Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m
(420 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1030px|center]]
+
{|
 
+
|colspan="3" width=1030px| [[Image:EPG 2013b.jpg|1020px|center]]  
 
 
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"
 
 
|-
 
|-
|rowspan="2" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white"> ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">'''
+
|colspan="3"| [[image:Main Page Mission.jpg|1020px|center]]
 
|-
 
|-
| ||align="left" colspan="2"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
+
|colspan="3"| [[image:Main Page Welcome.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="background:#F8F8FF" colspan="1" rowspan="1" width=830px|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Highway Safety & Traffic], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning] and [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] guidance.|| valign="center" style="border: 7px solid #A9A9A9" align="right" width=150px| '''<Big><center>[[media:MASH Implementation.pdf|MoDOT's MASH<br/>Implementation<br/>Information]]</center> </Big>'''
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
+
|colspan="3" background:white|
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#74BAAC" width="830px" align="center" rowspan="1"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]<br/>'''<font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">'''</i></font color="white"><br/>'''<font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white"></Big>||rowspan="1" valign="center" width="180px" cellspacing="3" cellpadding="3" style="border: 9px solid #DCEDEA; background:#f5f5f5" align="center" rowspan="1"|'''<big><font color="white"><i>[[Recent Policy Changes in the EPG|RECENT POLICY CHANGES<br/>IN THE EPG]]</i></font color="white"></big>'''
|-
 
|colspan="4" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayreadme.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [http://www.modot.org/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white">
 
 
|}
 
|}
 
+
{|style="padding: 0.3em; margin-left:0px; border:2px solid #a9a9a9; text-align:center; font-size: 130%; background:#f5f5f5" width="1040px"|}
 
+
|'''Information for Digitally Signing Documents'''
 
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
|- valign="top" width="100%"
 
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
 
|-
 
|-
|colspan="2" |    [[image:Main Page January 18, 2017.jpg|center|400px|thumb|<center>'''  [https://www.facebook.com/MoDOTCentralMissouriDistrict Gov. Eric Greitens showed his appreciation to MoDOT and Missouri State Highway Patrol employees] for their life-saving efforts during the ice storm.      ''' </center> <br/>
+
|style="text-align: left; font-size: 90%;"|
[[image:Main Page January 18b, 2017.jpg|center|400px]]<br/>
+
There are several documents (internal and external) that can be signed with digital signatures through PDF editing software.  ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED. First you must set up your digital signature ID:
[[image:Main Page January 18c, 2017.jpg|center|400px]]<br/>
 
[[image:Main Page January 18d, 2017.jpg|center|400px]] ]]
 
|}
 
  
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promisedInnovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.   
+
- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) [http://epg.modot.mo.gov/forms/CM/Digital_Signature_for_Adobe_Reader_DC_or_Pro_DC.docx Digital signature for Adobe Reader DC or Pro DC] to set up your digital signature ID.  If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature IDUnless you work in Construction and Materials, skip Section 3 as well.  Page 7 of these instructions will also look a little different due to software updates.  The Sign Document window will most likely be Sign With a Digital ID; click on Continue.  If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image).  Otherwise you will enter your password and click on Sign.   
  
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals.
+
- If you are a Bluebeam Revu user, please see [[media:Creating Digital IDs in Bluebeam Revu(2019).pdf|Creating Digital IDs in Bluebeam Revu]] to set up your digital signature ID.
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
+
The following documents may be signed with the digital signatures methods above:
 +
:::*Professional Services Committee (PSC) Letters/Approvals
 +
:::*Design Exceptions
 +
:::*Letters to external partners
 +
:::*Expense Reports
  
 +
If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.
  
 +
This information will be updated as needed. Please check back often.
  
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
+
'''Other helpful documents and tips:'''
|-
+
:::*[[media:Digital Signatures for Design Documents.pdf|Digital Signatures for Design Documents]] - this does not work with most Adobe Reader versions (contributed by Christopher Kelly, TPM in SL District).
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late January, the numbers of hits are:'''
+
:::*See E-Construction general provision in the most recent version of the [http://www.modot.org/media/26947 General Provisions and Supplemental Specifications] for additional digital signature information (suggested by Christopher Crocker, TPD in SE District).
|-
+
:::*[[media:Digitally Signing Preliminary Plans in ProjectWise.pdf|Digitally Signing Preliminary Plans in ProjectWise]] - this does not work with all versions of Adobe Acrobat Pro/DC (contributed by Don Saiko, TPM/Stacy Reese, ADE in SW District).
|'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 149739    ||'''10.''' [[751.5 Standard Details|EPG 751.5]], 200400
 
|-
 
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 153298    ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 236154
 
|-
 
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 156956    ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 256356
 
|-
 
|'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 165058    ||'''7.''' [[:Category:100 GENERAL|EPG 100]], 288266
 
|-
 
|'''16.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 165866    ||'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 298471
 
|-
 
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 171928    ||'''5.'''  [[:Category:101 Standard Forms|EPG 101]], 316225
 
|-
 
|'''14.'''    [[:Category:903 Highway Signing|EPG 903]], 177934      || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 321109
 
|-
 
|'''13.'''    [[:Category:200 GEOMETRICS|EPG 200]], 179901  || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 349821
 
 
|-
 
|-
|'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 191864  ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 405189
 
 
|-
 
|-
|'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]], 200177  ||'''1.''' EPG Main Page, 2634515
 
|}
 
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.87 Temporary Rumble Strips (MUTCD 6F.87)|EPG 616.6.87 Temporary Rumble Strips]]'''
 
 
1/17/17: Guidance has been updated and expanded.
 
 
'''[[171.2 Buildings and Grounds#B&G(D2) Weigh Station Obligations|EPG 171.2, B&G(D2) Weigh Station Obligations]]'''
 
 
1/11/17: Due to a new MOU with MSHP, snow and ice removal will be performed for all paved surfaces immediately adjacent to weigh station facilities.
 
 
'''[[:#134.1.3 Consultant Qualification|EPG 134.1.3 Consultant Qualification]]'''
 
 
1/4/17: Guidance has been clarified that a firm is not required to submit a certificate of authority to become prequalified when the firm does work outside the jurisdiction of the MO Board for APEPLSPLA.
 
 
'''[[:Category:756 Seismic Design|EPG 756 Seismic Design]]'''
 
 
1/4/17: The Bridge Seismic Design Process Flowchart has been revised.
 
 
'''[[751.40 Widening and Repair (LFD and Not Updated)#Bent Cap Shear Strengthening using FRP Reinforcement|EPG 751.40.2.3 Substructure Repair]]'''
 
 
12/6/16: General guidance was added for rehabilitating existing bent cap using fiber reinforced polymer reinforcement for shear strengthening.
 
 
'''[[460.3 Plant Inspection#460.3.13 Asphalt Binder Sampling|EPG 460.3.13 Asphalt Binder Sampling]]'''
 
 
12/5/16: New guidance for submission of initial daily binder sample will ensure timely testing.
 
 
'''Right of Way Acquisition Authority'''
 
 
12/5/16: New guidance for federally funded early acquisition of a parcel is now available in [[236.3 Administration#Federally Funded Early Acquisition|EPG 236.3.4.4 Advance Acquisition - Hardship and Protective Buying]].
 
 
'''Form Liner Requirements for Large Block Wall'''
 
 
12/5/16: Guidance in [http://epg.modot.org/index.php?title=Category:747_Bridge_Reports_and_Layouts#747.1.6.2_Mechanically_Stabilized_Earth_.28MSE.29_Wall_Systems EPG 747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems] and [http://epg.modot.org/index.php?title=751.24_LFD_Retaining_Walls#751.24.2_Mechanically_Stabilized_Earth_.28MSE.29_Walls EPG 751.24.2 Mechanically Stabilized Earth (MSE) Walls] was clarified for form liner requirements for large block walls.
 
 
'''[[751.50 Standard Detailing Notes#(J1.20a)|Standard Detailing Note J1.20a]]'''
 
 
11/22/16: The shop drawing requirements in this note were clarified.
 
 
'''Hairpin Bars'''
 
 
11/22/16: Hairpin guidance in [[751.10 General Superstructure#751.10.1.14 Girder Haunch Reinforcement|EPG 751.10.1.14 Girder Haunch Reinforcement]] was expanded and clarified, especially that their location should be clearly shown and that these bars should be included in the bill of reinforcing steel.
 
 
'''Girder Reinforcement'''
 
 
11/22/16: In [[751.22 P/S Concrete I Girders|EPG 751.22 P/S Concrete I Girders]], guidance for shear reinforcement was updated to current practice. Guidance for A1 reinforcement was revised to not use the WWR located in the flange of NU girders.
 
 
'''MoDOT and the Environment'''
 
 
11/10/16:  Guidance in [[127.9 Floodplain Management and the Regulatory Floodway|EPG 127.9 Floodplain Management and the Regulatory Floodway]], [[127.11 Farmland Conversion|EPG 127.11 Farmland Conversion]] and [[127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties|EPG 127.21 Federal Emergency Management Agency (FEMA) Flood Buyout Properties]] was updated to reflect new processes and forms.
 
 
'''[[:Category:101 Standard Forms#Land Disturbance Deficiency|New QRGs]]'''
 
 
11/9/16:  The Land Disturbance QRG was replaced with three new Land Disturbance QRGs.
 
 
'''[[236.6 Appraisal and Appraisal Review#236.6.2 Scope of Assignment|EPG 236.6.2 Scope of Assignment]]'''
 
 
11/9/16:  Guidance was updated to reflect current practices. "Scope of Assignment for Simple Assignment or Experienced Staff and Fee" was removed.
 
 
'''[[106.16 Special Designs|EPG 106.16 Special Designs]]'''
 
 
11/8/16: Guidance for handling drawings from suppliers was expanded.
 
 
'''[[643.2 Local Utility Adjustments - Public and Private#643.2.16.1 Buy America Guidelines for Utilities|EPG 643.2.16.1 Buy America Guidelines for Utilities]]'''
 
 
11/1/16:  Guidance has reverted to the previous, more relaxed, FHWA interpretation of Buy America.
 
 
'''Title Datum and Allied Services'''
 
 
11/1/16: Guidance in [[236.4 Description Writing and Titles#236.4.4.5 Agreements Between Commission and Abstractor or Title Companies|EPG 236.4.4.5 Agreements Between Commission and Abstractor or Title Companies]] and [[236.4 Description Writing and Titles#236.4.4.7 Procedure for Obtaining Title Services|EPG 236.4.4.7 Procedure for Obtaining Title Services]] updated the agreements between Commission and abstractor or title companies to be current with business practices.
 
 
'''[[616.16 Law Enforcement Services|EPG 616.16 Law Enforcement Services]]'''
 
 
11/1/16: Guidance provided for incorporating law enforcement into contractor projects and maintenance operation work zones.
 
 
'''[[:Category:153 Agreements and Contracts#153.1 The Agreement Process|EPG 153 Agreements and Contracts]]'''
 
 
10/26/16: Guidance has been updated due to implementation of eAgreements.
 
 
'''[[751.50 Standard Detailing Notes#(H3.29.1)|EPG 751.50, H3. Bearings]] and [[751.50 Standard Detailing Notes#Making End Bents Integral|I1.51]]'''
 
 
10/25/16: Notes H3.29.1, H3.49.1 and I1.51 were revised.
 
 
'''[[236.5 Property Management#236.5.21.5 Full Disclosure Clause|EPG 236.5.21.5 Full Disclosure Clause]]'''
 
 
9/29/16: The full disclosure clause was updated to reflect how MoDOT currently handles property conveyances.
 
 
'''[[751.5 Structural Detailing Guidelines#751.5.1.4 Contract Addendums and Construction Changes|EPG 751.5.1.4 Contract Addendums and Construction Changes]]'''
 
 
9/29/16: Guidance for change orders to bridge plans has been revised.
 
 
'''[[751.36 Driven Piles#751.36.2 Steel Pile|EPG 751.36.2 Steel Pile]]'''
 
 
9/28/16: The cast in place pipe pile wall thicknesses commonly available were clarified.
 
 
'''Value Engineering'''
 
 
9/23/16:  [[:Category:130 Value Engineering#130.1 Discussion|EPG 130.1 Discussion]] was updated to reflect the tracker identified goal. A new [http://sharepoint/sites/de/Innovations/_layouts/WordViewer.aspx?id=/sites/de/Innovations/Lead/CD/Practical_Value_Analysis.docx&Source=http%3A%2F%2Fsharepoint%2Fsites%2Fde%2FInnovations%2FLead%2FForms%2FAllItems%2Easpx%3FRootFolder%3D%252Fsites%252Fde%252FInnovations%252FLead%252FCD%26FolderCTID%3D0x01200040529586DDA445459FBDE05CAAE182DA%26View%3D%7BFF3B22CF-E8F2-4A04-9F68-7C65ACD3E8DF%7D&DefaultItemOpen=1 workbook is available for a district-led Value Analysis].
 
 
'''Preliminary Design of a Bridge'''
 
 
9/23/16: [[751.1 Preliminary Design#751.1.1 Overview|EPG 751.1.1 Overview]] has been updated to reflect current practice.
 

Revision as of 08:59, 9 April 2020

EPG 2013b.jpg
Main Page Mission.jpg
Main Page Welcome.jpg
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.
MoDOT's MASH
Implementation
Information
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.
RECENT POLICY CHANGES
IN THE EPG
Information for Digitally Signing Documents

There are several documents (internal and external) that can be signed with digital signatures through PDF editing software. ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED. First you must set up your digital signature ID:

- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) Digital signature for Adobe Reader DC or Pro DC to set up your digital signature ID. If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature ID. Unless you work in Construction and Materials, skip Section 3 as well. Page 7 of these instructions will also look a little different due to software updates. The Sign Document window will most likely be Sign With a Digital ID; click on Continue. If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image). Otherwise you will enter your password and click on Sign.

- If you are a Bluebeam Revu user, please see Creating Digital IDs in Bluebeam Revu to set up your digital signature ID.

The following documents may be signed with the digital signatures methods above:

  • Professional Services Committee (PSC) Letters/Approvals
  • Design Exceptions
  • Letters to external partners
  • Expense Reports

If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.

This information will be updated as needed. Please check back often.

Other helpful documents and tips: