Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m
(353 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1030px|center]]
+
{|
 
+
|colspan="3" width=1030px| [[Image:EPG 2013b.jpg|1020px|center]]  
 
 
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"
 
 
|-
 
|-
|rowspan="2" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white"> ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">'''
+
|colspan="3"| [[image:Main Page Mission.jpg|1020px|center]]
 
|-
 
|-
| ||align="left" colspan="2"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
+
|colspan="3"| [[image:Main Page Welcome.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="background:#F8F8FF" colspan="1" rowspan="1" width=830px|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Highway Safety & Traffic], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning] and [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] guidance.|| valign="center" style="border: 7px solid #A9A9A9" align="right" width=150px| '''<Big><center>[[media:MASH Implementation.pdf|MoDOT's MASH<br/>Implementation<br/>Information]]</center> </Big>'''
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
+
|colspan="3" background:white|
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#74BAAC" width="830px" align="center" rowspan="1"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]<br/>'''<font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">'''</i></font color="white"><br/>'''<font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white"></Big>||rowspan="1" valign="center" width="180px" cellspacing="3" cellpadding="3" style="border: 9px solid #DCEDEA; background:#f5f5f5" align="center" rowspan="1"|'''<big><font color="white"><i>[[Recent Policy Changes in the EPG|RECENT POLICY CHANGES<br/>IN THE EPG]]</i></font color="white"></big>'''
|-
 
|colspan="4" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayreadme.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [http://www.modot.org/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white">
 
 
|}
 
|}
 
+
{|style="padding: 0.3em; margin-left:0px; border:2px solid #a9a9a9; text-align:center; font-size: 130%; background:#f5f5f5" width="1040px"|}
 
+
|'''Information for Digitally Signing Documents'''
 
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
|- valign="top" width="100%"
 
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|[[image:Main Page May 22, 2017.jpg|center|400px|thumb|<center>''' Above, flooding damage to Dallas County Rte. E near Celt following recent historic flooding... '''<br/>[[image:Main Page 2 May 22, 2017.jpg|center|400px]]
 
'''Quickly followed by effective repair work from MoDOT crews.'''<br/>[[image:Main Page 3 May 22, 2017.jpg|center|400px]]</center>]]
 
 
|-
 
|-
|[[image:Main Page May 19, 2017.jpg|center|400px|thumb|<center> '''  Work continues on the [http://www.modot.org/stlouis/major_projects/Route47MissouriRiverBridge/ Rte. 47 Missouri River Bridge] construction siteThe project, awarded to [http://www.alberici.com/about/Pages/News-Detail.aspx?nid=59 Alberici] in 2016 for almost $63 million, will replace the narrow 1936 bridge by late 2018. The new bridge will have two 12 ft. lanes, 10 ft. shoulders on the inside and outside, and a 10 ft. protected bike/pedestrian path as well as decorative lighting, railing details and decorative columns.    </center> ''']]
+
|style="text-align: left; font-size: 90%;"|
|}
+
There are several documents (internal and external) that can be signed with digital signatures through PDF editing software. ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNEDFirst you must set up your digital signature ID:
  
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promisedInnovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.   
+
- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) [http://epg.modot.mo.gov/forms/CM/Digital_Signature_for_Adobe_Reader_DC_or_Pro_DC.docx Digital signature for Adobe Reader DC or Pro DC] to set up your digital signature ID.  If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature IDUnless you work in Construction and Materials, skip Section 3 as well.  Page 7 of these instructions will also look a little different due to software updates.  The Sign Document window will most likely be Sign With a Digital ID; click on Continue.  If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image).  Otherwise you will enter your password and click on Sign.   
  
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals.
+
- If you are a Bluebeam Revu user, please see [[media:Creating Digital IDs in Bluebeam Revu(2019).pdf|Creating Digital IDs in Bluebeam Revu]] to set up your digital signature ID.
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Over 40 million hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
+
The following documents may be signed with the digital signatures methods above:
 +
:::*Professional Services Committee (PSC) Letters/Approvals
 +
:::*Design Exceptions
 +
:::*Letters to external partners
 +
:::*Expense Reports
  
 +
If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.
  
 +
This information will be updated as needed. Please check back often.
  
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
+
'''Other helpful documents and tips:'''
|-
+
:::*[[media:Digital Signatures for Design Documents.pdf|Digital Signatures for Design Documents]] - this does not work with most Adobe Reader versions (contributed by Christopher Kelly, TPM in SL District).
|colspan="5" | <font size = 2> '''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early June, the numbers of hits are:'''
+
:::*See E-Construction general provision in the most recent version of the [http://www.modot.org/media/26947 General Provisions and Supplemental Specifications] for additional digital signature information (suggested by Christopher Crocker, TPD in SE District).
|-
+
:::*[[media:Digitally Signing Preliminary Plans in ProjectWise.pdf|Digitally Signing Preliminary Plans in ProjectWise]] - this does not work with all versions of Adobe Acrobat Pro/DC (contributed by Don Saiko, TPM/Stacy Reese, ADE in SW District).
|<font size=2>'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]]||<font size = 2> 158848  ||&nbsp;<font size = 2>'''10.''' [[751.5 Standard Details|EPG 751.5]]|| align="right"| <font size = 2> 216228
 
|-
 
|<font size = 2>'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]]||<font size = 2> 160740    ||&nbsp;<font size = 2>'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]]||align="right"|<font size = 2> 246320
 
|-
 
|<font size = 2>'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]]||<font size = 2> 163756    ||&nbsp;<font size = 2>'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]]||align="right"|<font size = 2> 262945
 
|-
 
|<font size = 2>'''17.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]]||<font size = 2> 168944    ||&nbsp;<font size = 2>'''7.''' [[:Category:100 GENERAL|EPG 100]]||align="right"|<font size = 2> 298401
 
|-
 
|<font size = 2>'''16.'''    [[751.50 Standard Detailing Notes|EPG 751.50]]||<font size = 2> 178568    ||&nbsp;<font size = 2>'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]]||align="right"|<font size = 2> 310210
 
|-
 
|<font size = 2>'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]]||<font size = 2> 179964    ||&nbsp;<font size = 2>'''5.'''  [[:Category:900 TRAFFIC CONTROL|EPG 900]]||align="right"|<font size = 2> 331020
 
|-
 
|<font size = 2>'''14.'''    [[:Category:903 Highway Signing|EPG 903]]||<font size = 2> 184924      ||&nbsp;<font size = 2>'''4.'''  [[:Category:101 Standard Forms|EPG 101]]||align="right"|<font size = 2> 340099
 
|-
 
|<font size = 2>'''13.'''    [[:Category:200 GEOMETRICS|EPG 200]]||<font size = 2> 185574  ||&nbsp;<font size = 2>'''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]] ||align="right"|<font size = 2> 362689
 
 
|-
 
|-
|<font size = 2>'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]]||<font size = 2> 203190  ||&nbsp;<font size = 2>'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]]||align="right"|<font size = 2> 428698
 
 
|-
 
|-
|width="130"|<font size = 2>'''11.'''    [[:Category:616 Temporary Traffic Control|EPG 616]]||<font size = 2> 207486  || width="150"|&nbsp;<font size = 2>'''1.''' EPG Main Page||align="right"|<font size = 2> 2799008
 
|}
 
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
'''[http://sharepoint/sites/de/epg/Lists/EPGResponse/Attachments/639/Consent%20Decree%20Initial%20Setup.pdf Consent Decree Initial Setup]
 
 
5/30/17: The number of disturbed acres when adding a project to the database, the prerequisite dates for the Inspection protocol and the "Date RE Assigned" were clarified on this QRG. 
 
 
'''18 in. Embedment in Concrete'''
 
 
5/19/17: Guidance in [[751.32 Concrete Pile Cap Intermediate Bents#751.32.3.2 Typical Pile Cap Bent|EPG 751.32 Concrete Pile Cap Intermediate Bents]], [[751.34 Concrete Pile Cap Non-Integral End Bents#751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders|EPG 751.34 Concrete Pile Cap Non-Integral End Bents]], [[751.35 Concrete Pile Cap Integral End Bents#751.35.3.3 Prestressed Girder End Bent |EPG 751.35.3 Dimensions]], [[751.39 Seal Course|EPG 751.39 Seal Course]] and [[751.50 Standard Detailing Notes#G7. Steel HP Pile|EPG 751.50 G7]] for pile cap bent, end bent and seal course was revised to show 18 in. embedment in concrete for all piles.
 
 
'''[[236.7 Negotiation#236.7.2.3 Prompt Offer of Just Compensation|EPG 236.7 Negotiation]]'''
 
 
5/12/17: The minimum offer of prompt offer of just compensation has been increased from $300 to $500.
 
 
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Course (CLC)]] and [[:Category:409 Seal Coat|Seal Coat]]'''
 
 
5/10/17: The Contract Leveling Course and Seal Coat guidelines as well as their respective JSP packages were updated.
 
 
'''[[:Category:137 Construction Inspection Guidance for Records to be Maintained|EPG 137 Construction Inspection Guidance for Records to be Maintained]]'''
 
 
5/1/17: Guidance was updated to reflect that project documents are now stored in eProjects.
 
 
'''[[460.3 Plant Inspection#If the sample and check|EPG 460.3.13 Asphalt Binder Sampling and Test Results]]'''
 
 
4/25/17: New guidance has been provided for handling failing binder samples and for when additional testing may take place. Also, recommended penalties are provided for failing binders at the different levels.
 
 
'''Girder Chair Details'''
 
 
4/11/17: In [[751.11 Bearings#751.11.3.6 Girder/Beam Chairs|EPG 751.11.3.6 Girder/Beam Chairs]], [[751.22 P/S Concrete I Girders#751.22.3.10 Closed Intermediate Bent Diaphragms|EPG 751.22.3.10 Closed Intermediate Bent Diaphragms]] and [[751.35 Concrete Pile Cap Integral End Bents#751.35.3 Dimensions|EPG 751.35.3 Dimensions]], girder chair details and end distances from center line of bearing to end of steel and prestressed girders were clarified.
 
 
'''New Corps of Engineers Regional Condition'''
 
 
4/10/17: [[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]] was updated with the new Corps of Engineers Regional Condition, which affects culvert design.
 
 
'''[[751.50 Standard Detailing Notes#H7. Slab Drains (Notes for Bridge Standard Drawings)|Slab Drain Standard Detailing Notes]]'''
 
 
4/6/17: The slab drain notes were correlated with all the slab drain standard drawings.
 
 
'''[[127.4 Wetlands and Streams#127.4.1.1 Overview|EPG 127.4 Wetlands and Streams]]'''
 
 
4/5/17: Guidance for classifying streams has been added.
 
 
'''Temporary Rumble Strips'''
 
 
3/29/17: Two location notes and the color of the rumbles in the legends of [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations|Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations]] and [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway|Fig. 616.6.87.2 Rumble Strip Placement on a Divided Highway]] were revised to aid designers in completing temporary traffic control plans.
 
 
'''eAgreements'''
 
 
3/27/17: [[:Category:153 Agreements and Contracts#153.1 The Agreement Process|EPG 153.1 The Agreement Process]] and [[:Category:235 Preliminary Plans#235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)|EPG 235.2.3 Municipal Agreements and County Agreements]] were updated to reflect the current eAgreement process.  In [[:Category:153 Agreements and Contracts|EPG 153 Agreements and Contracts]], the tables were updated to provide the current contract listings.
 
 
'''[[153.19 Right of Way|EPG 153.19 Right of Way]]'''
 
 
3/21/17:  RW agreement guidance has been updated to current procedures.
 
 
'''[[606.1 Guardrail#During the project development process|EPG 606.1.3.2 End Terminals, Crash Cushions and Anchors]]'''
 
 
3/20/17: Guidance about the grading limits was clarified when using MASH crashworthy end terminals for the exposed ends of all new runs of guardrail.
 
 
'''[[616.14 Work Zone Safety and Mobility Policy#616.14.10 Work Zone Transportation Management Plan|EPG 616.14.10 Work Zone Transportation Management Plan]]'''
 
 
3/17/17: Guidance for WZ Transportation Management was clarified.
 
 
'''[[751.50 Standard Detailing Notes#(H11.19)|Ornamental Pedestrian Fencing]]'''
 
 
3/17/17: A new standard detailing note is available to show that it is not required for AASHTO’s design live load for ornamental pedestrian fencing to be applied simultaneously.
 
 
'''Outdoor Advertising'''
 
 
3/16/17: in [[236.16 Outdoor Advertising#236.16.9.1 Substantially Rebuilt Conforming Out of Standard Outdoor Advertising|EPG 236.16.9.1 Substantially Rebuilt Conforming Out of Standard Outdoor Advertising]] and [[236.16 Outdoor Advertising#236.16.9.2 Deteriorated or Damaged Nonconforming Outdoor Advertising|EPG 236.16.9.2 Deteriorated or Damaged Nonconforming Outdoor Advertising]], the process for sending ODA courtesy letter was revised.
 
 
'''[[903.18 Other Signing Items#903.18.4 Object Markers for Obstructions Adjacent to the Roadway (MUTCD Section 2C.65)|EPG 903.18.4 Object Markers for Obstructions Adjacent to the Roadway]]'''
 
 
3/16/17: Object Marker usage policy was clarified, including new figures showing standard installation details.
 
 
'''[[751.22 P/S Concrete I Girders#When using straight strands|EPG 751.22.2.2 Prestressing Strands; Strand Arrangement Optimizing]]''' 
 
 
3/8/17:  New guidance for aligning NU top flange, straight and harped prestressing strands, when possible, in NU prestressed girders to aid in fabricating flange blockouts.
 
 
'''Bridge Memo and Design Layout Requirements'''
 
 
3/8/17: Guidance in [[751.1 Preliminary Design#19. Identify the bridge|EPG 751.1.2.18.2 Content]] and [[751.1 Preliminary Design#p. Identify the bridge|EPG 751.1.2.31 Finishing Up Design Layout]] for bridge approach slabs requirements for Bridge Memo and the Design Layout was expanded and clarified.
 
 
'''Galvanized Steel Pipes'''
 
 
3/7/17: Guidance in several articles, including [[751.1 Preliminary Design#751.1.2.20 Substructure Type|EPG 751.1.2.20 Substructure Type]] , [[751.32 Concrete Pile Cap Intermediate Bents#751.32.3 Details |EPG 751.32.3 Details]], [[751.36 Driven Piles#751.36.2 Steel Pile|EPG 751.36.2 Steel Pile]] and [[751.50 Standard Detailing Notes#E2. Foundation Data Table|EPG 751.50 Standard Detailing Notes E.2]], has been updated to require all steel pile (HP, Closed end CIP, Opened end CIP) to be galvanized.
 
 
'''[[:Category:821 Herbicides and Roadsides|EPG 821 Herbicides and Roadsides]]'''
 
 
2/23/17: Guidance for products has been updated for 2017.
 
 
'''[[media:Fig 104.7 2017.doc|Cost Estimate Guide for Rural Preliminary Design]] '''
 
 
2/21/17: In [[104.7 Estimates|EPG 104.7 Estimates]], the Cost Estimate Guide for rural preliminary design was updated.
 
 
'''[[236.7 Negotiation#236.7.4.5 Subordination of Mortgage Liens|EPG 236.7.4.5 Subordination of Mortgage Liens]]'''
 
 
2/17/17: Guidance about the Partial Deed of Release has been updated to reflect current practices.
 

Revision as of 08:59, 9 April 2020

EPG 2013b.jpg
Main Page Mission.jpg
Main Page Welcome.jpg
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.
MoDOT's MASH
Implementation
Information
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.
RECENT POLICY CHANGES
IN THE EPG
Information for Digitally Signing Documents

There are several documents (internal and external) that can be signed with digital signatures through PDF editing software. ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED. First you must set up your digital signature ID:

- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) Digital signature for Adobe Reader DC or Pro DC to set up your digital signature ID. If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature ID. Unless you work in Construction and Materials, skip Section 3 as well. Page 7 of these instructions will also look a little different due to software updates. The Sign Document window will most likely be Sign With a Digital ID; click on Continue. If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image). Otherwise you will enter your password and click on Sign.

- If you are a Bluebeam Revu user, please see Creating Digital IDs in Bluebeam Revu to set up your digital signature ID.

The following documents may be signed with the digital signatures methods above:

  • Professional Services Committee (PSC) Letters/Approvals
  • Design Exceptions
  • Letters to external partners
  • Expense Reports

If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.

This information will be updated as needed. Please check back often.

Other helpful documents and tips: