling Guide]] and [[:Category:170 Maintenance Activity Planning Guidelines#Index of Printable Planning Guides|Index of Printable Planning Guides]]. References to scrub seal and linseed oil treatments were removed. R328 Bridge Jt. Maintc. and R329 Bridge Cleaning & Flushing codes were added.
 
 
'''[[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracting (JOC)]]'''
 
 
12/3/14: All of the JOC JSPs have been updated. Among the revisions, prices have been updated and some guard cable options have been added.
 
 
'''[[751.5 Structural Detailing Guidelines|EPG 751.5 Structural Detailing Guidelines]]'''
 
 
12/1/14: EPG 751.5 has been generally rewritten and retitled "Structural Detailing Guidelines".
 
 
'''[[751.10 General Superstructure#751.10.1.10 Slab Offsets for Curved Bridges|EPG 751.10.1.10 Slab Offsets for Curved Bridges]]'''
 
 
12/1/14: Guidance was updated and "Profile Grade & Vertical Curve Data" was retitled as "Slab Offsets for Curved Bridges".
 
 
'''[[751.1 Preliminary Design|EPG 751.1 Preliminary Design]]'''
 
 
12/1/14: This article was updated to current practice. Moved "Vertical and Horizontal Clearance" from EPG 748.7 to [[751.1 Preliminary Design#751.1.2.5 Vertical and Horizontal Clearance|EPG 751.1.2.5]] and renumbered subsequent articles.
 
 
'''Inspection of Bituminous Mixing Plants'''
 
 
11/25/14: In [[460.3 Plant Inspection#460.3.11 Reclaimed Asphalt Pavement (RAP)|EPG 460.3.11 Reclaimed Asphalt Pavement (RAP)]], guidance was updated to replace outdated test method AASHTO TP58 with AASHTO T 327.
 
 
'''New QRG'''
 
 
11/20/14: A new QRG, Land Disturbance Project Information, has been added to [[:Category:101 Standard Forms#Land Disturbance Project Information|EPG 101 Standard Forms]].
 
 
'''[[media:Change Order Codes 2014.doc|Change Order Codes]]'''
 
 
11/18/14: The definition of "Routine Adjustment" was revised in the Change Order Codes.
 
 
'''Standard Detailing Note for Epoxy Coated Reinforcing Steel'''
 
 
11/18/14:  A note pertaining to [[751.50 Standard Detailing Notes#(C1.15)|C1.15]] was deleted and Note C1.16 was deleted because the requirement for adding epoxy coated test bars to the bar bill for bridges has been rescinded.
 
 
'''Contract Leveling Course'''
 
 
11/18/14:  The Contract Leveling Course (CLC) Guidelines and JSPs have been updated in [[:Category:402 Bituminous Surface Leveling|EPG 402 Bituminous Surface Leveling]].  Primarily, the Modifications to Surface Level Mix Mixtures Containing RAP and RAS JSP and the Safety Plan JSP are no longer required.
 
 
'''Outdoor Advertising Permitting'''
 
 
11/14/14: Guidance was added in [[236.16 Outdoor Advertising#236.16.15.2 Indemnification|EPG 236.16.15.2 Indemnification]] to reflect that applicants for a vegetation permit must now inspect the property.
 
 
'''Bidding Documents'''
 
 
11/7/14:  In [[:Category:102 Bidding Requirements and Conditions|EPG 102 Bidding Requirements and Conditions]], references to Indox were removed.
 

Revision as of 08:59, 9 April 2020

EPG 2013b.jpg
Main Page Mission.jpg
Main Page Welcome.jpg
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.
MoDOT's MASH
Implementation
Information
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.
RECENT POLICY CHANGES
IN THE EPG
Information for Digitally Signing Documents

There are several documents (internal and external) that can be signed with digital signatures through PDF editing software. ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED. First you must set up your digital signature ID:

- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) Digital signature for Adobe Reader DC or Pro DC to set up your digital signature ID. If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature ID. Unless you work in Construction and Materials, skip Section 3 as well. Page 7 of these instructions will also look a little different due to software updates. The Sign Document window will most likely be Sign With a Digital ID; click on Continue. If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image). Otherwise you will enter your password and click on Sign.

- If you are a Bluebeam Revu user, please see Creating Digital IDs in Bluebeam Revu to set up your digital signature ID.

The following documents may be signed with the digital signatures methods above:

  • Professional Services Committee (PSC) Letters/Approvals
  • Design Exceptions
  • Letters to external partners
  • Expense Reports

If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.

This information will be updated as needed. Please check back often.

Other helpful documents and tips: