Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG Other Aspects of Pavement Design)
m
(107 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1030px|center]]
+
{|
 
+
|colspan="3" width=1030px| [[Image:EPG 2013b.jpg|1020px|center]]  
 
+
|-
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"
+
|colspan="3"| [[image:Main Page Mission.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]'''</i></font color="white">
+
|colspan="3"| [[image:Main Page Welcome.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
+
|style="background:#F8F8FF" colspan="1" rowspan="1" width=830px|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Highway Safety & Traffic], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning] and [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] guidance.|| valign="center" style="border: 7px solid #A9A9A9" align="right" width=150px| '''<Big><center>[[media:MASH Implementation.pdf|MoDOT's MASH<br/>Implementation<br/>Information]]</center> </Big>'''
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|colspan="3" background:white|
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white">
+
|style="border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#74BAAC" width="830px" align="center" rowspan="1"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]<br/>'''<font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">'''</i></font color="white"><br/>'''<font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white"></Big>||rowspan="1" valign="center" width="180px" cellspacing="3" cellpadding="3" style="border: 9px solid #DCEDEA; background:#f5f5f5" align="center" rowspan="1"|'''<big><font color="white"><i>[[Recent Policy Changes in the EPG|RECENT POLICY CHANGES<br/>IN THE EPG]]</i></font color="white"></big>'''
 
|}
 
|}
 
+
{|style="padding: 0.3em; margin-left:0px; border:2px solid #a9a9a9; text-align:center; font-size: 130%; background:#f5f5f5" width="1040px"|}
 
+
|'''Information for Digitally Signing Documents'''
 
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
|- valign="top" width="100%"
 
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
 
|-
 
|-
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
+
|style="text-align: left; font-size: 90%;"|
 +
There are several documents (internal and external) that can be signed with digital signatures through PDF editing software.  ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED.  First you must set up your digital signature ID:
  
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promisedInnovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.   
+
- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) [http://epg.modot.mo.gov/forms/CM/Digital_Signature_for_Adobe_Reader_DC_or_Pro_DC.docx Digital signature for Adobe Reader DC or Pro DC] to set up your digital signature ID.  If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature IDUnless you work in Construction and Materials, skip Section 3 as well.  Page 7 of these instructions will also look a little different due to software updates.  The Sign Document window will most likely be Sign With a Digital ID; click on Continue.  If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image).  Otherwise you will enter your password and click on Sign.   
  
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals.
+
- If you are a Bluebeam Revu user, please see [[media:Creating Digital IDs in Bluebeam Revu(2019).pdf|Creating Digital IDs in Bluebeam Revu]] to set up your digital signature ID.
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
+
The following documents may be signed with the digital signatures methods above:
 +
:::*Professional Services Committee (PSC) Letters/Approvals
 +
:::*Design Exceptions
 +
:::*Letters to external partners
 +
:::*Expense Reports
  
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
+
If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.
'''Asphalt Shoulder Surface Mix'''
 
  
1/25/19: Guidance in [[Other Aspects of Pavement Design#For resurfacing projects on roadways with shoulders 4|EPG Shoulder Surface]] was revised so that all shoulders 4 ft. and narrower, and when shoulder improvements are also anticipated as part of the scope of work, will be monolithically resurfaced with the same type of asphaltic mix used on the mainline roadway.
+
This information will be updated as needed. Please check back often.
  
'''[[413.3 Ultrathin Bonded Asphalt Wearing Surface#413.3.3 Maintenance Surface Treatment|EPG 413.3.3 Maintenance Surface Treatment]]'''
+
'''Other helpful documents and tips:'''
 
+
:::*[[media:Digital Signatures for Design Documents.pdf|Digital Signatures for Design Documents]] - this does not work with most Adobe Reader versions (contributed by Christopher Kelly, TPM in SL District).
1/25/19: The UBAWS Treatment policy was clarified, including the identification of the proper thicknesses for UBAWS types.
+
:::*See E-Construction general provision in the most recent version of the [http://www.modot.org/media/26947 General Provisions and Supplemental Specifications] for additional digital signature information (suggested by Christopher Crocker, TPD in SE District).
 
+
:::*[[media:Digitally Signing Preliminary Plans in ProjectWise.pdf|Digitally Signing Preliminary Plans in ProjectWise]] - this does not work with all versions of Adobe Acrobat Pro/DC (contributed by Don Saiko, TPM/Stacy Reese, ADE in SW District).
'''[[751.22 P/S Concrete I Girders#751.22.3.13 Intermediate Diaphragms|EPG 751.22.3.13 Intermediate Diaphragms]]'''
+
|-
 
+
|-
1/11/19: Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.
 
 
 
'''[[751.50 Standard Detailing Notes#(A3.5.1) Use when uncoated steel|Standard Detailing Note A3.5.1]]'''
 
 
 
1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.
 
 
 
'''[[127.25 Maintenance Environmental Policies#127.25.2 Hazardous Material Spills|EPG 127.25.2 Hazardous Material Spills]]'''
 
 
 
1/10/19: Guidance has been updated to current practice.
 
 
 
'''[[:Category:903 Highway Signing#Guidance for Using Sign Management System (SMS)|Guidance for Using Sign Management System]] and [[903.3 Post-Mounted Signing#903.3.16 Ordering Signs|EPG 903.3.16 Ordering Signs]]'''
 
 
 
1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available. 
 
 
 
'''[[236.3 Administration#The District Right of Way Manager|EPG 236.3.7 Right of Way Clearance Certification]]'''
 
 
 
1/8/19: Added guidance for the RW clearance process for projects programmed in the STIP with RW funding but that do not require RW to construct the project.
 
 
 
'''[[:Category:121 Project Planning, Prioritization and STIP Commitments|EPG 121 Project Planning, Prioritization and STIP Commitments]]'''
 
 
 
1/4/19: Guidance has been updated to current practice.  EPG 121.2 The Planning Process and EPG 121.5 Prioritization Factors were both re-written and re-titled as [[121.2 The Planning Framework for Transportation Decision-Making|EPG 121.2 The Planning Framework for Transportation Decision-Making]] and [[121.5 Asset Management|EPG 121.5 Asset Management]], respectively.
 
 
 
'''[[910.4 ITS Achitecture#Project ITS Architecture Documentations Requirements|EPG 910.4 ITS Achitecture]]
 
 
 
1/3/19: New guidance on completing a systems engineering analysis on all ITS projects is now available.
 
 
 
'''Weathering Steel'''
 
 
 
12/28/18: Guidance for the use of weathering steel has been added to [[751.1 Preliminary Design#Weathering steel may be used|EPG 751.1.2.9 Girder Type Selection]].
 
 
 
'''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]'''
 
 
 
12/28/18: The district now completes an RES at each project development milestone, or at least at the Location/Conceptual state and final design.
 
 
 
'''The “DBE Termination, Substitution or Additional Request” Form'''
 
 
 
12/18/18:  Guidance in [[:Category:108 Prosecution and Progress#2. For DBE requests,|EPG 108.1.1 Review and Approval of a Subcontract Request]] and [[:Category:108 Prosecution and Progress#Once a project is awarded,|EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting]] was clarified on the use of this form when a prime contractor proposes to terminate, substitute or add an additional DBE.
 
 
 
'''[[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]]'''
 
 
 
12/12/18: Guidance regarding submittals of a final RES and the requirement of only 1 RES for some projects has been updated.
 
 
 
'''TMA Light Bar'''
 
 
 
12/11/18: Guidance in [[:Category:612 Impact Attenuators#612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting|EPG 612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting]] and [[616.27 Fleet Lighting#616.27.1.1 Fleet Lighting Levels|EPG 616.27.1.1 Fleet Lighting Levels, Level 5]] has been updated to state that the Light Bar may be used and the Emergency Alert lights should be used on the Rear Advanced Warning Truck for striping and sweeping operations.  TA-35 MT and TA-35a-d MT were also updated.
 
 
 
'''[[media:104.7 EngFac SFY 16 to 18.pdf|Engineering Factors Report]]'''
 
 
 
12/10/18: The latest version of the Engineering Factors Report, providing SFY 2016 to SFY 2018 info, is now presented in [[104.7 Estimates|EPG 104.7 Estimates]].
 
 
 
'''[[413.6 Scrub Seal Treatment|EPG 413.6 Scrub Seal Treatment]]'''
 
 
 
12/10/18: Scrub seal treatment guidance is now available.
 
 
 
'''AASHTOWare Project Quick Reference Guides'''
 
 
 
12/10/18: [http://epg.modot.org/index.php/Category:101_Standard_Forms#AASHTOWare_Project_Quick_Reference_Guides_.28QRGs.29 AASHTOWare Project Quick Reference Guides] are now available in EPG 101 Standard Forms.
 
 
 
'''[[127.9 Floodplain Management and the Regulatory Floodway#127.9.2 Process|EPG 127.9.2 Process]]'''
 
 
 
12/4/18: Guidance to adhere to CFR 650.111 was added to the bottom of EPG 127.9.2.
 
 
 
'''[[127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents#127.15.3 Document Age|EPG 127.15.3 Document Age]]'''
 
 
 
11/30/18: Re-evaluations are required for all NEPA approvals that are more than 3 years old.
 
 
 
'''NEPA Glossary'''
 
 
 
11/29/18: A new [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.5 NEPA Glossary|glossary of NEPA terms]] is now available in EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents.
 
 
 
'''[[236.16 Outdoor Advertising#236.16.15 Vegetation Removal|EPG 236.16.15 Vegetation Removal]]'''
 
 
 
11/28/18: Guidance was updated, particularly in [[236.16 Outdoor Advertising#236.16.15.6 Endangered Species Act|EPG 236.16.15.6 Endangered Species Act]] and [[236.16 Outdoor Advertising#236.16.15.8 Mowing and Brush Hogging|EPG 236.16.15.8 Mowing and Brush Hogging]], to be in line with the Endangered Species Act
 
 
 
'''[[141.1 Cost Share Program|EPG 141.1 Cost Share Program]]'''
 
 
 
11/20/18: Guidance in EPG 141.1 Cost Share Program has been updated as approved by the Commission. The revisions will impact the program statewide.
 
 
 
'''[[236.4 Description Writing and Titles#Permanent Sidewalk Easement Clause|Permanent Sidewalk Easement Clause]]'''
 
 
 
11/19/18: In [[#236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions|EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions]], a permanent sidewalk easement clause is now available for districts' use.
 
 
 
'''[[:Category:105 Control of Work#Among subjects to be discussed|EPG 105.9.12 Preconstruction Conference]]'''
 
 
 
11/15:18: Subjects to be discussed at this conference now include review of the process to request any DBE termination, substitution or addition.
 
 
 
'''[[237.9 Submission of Plans and Supporting Documents#237.9.3.1 Schedule for Submittal|EPG 237.9.3.1 Schedule for Submittal]]'''
 
 
 
11/7/18: Guidance has been added about a required e-mail for re-let or moved projects.
 

Revision as of 08:59, 9 April 2020

EPG 2013b.jpg
Main Page Mission.jpg
Main Page Welcome.jpg
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.
MoDOT's MASH
Implementation
Information
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.
RECENT POLICY CHANGES
IN THE EPG
Information for Digitally Signing Documents

There are several documents (internal and external) that can be signed with digital signatures through PDF editing software. ONLY PDF DOCUMENTS CAN BE DIGITIALLY SIGNED. First you must set up your digital signature ID:

- If you are an Adobe Pro/Reader user, please see the Quick Reference Guide (QRG) Digital signature for Adobe Reader DC or Pro DC to set up your digital signature ID. If you are not including an image of your signature, you can skip Section 1 regarding capturing your signature image; go to Section 2 to set up your Adobe digital signature ID. Unless you work in Construction and Materials, skip Section 3 as well. Page 7 of these instructions will also look a little different due to software updates. The Sign Document window will most likely be Sign With a Digital ID; click on Continue. If you are including an image of your signature you will have to click on Create and follow the steps (also follow the directions in Section 1 for capturing your signature image). Otherwise you will enter your password and click on Sign.

- If you are a Bluebeam Revu user, please see Creating Digital IDs in Bluebeam Revu to set up your digital signature ID.

The following documents may be signed with the digital signatures methods above:

  • Professional Services Committee (PSC) Letters/Approvals
  • Design Exceptions
  • Letters to external partners
  • Expense Reports

If you are not sure if a document can be digitally signed, please reach out to your Assistant District/Division Engineers for guidance.

This information will be updated as needed. Please check back often.

Other helpful documents and tips: